Previous Main Next
Name & Description: Glen Cove Creek, NY- Section Included: A channel from Hempstead Harbor to Glen Cove Avenue. Controlling Depth: (1979) 8 feet from Hempstead Harbor to 1600 feet below head of project, thence 6 feet to about 850 feet from head of project. Project Depth: 8 feet. All at mean low water. Project Length: 1 mile.
Time: CY2014
Measure: Short Tons (#)

All Traffic Types (Domestic & Foreign)DomesticForeign
All Traffic DirectionsIntrawaterwayReceiptsShipmentsThroughAll Traffic DirectionsIntrawaterwayReceiptsShipmentsThroughAll Traffic DirectionsIntrawaterwayReceiptsShipmentsThrough
All  Commodities          48,272048,2720048,272048,2720000000
  40 Crude Materials, Inedible Except Fuels48,272048,2720048,272048,2720000000
    43 Soil, Sand, Gravel, Rock and Stone48,272048,2720048,272048,2720000000
      4331 Sand & Gravel48,272048,2720048,272048,2720000000