Back to Part-3 Next
Table of Contents
Name & Description Traffic Type
Sheet1 Alabaster, MI- All Traffic Types (Domestic & Foreign)
Sheet2 Alabaster, MI- Domestic
Sheet3 Alabaster, MI- Foreign
Sheet4 Algonac, MI- All Traffic Types (Domestic & Foreign)
Sheet5 Algonac, MI- Domestic
Sheet6 Algonac, MI- Foreign
Sheet7 Alpena, MI- Section Included: Lower 4,000 feet of river and private harbors north of mouth of Thunder Bay River. Controlling Depth: 21 feet in the bay section; 17 feet in river; 15 feet in turning basin. Project Depths: channel 21 feet deep from that depth in Thunder Bay to a point 2,500 feet lakeward of the lighthouse; thence 18.5 feet in river narrowing to 100-foot width at a point 700 feet upstream from the lighthouse; thence 100 feet wide and 18.5 feet deep to the Second Ave. Bridge;  thence 18.5 feet deep and 75 feet wide to the upper limits of the project; a turning tasin 15 feet deep by 3.7 acres at the upper end of project; and a turning basin 18.5 feet deep at the river mouth. Navigation season: March 15 to December 17. All Traffic Types (Domestic & Foreign)
Sheet8 Alpena, MI- Section Included: Lower 4,000 feet of river and private harbors north of mouth of Thunder Bay River. Controlling Depth: 21 feet in the bay section; 17 feet in river; 15 feet in turning basin. Project Depths: channel 21 feet deep from that depth in Thunder Bay to a point 2,500 feet lakeward of the lighthouse; thence 18.5 feet in river narrowing to 100-foot width at a point 700 feet upstream from the lighthouse; thence 100 feet wide and 18.5 feet deep to the Second Ave. Bridge;  thence 18.5 feet deep and 75 feet wide to the upper limits of the project; a turning tasin 15 feet deep by 3.7 acres at the upper end of project; and a turning basin 18.5 feet deep at the river mouth. Navigation season: March 15 to December 17. Domestic
Sheet9 Alpena, MI- Section Included: Lower 4,000 feet of river and private harbors north of mouth of Thunder Bay River. Controlling Depth: 21 feet in the bay section; 17 feet in river; 15 feet in turning basin. Project Depths: channel 21 feet deep from that depth in Thunder Bay to a point 2,500 feet lakeward of the lighthouse; thence 18.5 feet in river narrowing to 100-foot width at a point 700 feet upstream from the lighthouse; thence 100 feet wide and 18.5 feet deep to the Second Ave. Bridge;  thence 18.5 feet deep and 75 feet wide to the upper limits of the project; a turning tasin 15 feet deep by 3.7 acres at the upper end of project; and a turning basin 18.5 feet deep at the river mouth. Navigation season: March 15 to December 17. Foreign
Sheet10 Ashland, WI- Section Included: Entire harbor. Controlling and Project Depths: 27 feet in about westerly half of east basin and approach thereto, 25 feet in remainder of east basin, and 21 and 20 feet in the channel in western portion of the harbor. Controlling Depth: 20 feet along the southern portion of the 21 foot project depth area. Navigation Season: May 13 to November 26. All Traffic Types (Domestic & Foreign)
Sheet11 Ashland, WI- Section Included: Entire harbor. Controlling and Project Depths: 27 feet in about westerly half of east basin and approach thereto, 25 feet in remainder of east basin, and 21 and 20 feet in the channel in western portion of the harbor. Controlling Depth: 20 feet along the southern portion of the 21 foot project depth area. Navigation Season: May 13 to November 26. Domestic
Sheet12 Ashland, WI- Section Included: Entire harbor. Controlling and Project Depths: 27 feet in about westerly half of east basin and approach thereto, 25 feet in remainder of east basin, and 21 and 20 feet in the channel in western portion of the harbor. Controlling Depth: 20 feet along the southern portion of the 21 foot project depth area. Navigation Season: May 13 to November 26. Foreign
Sheet13 Ashtabula, OH- Section Included: Outer harbor and Ashtabula River from mouth to and including city of Ashtabula Dock (Former Great Lakes Engineering Works Dock), 1.75 miles. Controlling Depth: Westerly portion of outer harbor to inner breakwater& approach channel to docks east of inner breakwater, 26.0 feet turning basin in front of inner breakwater 21.5 feet; the approach to the Penn. Central Railroad Company's slip and the lower 2,000 feet of the Ashtabula River, 23 feet; thence to car fe rry slip, 10 feet; thence to a point 1,550 feet upstream from turning basin and including turning tasin, 3 feet. Project Depth: Entrance channel, 29 feet; westerly portion of outer harbor to inner breakwater, 28 feet; Approach Channel to docks east of inner breakwater, 28 feet; turning basin in the easterly portion of the outer harbor, 22 feet; channel from inside the Inner Breakwater to mouth of river and 2,000 feet upstream and approach channel to Penn. Central Railroad Company's slip, 2 7 feet; thence to car ferry slip, 18 feet; thence to a point 1,550 feet upstream from turning basin and including turning basin, 16 feet. All Traffic Types (Domestic & Foreign) Trips (#)
Sheet14 Ashtabula, OH- Section Included: Outer harbor and Ashtabula River from mouth to and including city of Ashtabula Dock (Former Great Lakes Engineering Works Dock), 1.75 miles. Controlling Depth: Westerly portion of outer harbor to inner breakwater& approach channel to docks east of inner breakwater, 26.0 feet turning basin in front of inner breakwater 21.5 feet; the approach to the Penn. Central Railroad Company's slip and the lower 2,000 feet of the Ashtabula River, 23 feet; thence to car fe rry slip, 10 feet; thence to a point 1,550 feet upstream from turning basin and including turning tasin, 3 feet. Project Depth: Entrance channel, 29 feet; westerly portion of outer harbor to inner breakwater, 28 feet; Approach Channel to docks east of inner breakwater, 28 feet; turning basin in the easterly portion of the outer harbor, 22 feet; channel from inside the Inner Breakwater to mouth of river and 2,000 feet upstream and approach channel to Penn. Central Railroad Company's slip, 2 7 feet; thence to car ferry slip, 18 feet; thence to a point 1,550 feet upstream from turning basin and including turning basin, 16 feet. Domestic Trips (#)
Sheet15 Ashtabula, OH- Section Included: Outer harbor and Ashtabula River from mouth to and including city of Ashtabula Dock (Former Great Lakes Engineering Works Dock), 1.75 miles. Controlling Depth: Westerly portion of outer harbor to inner breakwater& approach channel to docks east of inner breakwater, 26.0 feet turning basin in front of inner breakwater 21.5 feet; the approach to the Penn. Central Railroad Company's slip and the lower 2,000 feet of the Ashtabula River, 23 feet; thence to car fe rry slip, 10 feet; thence to a point 1,550 feet upstream from turning basin and including turning tasin, 3 feet. Project Depth: Entrance channel, 29 feet; westerly portion of outer harbor to inner breakwater, 28 feet; Approach Channel to docks east of inner breakwater, 28 feet; turning basin in the easterly portion of the outer harbor, 22 feet; channel from inside the Inner Breakwater to mouth of river and 2,000 feet upstream and approach channel to Penn. Central Railroad Company's slip, 2 7 feet; thence to car ferry slip, 18 feet; thence to a point 1,550 feet upstream from turning basin and including turning basin, 16 feet. Foreign Trips (#)
Sheet16 Bayfield, WI- All Traffic Types (Domestic & Foreign)
Sheet17 Bayfield, WI- Domestic
Sheet18 Bayfield, WI- Foreign
Sheet19 Buffalo Harbor, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal. Buffalo River from mouth to Conrail R. Y. Bridge, 5.5 miles. Buffalo Ship Canal, and Black Rock Canal to the Black Rock Lock. Controlling Depths: Outer area of south entrance channel, 30 feet; south entrance channel 29.0 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south breakwater and proceeding northerly 4,200 fee t, 23 feet; thence 27 feet to the International Salt Company and 23 feet in the remainder of the outer harbor to the north; new north entrance channel, 25 feet; Black Rock Canal, 21 feet; Buffalo River Entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Project Depth: Outer area of south entrance channel, 30 feet; south entrance channel 29 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south break water and proceeding northerly 4,200 feet, 23 feet. Middle section of the outer harbor, 27 feet; north outer harbor, 23 feet; north entrance channel, 25 feet; Buffalo River entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Black Rock Canal, 21 feet. All Traffic Types (Domestic & Foreign) Trips (#)
Sheet20 Buffalo Harbor, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal. Buffalo River from mouth to Conrail R. Y. Bridge, 5.5 miles. Buffalo Ship Canal, and Black Rock Canal to the Black Rock Lock. Controlling Depths: Outer area of south entrance channel, 30 feet; south entrance channel 29.0 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south breakwater and proceeding northerly 4,200 fee t, 23 feet; thence 27 feet to the International Salt Company and 23 feet in the remainder of the outer harbor to the north; new north entrance channel, 25 feet; Black Rock Canal, 21 feet; Buffalo River Entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Project Depth: Outer area of south entrance channel, 30 feet; south entrance channel 29 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south break water and proceeding northerly 4,200 feet, 23 feet. Middle section of the outer harbor, 27 feet; north outer harbor, 23 feet; north entrance channel, 25 feet; Buffalo River entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Black Rock Canal, 21 feet. Domestic Trips (#)
Sheet21 Buffalo Harbor, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal. Buffalo River from mouth to Conrail R. Y. Bridge, 5.5 miles. Buffalo Ship Canal, and Black Rock Canal to the Black Rock Lock. Controlling Depths: Outer area of south entrance channel, 30 feet; south entrance channel 29.0 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south breakwater and proceeding northerly 4,200 fee t, 23 feet; thence 27 feet to the International Salt Company and 23 feet in the remainder of the outer harbor to the north; new north entrance channel, 25 feet; Black Rock Canal, 21 feet; Buffalo River Entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Project Depth: Outer area of south entrance channel, 30 feet; south entrance channel 29 feet; southern portion of outer harbor, 28 feet; 900 feet wide section adjacent to the south breakwater beginning 2,000 feet north of the south break water and proceeding northerly 4,200 feet, 23 feet. Middle section of the outer harbor, 27 feet; north outer harbor, 23 feet; north entrance channel, 25 feet; Buffalo River entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Black Rock Canal, 21 feet. Foreign Trips (#)
Sheet22 Buffalo, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal, Buffalo River from mouth to Conrail RY Bridge 5.5 miles, Buffalo Ship Canal, Black Rock Canal, Black Rock Lock, Black Rock Channel, Niagara River, and Tonawanda to and including Buffalo Oil Terminal, Inc. Dock, located about 2,000 feet north of turning basin, Tonawanda inner Harbor, and Tonawanda Creek Channel from mouth to Main Street Bridge. Controlling and Project Depths: See Buffalo Harbor, Niagara River and Tona wanda. All Traffic Types (Domestic & Foreign)
Sheet23 Buffalo, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal, Buffalo River from mouth to Conrail RY Bridge 5.5 miles, Buffalo Ship Canal, Black Rock Canal, Black Rock Lock, Black Rock Channel, Niagara River, and Tonawanda to and including Buffalo Oil Terminal, Inc. Dock, located about 2,000 feet north of turning basin, Tonawanda inner Harbor, and Tonawanda Creek Channel from mouth to Main Street Bridge. Controlling and Project Depths: See Buffalo Harbor, Niagara River and Tona wanda. Domestic
Sheet24 Buffalo, NY- Section Included: Outer harbor, Lackawanna Canal, Union Canal, Buffalo River from mouth to Conrail RY Bridge 5.5 miles, Buffalo Ship Canal, Black Rock Canal, Black Rock Lock, Black Rock Channel, Niagara River, and Tonawanda to and including Buffalo Oil Terminal, Inc. Dock, located about 2,000 feet north of turning basin, Tonawanda inner Harbor, and Tonawanda Creek Channel from mouth to Main Street Bridge. Controlling and Project Depths: See Buffalo Harbor, Niagara River and Tona wanda. Foreign
Sheet25 Buffington, IN- All Traffic Types (Domestic & Foreign)
Sheet26 Buffington, IN- Domestic
Sheet27 Buffington, IN- Foreign
Sheet28 Burns Waterway Harbor, IN- Section Included: Approach channel, outer harbor, and two harbor arms. Project Depth: 30 feet in approach channel, 28 feet in outer harbor, and 27 feet in the east and west harbor arms. All Traffic Types (Domestic & Foreign)
Sheet29 Burns Waterway Harbor, IN- Section Included: Approach channel, outer harbor, and two harbor arms. Project Depth: 30 feet in approach channel, 28 feet in outer harbor, and 27 feet in the east and west harbor arms. Domestic
Sheet30 Burns Waterway Harbor, IN- Section Included: Approach channel, outer harbor, and two harbor arms. Project Depth: 30 feet in approach channel, 28 feet in outer harbor, and 27 feet in the east and west harbor arms. Foreign
Sheet31 Calcite, MI- All Traffic Types (Domestic & Foreign)
Sheet32 Calcite, MI- Domestic
Sheet33 Calcite, MI- Foreign
Sheet34 Charlevoix, MI- Section Included: Entrance channel and entire area of Round Lake and Lake Charlevoix, including Advance, Boyne City and East Jordan. Controlling Depth: 18 feet. Project Depth: 23 feet. All Traffic Types (Domestic & Foreign)
Sheet35 Charlevoix, MI- Section Included: Entrance channel and entire area of Round Lake and Lake Charlevoix, including Advance, Boyne City and East Jordan. Controlling Depth: 18 feet. Project Depth: 23 feet. Domestic
Sheet36 Charlevoix, MI- Section Included: Entrance channel and entire area of Round Lake and Lake Charlevoix, including Advance, Boyne City and East Jordan. Controlling Depth: 18 feet. Project Depth: 23 feet. Foreign
Sheet37 Cheboygan, MI- Section Included: Entrance channel and 3,500 feet of river. Controlling Depth: 21 feet to East First Street, including turning basin, and 18.5 feet to the State Road Bridge. Project Depth: 21 feet to East First Street; 18.5 feet to the State Road Bridge; 8.5 feet above the State Road Bridge to Lock in Cheboygan River; 21 feet in turning basin. Navigation season: 14 April to 9 December. All Traffic Types (Domestic & Foreign)
Sheet38 Cheboygan, MI- Section Included: Entrance channel and 3,500 feet of river. Controlling Depth: 21 feet to East First Street, including turning basin, and 18.5 feet to the State Road Bridge. Project Depth: 21 feet to East First Street; 18.5 feet to the State Road Bridge; 8.5 feet above the State Road Bridge to Lock in Cheboygan River; 21 feet in turning basin. Navigation season: 14 April to 9 December. Domestic
Sheet39 Cheboygan, MI- Section Included: Entrance channel and 3,500 feet of river. Controlling Depth: 21 feet to East First Street, including turning basin, and 18.5 feet to the State Road Bridge. Project Depth: 21 feet to East First Street; 18.5 feet to the State Road Bridge; 8.5 feet above the State Road Bridge to Lock in Cheboygan River; 21 feet in turning basin. Navigation season: 14 April to 9 December. Foreign
Sheet40 Chicago Harbor, IL- Section Included: Protected area on lakefront from Oak Street to Roosevelt Road and Chicago River entrance to Rush Street. Project Depth: 29 feet in the lake approach channel, 28 feet in the channel and maneuver area to the east end of Navy Pier, then 21 feet in the approach to the lock and in the Chicago River entrance to Rush Street. All Traffic Types (Domestic & Foreign)
Sheet41 Chicago Harbor, IL- Section Included: Protected area on lakefront from Oak Street to Roosevelt Road and Chicago River entrance to Rush Street. Project Depth: 29 feet in the lake approach channel, 28 feet in the channel and maneuver area to the east end of Navy Pier, then 21 feet in the approach to the lock and in the Chicago River entrance to Rush Street. Domestic
Sheet42 Chicago Harbor, IL- Section Included: Protected area on lakefront from Oak Street to Roosevelt Road and Chicago River entrance to Rush Street. Project Depth: 29 feet in the lake approach channel, 28 feet in the channel and maneuver area to the east end of Navy Pier, then 21 feet in the approach to the lock and in the Chicago River entrance to Rush Street. Foreign
Sheet43 Chicago, IL- Section Included: Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. Project Depth: See Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. All Traffic Types (Domestic & Foreign)
Sheet44 Chicago, IL- Section Included: Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. Project Depth: See Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. Domestic
Sheet45 Chicago, IL- Section Included: Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. Project Depth: See Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL, Calumet Harbor and River, IL and IN. Foreign
Sheet46 Cleveland, OH- Section Included: Outer Harbor, Old River and Cuyahoga River from mouth to and including Upper Republic Steel Corp. Dock, immediately downstream from Norfolk & Western Railway Bridge, 5.8 miles. Controlling Depth: Lake Approach Channel, 29 feet; entrance channel, West Basin and westerly 800 feet of East Basin, 28 feet; easterly 3800-foot length of East Basin, 27 feet; 500-foot channel through East Outer Harbor, 25 feet; channel between piers to Conrail Railroad Bridge, 27.0 f eet; channel in Cuyahoga River from Penn Central Railroad to upperproject limit, 22 feet; turning basin upstream from E.I. Dupont De Nemours And Company, Inc., Grasselli Chemical Division Dock, 19.5 feet; Old River to Sand Products Corporation Dock, 23 feet; remainder of Old River to upper project limit, 14 feet. Project Depth: Lake Approach Channel, 29 feet; West Basin, entrance channel and west end of East Basin, 28 feet; remaining 3800-foot length of East Basin, 27 feet; 500-foot channel t hrough East Outer Harbor,25 feet; lower Cuyahoga River from lakeward ends of the piers to immediately above junction with Old River, 27 feet; Old River to upper project limit, 27 feet; remainder of Cuyahoga River, 23 feet; turning basin upstream from E.I. Dupont De Nemours and Company, Inc., Grasseli Chemical Division Dock, 18 feet. All Traffic Types (Domestic & Foreign) Trips (#)
Sheet47 Cleveland, OH- Section Included: Outer Harbor, Old River and Cuyahoga River from mouth to and including Upper Republic Steel Corp. Dock, immediately downstream from Norfolk & Western Railway Bridge, 5.8 miles. Controlling Depth: Lake Approach Channel, 29 feet; entrance channel, West Basin and westerly 800 feet of East Basin, 28 feet; easterly 3800-foot length of East Basin, 27 feet; 500-foot channel through East Outer Harbor, 25 feet; channel between piers to Conrail Railroad Bridge, 27.0 f eet; channel in Cuyahoga River from Penn Central Railroad to upperproject limit, 22 feet; turning basin upstream from E.I. Dupont De Nemours And Company, Inc., Grasselli Chemical Division Dock, 19.5 feet; Old River to Sand Products Corporation Dock, 23 feet; remainder of Old River to upper project limit, 14 feet. Project Depth: Lake Approach Channel, 29 feet; West Basin, entrance channel and west end of East Basin, 28 feet; remaining 3800-foot length of East Basin, 27 feet; 500-foot channel t hrough East Outer Harbor,25 feet; lower Cuyahoga River from lakeward ends of the piers to immediately above junction with Old River, 27 feet; Old River to upper project limit, 27 feet; remainder of Cuyahoga River, 23 feet; turning basin upstream from E.I. Dupont De Nemours and Company, Inc., Grasseli Chemical Division Dock, 18 feet. Domestic Trips (#)
Sheet48 Cleveland, OH- Section Included: Outer Harbor, Old River and Cuyahoga River from mouth to and including Upper Republic Steel Corp. Dock, immediately downstream from Norfolk & Western Railway Bridge, 5.8 miles. Controlling Depth: Lake Approach Channel, 29 feet; entrance channel, West Basin and westerly 800 feet of East Basin, 28 feet; easterly 3800-foot length of East Basin, 27 feet; 500-foot channel through East Outer Harbor, 25 feet; channel between piers to Conrail Railroad Bridge, 27.0 f eet; channel in Cuyahoga River from Penn Central Railroad to upperproject limit, 22 feet; turning basin upstream from E.I. Dupont De Nemours And Company, Inc., Grasselli Chemical Division Dock, 19.5 feet; Old River to Sand Products Corporation Dock, 23 feet; remainder of Old River to upper project limit, 14 feet. Project Depth: Lake Approach Channel, 29 feet; West Basin, entrance channel and west end of East Basin, 28 feet; remaining 3800-foot length of East Basin, 27 feet; 500-foot channel t hrough East Outer Harbor,25 feet; lower Cuyahoga River from lakeward ends of the piers to immediately above junction with Old River, 27 feet; Old River to upper project limit, 27 feet; remainder of Cuyahoga River, 23 feet; turning basin upstream from E.I. Dupont De Nemours and Company, Inc., Grasseli Chemical Division Dock, 18 feet. Foreign Trips (#)
Sheet49 Conneaut, OH- Section Included: Outer harbor and Conneaut River 2,450 feet upstream of the outer end of the West Pier. Controlling Depth: Westerly portion of outer harbor, 20.5 feet; access channel to city dock, 7.5 feet; easterly portion of outer harbor 23 feet. Inner Harbor, 28. feet; Project Depth: Easterly portion of outer harbor, 28 feet; westerly portion of outer harbor, 22 feet; access channel to city dock 8 feet: Inner Harbor, 27 feet. All Traffic Types (Domestic & Foreign)
Sheet50 Conneaut, OH- Section Included: Outer harbor and Conneaut River 2,450 feet upstream of the outer end of the West Pier. Controlling Depth: Westerly portion of outer harbor, 20.5 feet; access channel to city dock, 7.5 feet; easterly portion of outer harbor 23 feet. Inner Harbor, 28. feet; Project Depth: Easterly portion of outer harbor, 28 feet; westerly portion of outer harbor, 22 feet; access channel to city dock 8 feet: Inner Harbor, 27 feet. Domestic
Sheet51 Conneaut, OH- Section Included: Outer harbor and Conneaut River 2,450 feet upstream of the outer end of the West Pier. Controlling Depth: Westerly portion of outer harbor, 20.5 feet; access channel to city dock, 7.5 feet; easterly portion of outer harbor 23 feet. Inner Harbor, 28. feet; Project Depth: Easterly portion of outer harbor, 28 feet; westerly portion of outer harbor, 22 feet; access channel to city dock 8 feet: Inner Harbor, 27 feet. Foreign
Sheet52 Detour, MI- Section Included: American Shore of St. Marys River in the vicinity of Detour, MI. Controlling Depth: 29.0 feet from Lake Superior, 29 feet to Lake Superior; 29 feet to and from Lake Huron. Project Depth: See St. Marys River. All Traffic Types (Domestic & Foreign)
Sheet53 Detour, MI- Section Included: American Shore of St. Marys River in the vicinity of Detour, MI. Controlling Depth: 29.0 feet from Lake Superior, 29 feet to Lake Superior; 29 feet to and from Lake Huron. Project Depth: See St. Marys River. Domestic
Sheet54 Detour, MI- Section Included: American Shore of St. Marys River in the vicinity of Detour, MI. Controlling Depth: 29.0 feet from Lake Superior, 29 feet to Lake Superior; 29 feet to and from Lake Huron. Project Depth: See St. Marys River. Foreign
Sheet55 Detroit Harbor, MI- Section Included: U.S. bank of Detroit River from Lake St. Clair to western extreme of Zug Island. Controlling Depth: Channel north of Belle Isle 21 feet, remainder of river 25-28.5 feet. Project Depth: 28.5 feet except channel north of Belle Isle, 21 feet. All Traffic Types (Domestic & Foreign)
Sheet56 Detroit Harbor, MI- Section Included: U.S. bank of Detroit River from Lake St. Clair to western extreme of Zug Island. Controlling Depth: Channel north of Belle Isle 21 feet, remainder of river 25-28.5 feet. Project Depth: 28.5 feet except channel north of Belle Isle, 21 feet. Domestic
Sheet57 Detroit Harbor, MI- Section Included: U.S. bank of Detroit River from Lake St. Clair to western extreme of Zug Island. Controlling Depth: Channel north of Belle Isle 21 feet, remainder of river 25-28.5 feet. Project Depth: 28.5 feet except channel north of Belle Isle, 21 feet. Foreign
Sheet58 Detroit Harbor, WI- All Traffic Types (Domestic & Foreign)
Sheet59 Detroit Harbor, WI- Domestic
Sheet60 Detroit Harbor, WI- Foreign
Sheet61 Detroit, MI- Section Included: Detroit Harbor, Rouge River, Ecorse, Wyandotte, Riverview and Trenton. Controlling and Project Depths: See aforementioned project descriptions. All Traffic Types (Domestic & Foreign)
Sheet62 Detroit, MI- Section Included: Detroit Harbor, Rouge River, Ecorse, Wyandotte, Riverview and Trenton. Controlling and Project Depths: See aforementioned project descriptions. Domestic
Sheet63 Detroit, MI- Section Included: Detroit Harbor, Rouge River, Ecorse, Wyandotte, Riverview and Trenton. Controlling and Project Depths: See aforementioned project descriptions. Foreign
Sheet64 Drummond Island, MI- Section Included: Private loading dock on St. Marys River at Drummond Island, MI. Controlling Depths: 30 feet to and from Lake Huron; 27.0 feet to and from Lake Superior; 27.0 feet to Lake Superior; 23 feet at dock. Project Depth: See St. Marys River. All Traffic Types (Domestic & Foreign)
Sheet65 Drummond Island, MI- Section Included: Private loading dock on St. Marys River at Drummond Island, MI. Controlling Depths: 30 feet to and from Lake Huron; 27.0 feet to and from Lake Superior; 27.0 feet to Lake Superior; 23 feet at dock. Project Depth: See St. Marys River. Domestic
Sheet66 Drummond Island, MI- Section Included: Private loading dock on St. Marys River at Drummond Island, MI. Controlling Depths: 30 feet to and from Lake Huron; 27.0 feet to and from Lake Superior; 27.0 feet to Lake Superior; 23 feet at dock. Project Depth: See St. Marys River. Foreign
Sheet67 Duluth-Superior, MN and WI- Section Included: Superior Bay and its tributaries, St. Louis Bay and St. Louis River, and Allouez Bay. Controlling Depth: 32 feet in lake approaches, diminishing to a minimum of 20 feet in certain inner channels; there are numerous 1-2 foot shoals scattered in portions of the Duluth and Superior Harbor Basins. Project Depth: 32 feet in lake approaches; 27 feet in Duluth and Superior Harbor Basins, superior front channel, and in ore-channel routes through north  and south channels to D. M. & I. R. R.Y. ore docks; 27 feet in Howards Bay and Allouez Bay; 23 feet in remaining portion of south, upper, and Minnesota channels to Hallet Dock No. 6; and 20 feet from thence to northerly end of Clough Island. Navigation Season: April 3 to January 11. All Traffic Types (Domestic & Foreign)
Sheet68 Duluth-Superior, MN and WI- Section Included: Superior Bay and its tributaries, St. Louis Bay and St. Louis River, and Allouez Bay. Controlling Depth: 32 feet in lake approaches, diminishing to a minimum of 20 feet in certain inner channels; there are numerous 1-2 foot shoals scattered in portions of the Duluth and Superior Harbor Basins. Project Depth: 32 feet in lake approaches; 27 feet in Duluth and Superior Harbor Basins, superior front channel, and in ore-channel routes through north  and south channels to D. M. & I. R. R.Y. ore docks; 27 feet in Howards Bay and Allouez Bay; 23 feet in remaining portion of south, upper, and Minnesota channels to Hallet Dock No. 6; and 20 feet from thence to northerly end of Clough Island. Navigation Season: April 3 to January 11. Domestic
Sheet69 Duluth-Superior, MN and WI- Section Included: Superior Bay and its tributaries, St. Louis Bay and St. Louis River, and Allouez Bay. Controlling Depth: 32 feet in lake approaches, diminishing to a minimum of 20 feet in certain inner channels; there are numerous 1-2 foot shoals scattered in portions of the Duluth and Superior Harbor Basins. Project Depth: 32 feet in lake approaches; 27 feet in Duluth and Superior Harbor Basins, superior front channel, and in ore-channel routes through north  and south channels to D. M. & I. R. R.Y. ore docks; 27 feet in Howards Bay and Allouez Bay; 23 feet in remaining portion of south, upper, and Minnesota channels to Hallet Dock No. 6; and 20 feet from thence to northerly end of Clough Island. Navigation Season: April 3 to January 11. Foreign
Sheet70 Dunkirk, NY- Section Included: City water frontage protected by west pier and breakwater west of Elk Street. Controlling depth: Entrance channel in lake, 17 feet; inner channel and basin, 16 feet. Project Depth: Entrance channel in lake, 17 feet; inner channel and basin, 16 feet. Navigation season: Opened 29 March; closed 18 December. All Traffic Types (Domestic & Foreign)
Sheet71 Dunkirk, NY- Section Included: City water frontage protected by west pier and breakwater west of Elk Street. Controlling depth: Entrance channel in lake, 17 feet; inner channel and basin, 16 feet. Project Depth: Entrance channel in lake, 17 feet; inner channel and basin, 16 feet. Navigation season: Opened 29 March; closed 18 December. Domestic
Sheet72 Dunkirk, NY- Section Included: City water frontage protected by west pier and breakwater west of Elk Street. Controlling depth: Entrance channel in lake, 17 feet; inner channel and basin, 16 feet. Project Depth: Entrance channel in lake, 17 feet; inner channel and basin, 16 feet. Navigation season: Opened 29 March; closed 18 December. Foreign
Sheet73 Ecorse, MI- Section Included: U.S. shore of Detroit River from Great Lakes Avenue. to Ecorse River. Controlling Depth: 26.5 feet. Project Depth: 28.5 feet. All Traffic Types (Domestic & Foreign)
Sheet74 Ecorse, MI- Section Included: U.S. shore of Detroit River from Great Lakes Avenue. to Ecorse River. Controlling Depth: 26.5 feet. Project Depth: 28.5 feet. Domestic
Sheet75 Ecorse, MI- Section Included: U.S. shore of Detroit River from Great Lakes Avenue. to Ecorse River. Controlling Depth: 26.5 feet. Project Depth: 28.5 feet. Foreign
Sheet76 Erie, PA- Section Included: Southerly side of Erie Harbor and Lake Erie water frontage from harbor entrance eastward to and including Sun Oil Co dock, 3.5 miles. Controlling Depth: Entrance channel, 29 feet; channel to easterly coal and ore docks, 27 feet; and 27 feet to the Port Authority Dock; harbor basin, 21 feet; westerly portion of harbor, 18 feet. Project Depth: Entrance channel, 29 feet; Approach Channel to easterly coal and ore docks, 28 feet; approach to Port Authority Docks, 2 7 feet; Harbor Basin, 21 feet; westerly portion of Harbor Basin, 18 feet. The approach channel from the 28 foot channel to and including turning basin at westerly docks has been authorized, but never completed and considered inactive at the present time. All Traffic Types (Domestic & Foreign)
Sheet77 Erie, PA- Section Included: Southerly side of Erie Harbor and Lake Erie water frontage from harbor entrance eastward to and including Sun Oil Co dock, 3.5 miles. Controlling Depth: Entrance channel, 29 feet; channel to easterly coal and ore docks, 27 feet; and 27 feet to the Port Authority Dock; harbor basin, 21 feet; westerly portion of harbor, 18 feet. Project Depth: Entrance channel, 29 feet; Approach Channel to easterly coal and ore docks, 28 feet; approach to Port Authority Docks, 2 7 feet; Harbor Basin, 21 feet; westerly portion of Harbor Basin, 18 feet. The approach channel from the 28 foot channel to and including turning basin at westerly docks has been authorized, but never completed and considered inactive at the present time. Domestic
Sheet78 Erie, PA- Section Included: Southerly side of Erie Harbor and Lake Erie water frontage from harbor entrance eastward to and including Sun Oil Co dock, 3.5 miles. Controlling Depth: Entrance channel, 29 feet; channel to easterly coal and ore docks, 27 feet; and 27 feet to the Port Authority Dock; harbor basin, 21 feet; westerly portion of harbor, 18 feet. Project Depth: Entrance channel, 29 feet; Approach Channel to easterly coal and ore docks, 28 feet; approach to Port Authority Docks, 2 7 feet; Harbor Basin, 21 feet; westerly portion of Harbor Basin, 18 feet. The approach channel from the 28 foot channel to and including turning basin at westerly docks has been authorized, but never completed and considered inactive at the present time. Foreign
Sheet79 Escanaba, MI- All Traffic Types (Domestic & Foreign)
Sheet80 Escanaba, MI- Domestic
Sheet81 Escanaba, MI- Foreign
Sheet82 Fairport Harbor, OH- Section Included: Outer harbor and Grand River from mouth to and including Diamond Alkali Company Stone Dock, 1.5 miles. Controlling Depths: Entrance Channel, 24 feet; Outer Harbor, 24.0 feet; Grand River to upstream of Republic Steel, 19.0 feet; remaining length of Grand River to the upper project limit, 19 feet; except for 1,000 feet of the upstream end of the west side of the channel, 5 feet; turning basin, 15 feet. Maintenance Depths: Entrance channel and outer ha rbor, 25 feet; Grand River to upstream of Republic Steel, 24 feet; remaining length of Grand River to the upper project limits, 21 feet: turning basin, 18 feet. All Traffic Types (Domestic & Foreign)
Sheet83 Fairport Harbor, OH- Section Included: Outer harbor and Grand River from mouth to and including Diamond Alkali Company Stone Dock, 1.5 miles. Controlling Depths: Entrance Channel, 24 feet; Outer Harbor, 24.0 feet; Grand River to upstream of Republic Steel, 19.0 feet; remaining length of Grand River to the upper project limit, 19 feet; except for 1,000 feet of the upstream end of the west side of the channel, 5 feet; turning basin, 15 feet. Maintenance Depths: Entrance channel and outer ha rbor, 25 feet; Grand River to upstream of Republic Steel, 24 feet; remaining length of Grand River to the upper project limits, 21 feet: turning basin, 18 feet. Domestic
Sheet84 Fairport Harbor, OH- Section Included: Outer harbor and Grand River from mouth to and including Diamond Alkali Company Stone Dock, 1.5 miles. Controlling Depths: Entrance Channel, 24 feet; Outer Harbor, 24.0 feet; Grand River to upstream of Republic Steel, 19.0 feet; remaining length of Grand River to the upper project limit, 19 feet; except for 1,000 feet of the upstream end of the west side of the channel, 5 feet; turning basin, 15 feet. Maintenance Depths: Entrance channel and outer ha rbor, 25 feet; Grand River to upstream of Republic Steel, 24 feet; remaining length of Grand River to the upper project limits, 21 feet: turning basin, 18 feet. Foreign
Sheet85 Gary, IN- All Traffic Types (Domestic & Foreign)
Sheet86 Gary, IN- Domestic
Sheet87 Gary, IN- Foreign
Sheet88 Gladstone, MI- Section Included: Entire harbor including Kipling, Mich. Controlling and project depths: 24 feet at Kipling Channel & Turning Basin. All Traffic Types (Domestic & Foreign)
Sheet89 Gladstone, MI- Section Included: Entire harbor including Kipling, Mich. Controlling and project depths: 24 feet at Kipling Channel & Turning Basin. Domestic
Sheet90 Gladstone, MI- Section Included: Entire harbor including Kipling, Mich. Controlling and project depths: 24 feet at Kipling Channel & Turning Basin. Foreign
Sheet91 Grand Haven, MI- Section Included: Entire harbor, including Ferrysburg and Spring Lake; and Grand River from Grand Trunk RY. Bridge at Ferrysburg to Bass River about 15 miles. Controlling Depths: 22 feet in entrance channel; 21 feet to the mouth of the south channel; 21 feet to the sag; 20 feet to Grand Trunk RY. Bridge at Ferrysburg; 18 feet in the Turning Basin; 17 feet in channel to Spring Lake; thence 8 feet to mile 17.0 and 5 feet to the end of the project. Project Depths: 23 feet in entrance channel; 21 feet to Ferrysburg; 18 feet in channel to Spring Lake; 8 feet to mouth of Bass River. Navigation season: March 1 to December 31. All Traffic Types (Domestic & Foreign)
Sheet92 Grand Haven, MI- Section Included: Entire harbor, including Ferrysburg and Spring Lake; and Grand River from Grand Trunk RY. Bridge at Ferrysburg to Bass River about 15 miles. Controlling Depths: 22 feet in entrance channel; 21 feet to the mouth of the south channel; 21 feet to the sag; 20 feet to Grand Trunk RY. Bridge at Ferrysburg; 18 feet in the Turning Basin; 17 feet in channel to Spring Lake; thence 8 feet to mile 17.0 and 5 feet to the end of the project. Project Depths: 23 feet in entrance channel; 21 feet to Ferrysburg; 18 feet in channel to Spring Lake; 8 feet to mouth of Bass River. Navigation season: March 1 to December 31. Domestic
Sheet93 Grand Haven, MI- Section Included: Entire harbor, including Ferrysburg and Spring Lake; and Grand River from Grand Trunk RY. Bridge at Ferrysburg to Bass River about 15 miles. Controlling Depths: 22 feet in entrance channel; 21 feet to the mouth of the south channel; 21 feet to the sag; 20 feet to Grand Trunk RY. Bridge at Ferrysburg; 18 feet in the Turning Basin; 17 feet in channel to Spring Lake; thence 8 feet to mile 17.0 and 5 feet to the end of the project. Project Depths: 23 feet in entrance channel; 21 feet to Ferrysburg; 18 feet in channel to Spring Lake; 8 feet to mouth of Bass River. Navigation season: March 1 to December 31. Foreign
Sheet94 Grand Marais Harbor (Harbor of Refuge), MI- All Traffic Types (Domestic & Foreign)
Sheet95 Grand Marais Harbor (Harbor of Refuge), MI- Domestic
Sheet96 Grand Marais Harbor (Harbor of Refuge), MI- Foreign
Sheet97 Grand Marais, MN- All Traffic Types (Domestic & Foreign)
Sheet98 Grand Marais, MN- Domestic
Sheet99 Grand Marais, MN- Foreign
Sheet100 Green Bay, WI- Section Included: Outer channel, channel through the city of Green Bay and upper river channel to city of De Pere. Controlling and project depths: 26 feet in outer channel to Grassy Island; 24 feet in the entrance channel and river channel to a point 1,700 feet upstream from the C. & N. W. R. R. Bridge; 24 feet in the turning basin at the mouth of the East River; 20 feet in the turning basin above the C. & N. W. R. R. Bridge; 18 feet in the upper river channel and turning bas in at the city of De Pere. All Traffic Types (Domestic & Foreign)
Sheet101 Green Bay, WI- Section Included: Outer channel, channel through the city of Green Bay and upper river channel to city of De Pere. Controlling and project depths: 26 feet in outer channel to Grassy Island; 24 feet in the entrance channel and river channel to a point 1,700 feet upstream from the C. & N. W. R. R. Bridge; 24 feet in the turning basin at the mouth of the East River; 20 feet in the turning basin above the C. & N. W. R. R. Bridge; 18 feet in the upper river channel and turning bas in at the city of De Pere. Domestic
Sheet102 Green Bay, WI- Section Included: Outer channel, channel through the city of Green Bay and upper river channel to city of De Pere. Controlling and project depths: 26 feet in outer channel to Grassy Island; 24 feet in the entrance channel and river channel to a point 1,700 feet upstream from the C. & N. W. R. R. Bridge; 24 feet in the turning basin at the mouth of the East River; 20 feet in the turning basin above the C. & N. W. R. R. Bridge; 18 feet in the upper river channel and turning bas in at the city of De Pere. Foreign
Sheet103 Harbor Beach, MI- Section Included: Entrance channel and anchorage area at Harbor Beach, Mich. Controlling Depth: 20 feet in the entrance channel, 14 to 16 feet in the anchorage area. Project Depth: 23 feet in the entrance channel; 21 feet in the anchorage area. Navigation season: 20 April to 14 December. All Traffic Types (Domestic & Foreign)
Sheet104 Harbor Beach, MI- Section Included: Entrance channel and anchorage area at Harbor Beach, Mich. Controlling Depth: 20 feet in the entrance channel, 14 to 16 feet in the anchorage area. Project Depth: 23 feet in the entrance channel; 21 feet in the anchorage area. Navigation season: 20 April to 14 December. Domestic
Sheet105 Harbor Beach, MI- Section Included: Entrance channel and anchorage area at Harbor Beach, Mich. Controlling Depth: 20 feet in the entrance channel, 14 to 16 feet in the anchorage area. Project Depth: 23 feet in the entrance channel; 21 feet in the anchorage area. Navigation season: 20 April to 14 December. Foreign
Sheet106 Holland, MI- Section Included: Controlling Depths: Entrance channel - 23 feet decreasing to 20 feet at the outer end of the inner pier; thence a controlling depth of 19 feet for a channel through Lake Macatawa to the wharves in Holland, Michigan, a Turning Basin 18 feet deep, a channel in Black River 21 feet deep and a settling basin with a project depth of 17 feet above the Black River channel to the State Street Bridge. Navigation season: March 13 to December 31. All Traffic Types (Domestic & Foreign)
Sheet107 Holland, MI- Section Included: Controlling Depths: Entrance channel - 23 feet decreasing to 20 feet at the outer end of the inner pier; thence a controlling depth of 19 feet for a channel through Lake Macatawa to the wharves in Holland, Michigan, a Turning Basin 18 feet deep, a channel in Black River 21 feet deep and a settling basin with a project depth of 17 feet above the Black River channel to the State Street Bridge. Navigation season: March 13 to December 31. Domestic
Sheet108 Holland, MI- Section Included: Controlling Depths: Entrance channel - 23 feet decreasing to 20 feet at the outer end of the inner pier; thence a controlling depth of 19 feet for a channel through Lake Macatawa to the wharves in Holland, Michigan, a Turning Basin 18 feet deep, a channel in Black River 21 feet deep and a settling basin with a project depth of 17 feet above the Black River channel to the State Street Bridge. Navigation season: March 13 to December 31. Foreign
Sheet109 Huron, OH- Section Included: Lake approach channel from deep water to a point opposite the outer end of east breakwater; entrance channel from its junction with the approach channel to its junction with the River Channel; River channel and turning basin to within 1,500 feet of the Penn Central Railroad Bridge. Controlling Depths: Lake approach and entrance channel, 27.5 feet; river channel, 27 feet; turning basin, 21 feet. Project Depths: Lake approach and entrance channels, 29 feet; river channel to Slip No. 1, 28 feet; from Slip No. 1 through eastern portion of the turning basin, 28 feet; turning basin, 22 feet. All Traffic Types (Domestic & Foreign)
Sheet110 Huron, OH- Section Included: Lake approach channel from deep water to a point opposite the outer end of east breakwater; entrance channel from its junction with the approach channel to its junction with the River Channel; River channel and turning basin to within 1,500 feet of the Penn Central Railroad Bridge. Controlling Depths: Lake approach and entrance channel, 27.5 feet; river channel, 27 feet; turning basin, 21 feet. Project Depths: Lake approach and entrance channels, 29 feet; river channel to Slip No. 1, 28 feet; from Slip No. 1 through eastern portion of the turning basin, 28 feet; turning basin, 22 feet. Domestic
Sheet111 Huron, OH- Section Included: Lake approach channel from deep water to a point opposite the outer end of east breakwater; entrance channel from its junction with the approach channel to its junction with the River Channel; River channel and turning basin to within 1,500 feet of the Penn Central Railroad Bridge. Controlling Depths: Lake approach and entrance channel, 27.5 feet; river channel, 27 feet; turning basin, 21 feet. Project Depths: Lake approach and entrance channels, 29 feet; river channel to Slip No. 1, 28 feet; from Slip No. 1 through eastern portion of the turning basin, 28 feet; turning basin, 22 feet. Foreign
Sheet112 Indiana Harbor, IN- Section Included: Approach channel, outer harbor and canal entrance channel to the first E. J. & E. R. R. Bridge: Indiana Harbor Canal, including the Calumet River Branch to Columbus Drive Bridge and the Lake George Branch to 0.2 miles past Indianapolis Blvd. Project Depth: 29 feet in approach channel, 28 feet in harbor basin, 27 feet in canal entrance channel, and 22 feet in remainder of canal to 0.2 miles past Indianapolis Blvd. on Lake George Branch and Columbus Drive on Calumet River Branch. All Traffic Types (Domestic & Foreign)
Sheet113 Indiana Harbor, IN- Section Included: Approach channel, outer harbor and canal entrance channel to the first E. J. & E. R. R. Bridge: Indiana Harbor Canal, including the Calumet River Branch to Columbus Drive Bridge and the Lake George Branch to 0.2 miles past Indianapolis Blvd. Project Depth: 29 feet in approach channel, 28 feet in harbor basin, 27 feet in canal entrance channel, and 22 feet in remainder of canal to 0.2 miles past Indianapolis Blvd. on Lake George Branch and Columbus Drive on Calumet River Branch. Domestic
Sheet114 Indiana Harbor, IN- Section Included: Approach channel, outer harbor and canal entrance channel to the first E. J. & E. R. R. Bridge: Indiana Harbor Canal, including the Calumet River Branch to Columbus Drive Bridge and the Lake George Branch to 0.2 miles past Indianapolis Blvd. Project Depth: 29 feet in approach channel, 28 feet in harbor basin, 27 feet in canal entrance channel, and 22 feet in remainder of canal to 0.2 miles past Indianapolis Blvd. on Lake George Branch and Columbus Drive on Calumet River Branch. Foreign
Sheet115 Kelleys Island, OH- Section Included: Entire area of Kelleys Island, Ohio. Controlling Depth: Unimproved, natural depths unknown. Project depth: Approach channel, 12 feet; Entrance channel, 10 feet; and remainder of channel, 8 to 10 feet. All Traffic Types (Domestic & Foreign)
Sheet116 Kelleys Island, OH- Section Included: Entire area of Kelleys Island, Ohio. Controlling Depth: Unimproved, natural depths unknown. Project depth: Approach channel, 12 feet; Entrance channel, 10 feet; and remainder of channel, 8 to 10 feet. Domestic
Sheet117 Kelleys Island, OH- Section Included: Entire area of Kelleys Island, Ohio. Controlling Depth: Unimproved, natural depths unknown. Project depth: Approach channel, 12 feet; Entrance channel, 10 feet; and remainder of channel, 8 to 10 feet. Foreign
Sheet118 Kenosha, WI- All Traffic Types (Domestic & Foreign)
Sheet119 Kenosha, WI- Domestic
Sheet120 Kenosha, WI- Foreign
Sheet121 Kewaunee, WI- Section Included: Outer harbor, inner basin and north basin. Controlling and project depths: 20 feet. All Traffic Types (Domestic & Foreign)
Sheet122 Kewaunee, WI- Section Included: Outer harbor, inner basin and north basin. Controlling and project depths: 20 feet. Domestic
Sheet123 Kewaunee, WI- Section Included: Outer harbor, inner basin and north basin. Controlling and project depths: 20 feet. Foreign
Sheet124 La Pointe, WI- All Traffic Types (Domestic & Foreign)
Sheet125 La Pointe, WI- Domestic
Sheet126 La Pointe, WI- Foreign
Sheet127 Lake Calumet, IL- Section Included: Entrance channel from the Calumet River to a harbor area at south end of lake with a channel extending northward for a distance of 3,000 feet and a width of 1,000 feet. Project Depth: 27 feet. All Traffic Types (Domestic & Foreign)
Sheet128 Lake Calumet, IL- Section Included: Entrance channel from the Calumet River to a harbor area at south end of lake with a channel extending northward for a distance of 3,000 feet and a width of 1,000 feet. Project Depth: 27 feet. Domestic
Sheet129 Lake Calumet, IL- Section Included: Entrance channel from the Calumet River to a harbor area at south end of lake with a channel extending northward for a distance of 3,000 feet and a width of 1,000 feet. Project Depth: 27 feet. Foreign
Sheet130 Lorain, OH- Section Included: Outer Harbor and Black River from mouth to and including United States Steel Corp., National Tube Division dock, 3 miles. ControllingDepths: Lake Approach channel, 27.0 feet; A channel 800 feet wide through the Outer Harbor, 27 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 25 feet; remainder of River Channel 24 feet except turning basinjust downstream of the 21st Street Bridge which is 12 to 19 feet and the returning Basin opposit e the U. S. Steel Corp., National Tube Division which is 12 to 20 feet. Project Depths: Lake Approach Channel, 29 feet; a channel 800 feet wide through the Outer Harbor, 28 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 28 feet; remainder of River Channel, 27 feet; except turning basin downstream of 21st Street Bridge, 20 feet and turning basin opposite U. S. Steel Corp., National Tube Division Dock, 21 feet. All Traffic Types (Domestic & Foreign)
Sheet131 Lorain, OH- Section Included: Outer Harbor and Black River from mouth to and including United States Steel Corp., National Tube Division dock, 3 miles. ControllingDepths: Lake Approach channel, 27.0 feet; A channel 800 feet wide through the Outer Harbor, 27 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 25 feet; remainder of River Channel 24 feet except turning basinjust downstream of the 21st Street Bridge which is 12 to 19 feet and the returning Basin opposit e the U. S. Steel Corp., National Tube Division which is 12 to 20 feet. Project Depths: Lake Approach Channel, 29 feet; a channel 800 feet wide through the Outer Harbor, 28 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 28 feet; remainder of River Channel, 27 feet; except turning basin downstream of 21st Street Bridge, 20 feet and turning basin opposite U. S. Steel Corp., National Tube Division Dock, 21 feet. Domestic
Sheet132 Lorain, OH- Section Included: Outer Harbor and Black River from mouth to and including United States Steel Corp., National Tube Division dock, 3 miles. ControllingDepths: Lake Approach channel, 27.0 feet; A channel 800 feet wide through the Outer Harbor, 27 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 25 feet; remainder of River Channel 24 feet except turning basinjust downstream of the 21st Street Bridge which is 12 to 19 feet and the returning Basin opposit e the U. S. Steel Corp., National Tube Division which is 12 to 20 feet. Project Depths: Lake Approach Channel, 29 feet; a channel 800 feet wide through the Outer Harbor, 28 feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel, 28 feet; remainder of River Channel, 27 feet; except turning basin downstream of 21st Street Bridge, 20 feet and turning basin opposite U. S. Steel Corp., National Tube Division Dock, 21 feet. Foreign
Sheet133 Ludington, MI- Section Included: Entrance channel and entire area of Pere Marquette Lake. Controlling Depths: 26 feet in the outer entrance bar and 27 feet in the channel to Pere Marquette Lake. Project Depths: Outer entrance channel, 30 feet; inner entrance channel, 29.5 feet; channel to Pere Marquette Lake, 29 feet; north and south mooring basins, 18 feet. Navigation season: April 2 to December 31. All Traffic Types (Domestic & Foreign)
Sheet134 Ludington, MI- Section Included: Entrance channel and entire area of Pere Marquette Lake. Controlling Depths: 26 feet in the outer entrance bar and 27 feet in the channel to Pere Marquette Lake. Project Depths: Outer entrance channel, 30 feet; inner entrance channel, 29.5 feet; channel to Pere Marquette Lake, 29 feet; north and south mooring basins, 18 feet. Navigation season: April 2 to December 31. Domestic
Sheet135 Ludington, MI- Section Included: Entrance channel and entire area of Pere Marquette Lake. Controlling Depths: 26 feet in the outer entrance bar and 27 feet in the channel to Pere Marquette Lake. Project Depths: Outer entrance channel, 30 feet; inner entrance channel, 29.5 feet; channel to Pere Marquette Lake, 29 feet; north and south mooring basins, 18 feet. Navigation season: April 2 to December 31. Foreign
Sheet136 Mackinac, MI- All Traffic Types (Domestic & Foreign)
Sheet137 Mackinac, MI- Domestic
Sheet138 Mackinac, MI- Foreign
Sheet139 Mackinaw City, MI- All Traffic Types (Domestic & Foreign)
Sheet140 Mackinaw City, MI- Domestic
Sheet141 Mackinaw City, MI- Foreign
Sheet142 Manistee, MI- Section Included: Entrance channel and entire area of Manistee Lake, including Filer City. Controlling Depths: 24 feet over the entrance bar, through the outer basin and in the channel between the piers; thence 23 feet in the river channel, narrowing to a minimum width of about 100 to 140 feet to Manistee Lake. Project Depths: 25 feet in the outer basin and 23 feet in the river to Manistee Lake. Navigation season: March 30 to December 31. All Traffic Types (Domestic & Foreign)
Sheet143 Manistee, MI- Section Included: Entrance channel and entire area of Manistee Lake, including Filer City. Controlling Depths: 24 feet over the entrance bar, through the outer basin and in the channel between the piers; thence 23 feet in the river channel, narrowing to a minimum width of about 100 to 140 feet to Manistee Lake. Project Depths: 25 feet in the outer basin and 23 feet in the river to Manistee Lake. Navigation season: March 30 to December 31. Domestic
Sheet144 Manistee, MI- Section Included: Entrance channel and entire area of Manistee Lake, including Filer City. Controlling Depths: 24 feet over the entrance bar, through the outer basin and in the channel between the piers; thence 23 feet in the river channel, narrowing to a minimum width of about 100 to 140 feet to Manistee Lake. Project Depths: 25 feet in the outer basin and 23 feet in the river to Manistee Lake. Navigation season: March 30 to December 31. Foreign
Sheet145 Manistique, MI- All Traffic Types (Domestic & Foreign)
Sheet146 Manistique, MI- Domestic
Sheet147 Manistique, MI- Foreign
Sheet148 Manitowoc, WI- Section Included: Outer harbor and lower 2 miles of river. Controlling and project depths: 21 feet in the Lake Approach Channel, the outer harbor, and in the river channel to the Third Railway Bridge. All Traffic Types (Domestic & Foreign)
Sheet149 Manitowoc, WI- Section Included: Outer harbor and lower 2 miles of river. Controlling and project depths: 21 feet in the Lake Approach Channel, the outer harbor, and in the river channel to the Third Railway Bridge. Domestic
Sheet150 Manitowoc, WI- Section Included: Outer harbor and lower 2 miles of river. Controlling and project depths: 21 feet in the Lake Approach Channel, the outer harbor, and in the river channel to the Third Railway Bridge. Foreign
Sheet151 Marblehead, OH- All Traffic Types (Domestic & Foreign)
Sheet152 Marblehead, OH- Domestic
Sheet153 Marblehead, OH- Foreign
Sheet154 Marine City, MI- All Traffic Types (Domestic & Foreign)
Sheet155 Marine City, MI- Domestic
Sheet156 Marine City, MI- Foreign
Sheet157 Marquette, MI- Section Included: Entire harbor. Controlling Depth: 26 feet. Project Depth: 27 feet. Navigation Season: May 14 to November 22. All Traffic Types (Domestic & Foreign)
Sheet158 Marquette, MI- Section Included: Entire harbor. Controlling Depth: 26 feet. Project Depth: 27 feet. Navigation Season: May 14 to November 22. Domestic
Sheet159 Marquette, MI- Section Included: Entire harbor. Controlling Depth: 26 feet. Project Depth: 27 feet. Navigation Season: May 14 to November 22. Foreign
Sheet160 Marysville, MI- Section Included: West bank of St. Clair River at Marysville, MI. Controlling Depth: 27.4 feet. Project Depth: at low-water datum; 27.4 feet to and from Lake Huron; 27.1 feet downbound to Lake St. Clair. All Traffic Types (Domestic & Foreign)
Sheet161 Marysville, MI- Section Included: West bank of St. Clair River at Marysville, MI. Controlling Depth: 27.4 feet. Project Depth: at low-water datum; 27.4 feet to and from Lake Huron; 27.1 feet downbound to Lake St. Clair. Domestic
Sheet162 Marysville, MI- Section Included: West bank of St. Clair River at Marysville, MI. Controlling Depth: 27.4 feet. Project Depth: at low-water datum; 27.4 feet to and from Lake Huron; 27.1 feet downbound to Lake St. Clair. Foreign
Sheet163 Menominee, MI and WI- Section Included: Entrance channel and lower 2.0 miles of Menominee River. Controlling and project depths: 20 feet controlling depth, 23 feet project depth in the Approach Channel; 18 feet controlling depth, 21 feet project depth in the entrance and river channels, 19 feet in the river adjacent to the Marinette Marine Corp., 12 feet to the end of the project, and 18.5 feet controlling depth, 21 feet project depth in the Turning Basin. All Traffic Types (Domestic & Foreign)
Sheet164 Menominee, MI and WI- Section Included: Entrance channel and lower 2.0 miles of Menominee River. Controlling and project depths: 20 feet controlling depth, 23 feet project depth in the Approach Channel; 18 feet controlling depth, 21 feet project depth in the entrance and river channels, 19 feet in the river adjacent to the Marinette Marine Corp., 12 feet to the end of the project, and 18.5 feet controlling depth, 21 feet project depth in the Turning Basin. Domestic
Sheet165 Menominee, MI and WI- Section Included: Entrance channel and lower 2.0 miles of Menominee River. Controlling and project depths: 20 feet controlling depth, 23 feet project depth in the Approach Channel; 18 feet controlling depth, 21 feet project depth in the entrance and river channels, 19 feet in the river adjacent to the Marinette Marine Corp., 12 feet to the end of the project, and 18.5 feet controlling depth, 21 feet project depth in the Turning Basin. Foreign
Sheet166 Milwaukee, WI- Section Included: Lake Approach Channel, outer harbor, Milwaukee River to Buffalo Street, lower 2 miles of Menomonee River, lower 2 miles of Kinnickinnic River and South Menomonee and Burnham Canals. Controlling and project depths: 30 feet in Lake Approach Channel, 28 feet in the entrance channel and the south outer harbor, 21 feet in the north outer harbor, 27 feet in the Kinnickinnic River to the Chicago and North Western Railway Bridge at mile 1.0, thence 21 feet to South K innickinnic Avenue Bridge; 27 feet in Milwaukee River to the Chicago and North Western Railway Bridge at mile 0.21, thence 21 feet to East Buffalo Street Bridge; 21 feet in Menomonee River and South Menomonee and Burham Canals. All Traffic Types (Domestic & Foreign)
Sheet167 Milwaukee, WI- Section Included: Lake Approach Channel, outer harbor, Milwaukee River to Buffalo Street, lower 2 miles of Menomonee River, lower 2 miles of Kinnickinnic River and South Menomonee and Burnham Canals. Controlling and project depths: 30 feet in Lake Approach Channel, 28 feet in the entrance channel and the south outer harbor, 21 feet in the north outer harbor, 27 feet in the Kinnickinnic River to the Chicago and North Western Railway Bridge at mile 1.0, thence 21 feet to South K innickinnic Avenue Bridge; 27 feet in Milwaukee River to the Chicago and North Western Railway Bridge at mile 0.21, thence 21 feet to East Buffalo Street Bridge; 21 feet in Menomonee River and South Menomonee and Burham Canals. Domestic
Sheet168 Milwaukee, WI- Section Included: Lake Approach Channel, outer harbor, Milwaukee River to Buffalo Street, lower 2 miles of Menomonee River, lower 2 miles of Kinnickinnic River and South Menomonee and Burnham Canals. Controlling and project depths: 30 feet in Lake Approach Channel, 28 feet in the entrance channel and the south outer harbor, 21 feet in the north outer harbor, 27 feet in the Kinnickinnic River to the Chicago and North Western Railway Bridge at mile 1.0, thence 21 feet to South K innickinnic Avenue Bridge; 27 feet in Milwaukee River to the Chicago and North Western Railway Bridge at mile 0.21, thence 21 feet to East Buffalo Street Bridge; 21 feet in Menomonee River and South Menomonee and Burham Canals. Foreign
Sheet169 Monroe, MI- Section Included: Channel in Lake Erie and 16,000 feet above Raisin River.Controlling depth: 20 feet to turning basin over a center width of 150 feet; 16.5 feet in turning basin except near the shore; 5.5 feet in 9 foot channel. Project Depth: 21 feet to the turning basin; 18 feet in the turning basin; 9 feet to lower docks at Monroe. Navigation season: Approximately 20 April to 14 December. All Traffic Types (Domestic & Foreign)
Sheet170 Monroe, MI- Section Included: Channel in Lake Erie and 16,000 feet above Raisin River.Controlling depth: 20 feet to turning basin over a center width of 150 feet; 16.5 feet in turning basin except near the shore; 5.5 feet in 9 foot channel. Project Depth: 21 feet to the turning basin; 18 feet in the turning basin; 9 feet to lower docks at Monroe. Navigation season: Approximately 20 April to 14 December. Domestic
Sheet171 Monroe, MI- Section Included: Channel in Lake Erie and 16,000 feet above Raisin River.Controlling depth: 20 feet to turning basin over a center width of 150 feet; 16.5 feet in turning basin except near the shore; 5.5 feet in 9 foot channel. Project Depth: 21 feet to the turning basin; 18 feet in the turning basin; 9 feet to lower docks at Monroe. Navigation season: Approximately 20 April to 14 December. Foreign
Sheet172 Muskegon, MI- Section Included: Entrance channel and entire area of Muskegon Lake. Controlling Depths: 29.0 feet through the outer portion of project and 27 feet in channel to Muskegon Lake. Project Depth: Varying from 29.0 feet at harbor entrance to 28 feet between breakwaters and 27 feet in inner channel. Navigation season: April 7 to December 31. All Traffic Types (Domestic & Foreign)
Sheet173 Muskegon, MI- Section Included: Entrance channel and entire area of Muskegon Lake. Controlling Depths: 29.0 feet through the outer portion of project and 27 feet in channel to Muskegon Lake. Project Depth: Varying from 29.0 feet at harbor entrance to 28 feet between breakwaters and 27 feet in inner channel. Navigation season: April 7 to December 31. Domestic
Sheet174 Muskegon, MI- Section Included: Entrance channel and entire area of Muskegon Lake. Controlling Depths: 29.0 feet through the outer portion of project and 27 feet in channel to Muskegon Lake. Project Depth: Varying from 29.0 feet at harbor entrance to 28 feet between breakwaters and 27 feet in inner channel. Navigation season: April 7 to December 31. Foreign
Sheet175 Niagara River, NY- Section Included: Black Rock Channel north of the Black Rock Lock and Niagara River to and including American Oil Co. dock, 0.5 mile south of the Tonawanda city line, the northern limit of the Niagara River section of the Port of Buffalo. Controlling and Project Depths: 21 feet. All Traffic Types (Domestic & Foreign)
Sheet176 Niagara River, NY- Section Included: Black Rock Channel north of the Black Rock Lock and Niagara River to and including American Oil Co. dock, 0.5 mile south of the Tonawanda city line, the northern limit of the Niagara River section of the Port of Buffalo. Controlling and Project Depths: 21 feet. Domestic
Sheet177 Niagara River, NY- Section Included: Black Rock Channel north of the Black Rock Lock and Niagara River to and including American Oil Co. dock, 0.5 mile south of the Tonawanda city line, the northern limit of the Niagara River section of the Port of Buffalo. Controlling and Project Depths: 21 feet. Foreign
Sheet178 Oconto, WI- All Traffic Types (Domestic & Foreign)
Sheet179 Oconto, WI- Domestic
Sheet180 Oconto, WI- Foreign
Sheet181 Ogdensburg, NY- Section Included: St. Lawrence River Frontage from vicinity of Lake Street Bridge to inner end of Ogdensburg Bridge and Port Authority Dock near Barre Street; upper entrance, city front and lower east entrance channels and lower basin. Controlling Depth: Upper entrance, city front and lower entrance channels, 19 feet; lower basin, 21 feet. All Traffic Types (Domestic & Foreign)
Sheet182 Ogdensburg, NY- Section Included: St. Lawrence River Frontage from vicinity of Lake Street Bridge to inner end of Ogdensburg Bridge and Port Authority Dock near Barre Street; upper entrance, city front and lower east entrance channels and lower basin. Controlling Depth: Upper entrance, city front and lower entrance channels, 19 feet; lower basin, 21 feet. Domestic
Sheet183 Ogdensburg, NY- Section Included: St. Lawrence River Frontage from vicinity of Lake Street Bridge to inner end of Ogdensburg Bridge and Port Authority Dock near Barre Street; upper entrance, city front and lower east entrance channels and lower basin. Controlling Depth: Upper entrance, city front and lower entrance channels, 19 feet; lower basin, 21 feet. Foreign
Sheet184 Ontonagon, MI- Section Included: Mouth of Ontonagon River, MI. Controlling Depth: 19 feet in lake approach, 19 feet between entrance piers, and 15 feet in Harbor Basin. Project Depth: 19 feet in lake approach and 19 feet between entrance piers, and 15 feet in inner basin. All Traffic Types (Domestic & Foreign)
Sheet185 Ontonagon, MI- Section Included: Mouth of Ontonagon River, MI. Controlling Depth: 19 feet in lake approach, 19 feet between entrance piers, and 15 feet in Harbor Basin. Project Depth: 19 feet in lake approach and 19 feet between entrance piers, and 15 feet in inner basin. Domestic
Sheet186 Ontonagon, MI- Section Included: Mouth of Ontonagon River, MI. Controlling Depth: 19 feet in lake approach, 19 feet between entrance piers, and 15 feet in Harbor Basin. Project Depth: 19 feet in lake approach and 19 feet between entrance piers, and 15 feet in inner basin. Foreign
Sheet187 Oswego, NY- Section Included: Outer Harbor and Oswego River from mouth to Seneca Street. Controlling Depths: Lake approach channel, 27 feet; channel through outer harbor, 24 feet; east and west side of outer harbor, 21 feet; Oswego River channel, 24 feet. Project Depths: Lake approach channel, 27 feet; channel through outer harbor, 25 feet; lower 1,600 feet of Oswego River channel, 24 feet; remainder of Oswego River channel and Oswego Harbor, 21 feet. All Traffic Types (Domestic & Foreign)
Sheet188 Oswego, NY- Section Included: Outer Harbor and Oswego River from mouth to Seneca Street. Controlling Depths: Lake approach channel, 27 feet; channel through outer harbor, 24 feet; east and west side of outer harbor, 21 feet; Oswego River channel, 24 feet. Project Depths: Lake approach channel, 27 feet; channel through outer harbor, 25 feet; lower 1,600 feet of Oswego River channel, 24 feet; remainder of Oswego River channel and Oswego Harbor, 21 feet. Domestic
Sheet189 Oswego, NY- Section Included: Outer Harbor and Oswego River from mouth to Seneca Street. Controlling Depths: Lake approach channel, 27 feet; channel through outer harbor, 24 feet; east and west side of outer harbor, 21 feet; Oswego River channel, 24 feet. Project Depths: Lake approach channel, 27 feet; channel through outer harbor, 25 feet; lower 1,600 feet of Oswego River channel, 24 feet; remainder of Oswego River channel and Oswego Harbor, 21 feet. Foreign
Sheet190 Port Clinton, OH- All Traffic Types (Domestic & Foreign)
Sheet191 Port Clinton, OH- Domestic
Sheet192 Port Clinton, OH- Foreign
Sheet193 Port Dolomite, MI- All Traffic Types (Domestic & Foreign)
Sheet194 Port Dolomite, MI- Domestic
Sheet195 Port Dolomite, MI- Foreign
Sheet196 Port Gypsum, MI- All Traffic Types (Domestic & Foreign)
Sheet197 Port Gypsum, MI- Domestic
Sheet198 Port Gypsum, MI- Foreign
Sheet199 Port Huron, MI- Section Included: West bank of the St. Clair River from mouth of river to Grand Trunk Western Railroad Bridge and both banks of the Black River up to Washington Avenue in Port Huron, Michigan. Controlling Depths: from Lake St. Clair to Stag Island, 27.1 feet. In the Stag Island to Port Huron channel and the foot of Lake Huron channel, 27.3 feet and 30 feet respectively. In the Black River, 17 feet, for a width of 70 feet, from the mouth to 1,700 feet upstream of the Grand  Trunk Western Railroad Bridge, and 15 feet for a width of 50 feet through the settling basin to Washington Avenue. Project Depths: In the St. Clair River, slopes from 30 feet at head to 27.5 feet at Grand Trunk Western Railroad Bridge. In the Black River, 20 feet from the mouth to the upper end of the settling basin, about 2,300 feet upstream from the Grand Trunk Western Railroad Bridge. All Traffic Types (Domestic & Foreign)
Sheet200 Port Huron, MI- Section Included: West bank of the St. Clair River from mouth of river to Grand Trunk Western Railroad Bridge and both banks of the Black River up to Washington Avenue in Port Huron, Michigan. Controlling Depths: from Lake St. Clair to Stag Island, 27.1 feet. In the Stag Island to Port Huron channel and the foot of Lake Huron channel, 27.3 feet and 30 feet respectively. In the Black River, 17 feet, for a width of 70 feet, from the mouth to 1,700 feet upstream of the Grand  Trunk Western Railroad Bridge, and 15 feet for a width of 50 feet through the settling basin to Washington Avenue. Project Depths: In the St. Clair River, slopes from 30 feet at head to 27.5 feet at Grand Trunk Western Railroad Bridge. In the Black River, 20 feet from the mouth to the upper end of the settling basin, about 2,300 feet upstream from the Grand Trunk Western Railroad Bridge. Domestic
Sheet201 Port Huron, MI- Section Included: West bank of the St. Clair River from mouth of river to Grand Trunk Western Railroad Bridge and both banks of the Black River up to Washington Avenue in Port Huron, Michigan. Controlling Depths: from Lake St. Clair to Stag Island, 27.1 feet. In the Stag Island to Port Huron channel and the foot of Lake Huron channel, 27.3 feet and 30 feet respectively. In the Black River, 17 feet, for a width of 70 feet, from the mouth to 1,700 feet upstream of the Grand  Trunk Western Railroad Bridge, and 15 feet for a width of 50 feet through the settling basin to Washington Avenue. Project Depths: In the St. Clair River, slopes from 30 feet at head to 27.5 feet at Grand Trunk Western Railroad Bridge. In the Black River, 20 feet from the mouth to the upper end of the settling basin, about 2,300 feet upstream from the Grand Trunk Western Railroad Bridge. Foreign
Sheet202 Port Inland, MI- All Traffic Types (Domestic & Foreign)
Sheet203 Port Inland, MI- Domestic
Sheet204 Port Inland, MI- Foreign
Sheet205 Port Washington, WI- Section Included: Outer harbor and interior basins. Controlling and project depths: 21 feet in the entrance channel and outer turning basin; 18 feet in inner basins. All Traffic Types (Domestic & Foreign)
Sheet206 Port Washington, WI- Section Included: Outer harbor and interior basins. Controlling and project depths: 21 feet in the entrance channel and outer turning basin; 18 feet in inner basins. Domestic
Sheet207 Port Washington, WI- Section Included: Outer harbor and interior basins. Controlling and project depths: 21 feet in the entrance channel and outer turning basin; 18 feet in inner basins. Foreign
Sheet208 Presque Isle, MI- Section Included: Entire harbor. Controlling and Project Depths: 30 feet in approach and 28 feet in basin. Navigation Season: March 31 to January 21. All Traffic Types (Domestic & Foreign)
Sheet209 Presque Isle, MI- Section Included: Entire harbor. Controlling and Project Depths: 30 feet in approach and 28 feet in basin. Navigation Season: March 31 to January 21. Domestic
Sheet210 Presque Isle, MI- Section Included: Entire harbor. Controlling and Project Depths: 30 feet in approach and 28 feet in basin. Navigation Season: March 31 to January 21. Foreign
Sheet211 Put-In-Bay, OH- All Traffic Types (Domestic & Foreign)
Sheet212 Put-In-Bay, OH- Domestic
Sheet213 Put-In-Bay, OH- Foreign
Sheet214 Racine, WI- All Traffic Types (Domestic & Foreign)
Sheet215 Racine, WI- Domestic
Sheet216 Racine, WI- Foreign
Sheet217 Rochester, NY- Section Included: Genesee River from mouth to and including Genesee Docks,3 miles. Controlling Depth: Approach and entrance channels 19.0 feet; lower turning basin 17.0 feet. remainder of Genesee River 11 feet except for westerlyhalf of upper turning basin which has not been maintained for several years 4 feet; and portion of channel upstream of Rochester Portlandc Cement Dock, 12 feet. project depths: Approach channel, 24 feet; entrance channel between piers to Conrail Rail road Bridge, 23 feet; remainder of Genesee River, 21 feet. All Traffic Types (Domestic & Foreign)
Sheet218 Rochester, NY- Section Included: Genesee River from mouth to and including Genesee Docks,3 miles. Controlling Depth: Approach and entrance channels 19.0 feet; lower turning basin 17.0 feet. remainder of Genesee River 11 feet except for westerlyhalf of upper turning basin which has not been maintained for several years 4 feet; and portion of channel upstream of Rochester Portlandc Cement Dock, 12 feet. project depths: Approach channel, 24 feet; entrance channel between piers to Conrail Rail road Bridge, 23 feet; remainder of Genesee River, 21 feet. Domestic
Sheet219 Rochester, NY- Section Included: Genesee River from mouth to and including Genesee Docks,3 miles. Controlling Depth: Approach and entrance channels 19.0 feet; lower turning basin 17.0 feet. remainder of Genesee River 11 feet except for westerlyhalf of upper turning basin which has not been maintained for several years 4 feet; and portion of channel upstream of Rochester Portlandc Cement Dock, 12 feet. project depths: Approach channel, 24 feet; entrance channel between piers to Conrail Rail road Bridge, 23 feet; remainder of Genesee River, 21 feet. Foreign
Sheet220 Rouge River, MI- Section Included: From the mouth of the Short Cut Canal to the Ford Motor Company. Controlling Depth: 20 feet for a minimum width of 100 feet from the mouth of the short cut to Dix Avenue Bridge, with the exception of some shoal areas, and 20 feet in the turning basin, except near the shore. Project Depth: 21.0 feet from mouth of Short Cut Canal to and including the turning basin in main channel. All Traffic Types (Domestic & Foreign)
Sheet221 Rouge River, MI- Section Included: From the mouth of the Short Cut Canal to the Ford Motor Company. Controlling Depth: 20 feet for a minimum width of 100 feet from the mouth of the short cut to Dix Avenue Bridge, with the exception of some shoal areas, and 20 feet in the turning basin, except near the shore. Project Depth: 21.0 feet from mouth of Short Cut Canal to and including the turning basin in main channel. Domestic
Sheet222 Rouge River, MI- Section Included: From the mouth of the Short Cut Canal to the Ford Motor Company. Controlling Depth: 20 feet for a minimum width of 100 feet from the mouth of the short cut to Dix Avenue Bridge, with the exception of some shoal areas, and 20 feet in the turning basin, except near the shore. Project Depth: 21.0 feet from mouth of Short Cut Canal to and including the turning basin in main channel. Foreign
Sheet223 Sackets Harbor, NY- All Traffic Types (Domestic & Foreign)
Sheet224 Sackets Harbor, NY- Domestic
Sheet225 Sackets Harbor, NY- Foreign
Sheet226 Saginaw River, MI- Section Included: From the mouth of the river up to and including Sagainaw, Michigan. Controlling Depths: 27 feet from the 25 foot contour in Saginaw Bay to 26 feet at the river mouth, 4 feet miscellaneous shoaling along channel limits; thence 24 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw, Michigan; thence 14 feet to the Holland Street Bridge; thence about 7 feet over a width of 100 feet upstream to Green Point (this section not  maintained). Controlling depths in turning basins are: Essexville - 23 feet north side, 22 feet south side; Airport - 21 feet; Carrollton - 19 feet; Sixth Street - 20 feet; basin at 19 mile point - 15 feet. Project Depths: 27 feet from the deep water in Saginaw Bay to the river mouth; thence 26 feet for 0.4 mile; thence 25 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw; thence 16.5 feet to the upstream limits at Green Point. 20 and 25 feet in Essexvil le Turning Basin; 22 feet in the Airport turning basin; 20 feet in the Carrollton Turning Basin; 20 feet in the Sixth Street Turning Basin and 15 feet in the Turning Basin at the 19 mile point. Navigation season: March 24 to December 31. All Traffic Types (Domestic & Foreign) Trips (#)
Sheet227 Saginaw River, MI- Section Included: From the mouth of the river up to and including Sagainaw, Michigan. Controlling Depths: 27 feet from the 25 foot contour in Saginaw Bay to 26 feet at the river mouth, 4 feet miscellaneous shoaling along channel limits; thence 24 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw, Michigan; thence 14 feet to the Holland Street Bridge; thence about 7 feet over a width of 100 feet upstream to Green Point (this section not  maintained). Controlling depths in turning basins are: Essexville - 23 feet north side, 22 feet south side; Airport - 21 feet; Carrollton - 19 feet; Sixth Street - 20 feet; basin at 19 mile point - 15 feet. Project Depths: 27 feet from the deep water in Saginaw Bay to the river mouth; thence 26 feet for 0.4 mile; thence 25 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw; thence 16.5 feet to the upstream limits at Green Point. 20 and 25 feet in Essexvil le Turning Basin; 22 feet in the Airport turning basin; 20 feet in the Carrollton Turning Basin; 20 feet in the Sixth Street Turning Basin and 15 feet in the Turning Basin at the 19 mile point. Navigation season: March 24 to December 31. Domestic Trips (#)
Sheet228 Saginaw River, MI- Section Included: From the mouth of the river up to and including Sagainaw, Michigan. Controlling Depths: 27 feet from the 25 foot contour in Saginaw Bay to 26 feet at the river mouth, 4 feet miscellaneous shoaling along channel limits; thence 24 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw, Michigan; thence 14 feet to the Holland Street Bridge; thence about 7 feet over a width of 100 feet upstream to Green Point (this section not  maintained). Controlling depths in turning basins are: Essexville - 23 feet north side, 22 feet south side; Airport - 21 feet; Carrollton - 19 feet; Sixth Street - 20 feet; basin at 19 mile point - 15 feet. Project Depths: 27 feet from the deep water in Saginaw Bay to the river mouth; thence 26 feet for 0.4 mile; thence 25 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R. Bridge in Saginaw; thence 16.5 feet to the upstream limits at Green Point. 20 and 25 feet in Essexvil le Turning Basin; 22 feet in the Airport turning basin; 20 feet in the Carrollton Turning Basin; 20 feet in the Sixth Street Turning Basin and 15 feet in the Turning Basin at the 19 mile point. Navigation season: March 24 to December 31. Foreign Trips (#)
Sheet229 Sandusky, OH- Section Included: Southeasterly portion of Sandusky Bay to and including passenger docks on Cedar Point. Controlling Depth: Mosely Channel, 26 feet; Bay Channel and Straight Channel from Mosely Channel to junction with Bay Channel, 25.0 feet; turning basin, 24 feet; Dock channel, 21 feet; Straight channel from dock channel to junction with Bay Channel, 21 feet. Project Depths: Mosely Channel, 26 feet; bay channel and Straight Channel from Mosely Channel to junction with Bay  Channel, 25 feet; turning basin, 24 feet; Dock channel, 22 feet; and straight channel from dock channel to junction with Bay Channel, 21 feet. All Traffic Types (Domestic & Foreign)
Sheet230 Sandusky, OH- Section Included: Southeasterly portion of Sandusky Bay to and including passenger docks on Cedar Point. Controlling Depth: Mosely Channel, 26 feet; Bay Channel and Straight Channel from Mosely Channel to junction with Bay Channel, 25.0 feet; turning basin, 24 feet; Dock channel, 21 feet; Straight channel from dock channel to junction with Bay Channel, 21 feet. Project Depths: Mosely Channel, 26 feet; bay channel and Straight Channel from Mosely Channel to junction with Bay  Channel, 25 feet; turning basin, 24 feet; Dock channel, 22 feet; and straight channel from dock channel to junction with Bay Channel, 21 feet. Domestic
Sheet231 Sandusky, OH- Section Included: Southeasterly portion of Sandusky Bay to and including passenger docks on Cedar Point. Controlling Depth: Mosely Channel, 26 feet; Bay Channel and Straight Channel from Mosely Channel to junction with Bay Channel, 25.0 feet; turning basin, 24 feet; Dock channel, 21 feet; Straight channel from dock channel to junction with Bay Channel, 21 feet. Project Depths: Mosely Channel, 26 feet; bay channel and Straight Channel from Mosely Channel to junction with Bay  Channel, 25 feet; turning basin, 24 feet; Dock channel, 22 feet; and straight channel from dock channel to junction with Bay Channel, 21 feet. Foreign
Sheet232 Sault Ste Marie, MI- All Traffic Types (Domestic & Foreign)
Sheet233 Sault Ste Marie, MI- Domestic
Sheet234 Sault Ste Marie, MI- Foreign
Sheet235 Sheboygan, WI- Section Included: Outer harbor and lower 1.0 + miles of river. Controlling and project depths: 25 feet in entrance channel; 20-25 feet in the Turning Basin; 21 feet in the river channel to Maryland Avenue; 15 feet to Jefferson Avenue. Navigation season: 9 April to 30 December. All Traffic Types (Domestic & Foreign)
Sheet236 Sheboygan, WI- Section Included: Outer harbor and lower 1.0 + miles of river. Controlling and project depths: 25 feet in entrance channel; 20-25 feet in the Turning Basin; 21 feet in the river channel to Maryland Avenue; 15 feet to Jefferson Avenue. Navigation season: 9 April to 30 December. Domestic
Sheet237 Sheboygan, WI- Section Included: Outer harbor and lower 1.0 + miles of river. Controlling and project depths: 25 feet in entrance channel; 20-25 feet in the Turning Basin; 21 feet in the river channel to Maryland Avenue; 15 feet to Jefferson Avenue. Navigation season: 9 April to 30 December. Foreign
Sheet238 Silver Bay, MN- All Traffic Types (Domestic & Foreign)
Sheet239 Silver Bay, MN- Domestic
Sheet240 Silver Bay, MN- Foreign
Sheet241 South Haven, MI- All Traffic Types (Domestic & Foreign)
Sheet242 South Haven, MI- Domestic
Sheet243 South Haven, MI- Foreign
Sheet244 St. Clair, MI- Section Included: West bank of St. Clair River at St. Clair, MI Controlling Depth: 27.3 feet. Project Depth: 27.3 feet. All Traffic Types (Domestic & Foreign)
Sheet245 St. Clair, MI- Section Included: West bank of St. Clair River at St. Clair, MI Controlling Depth: 27.3 feet. Project Depth: 27.3 feet. Domestic
Sheet246 St. Clair, MI- Section Included: West bank of St. Clair River at St. Clair, MI Controlling Depth: 27.3 feet. Project Depth: 27.3 feet. Foreign
Sheet247 St. James, MI- All Traffic Types (Domestic & Foreign)
Sheet248 St. James, MI- Domestic
Sheet249 St. James, MI- Foreign
Sheet250 St. Joseph, MI- Section Included: Entrance channel and lower portion of St. Joseph River to and including Benton Harbor Canal. Controlling Depth: 24 feet at entrance; 21 feet between entrance piers and in the river to the mouth of the Paw Paw River; with miscellaneous of shoaling along the channel limits; 17 feet in the Turning Basin; and 16 feet at Benton Harbor Canal. Project Depths: 24 feet at entrance, and 21 feet in channel and river to the mouth of the Paw Paw River; 18 feet in turn ing basins and the Benton Harbor Canal. Navigation season: March 7 to December 31. All Traffic Types (Domestic & Foreign)
Sheet251 St. Joseph, MI- Section Included: Entrance channel and lower portion of St. Joseph River to and including Benton Harbor Canal. Controlling Depth: 24 feet at entrance; 21 feet between entrance piers and in the river to the mouth of the Paw Paw River; with miscellaneous of shoaling along the channel limits; 17 feet in the Turning Basin; and 16 feet at Benton Harbor Canal. Project Depths: 24 feet at entrance, and 21 feet in channel and river to the mouth of the Paw Paw River; 18 feet in turn ing basins and the Benton Harbor Canal. Navigation season: March 7 to December 31. Domestic
Sheet252 St. Joseph, MI- Section Included: Entrance channel and lower portion of St. Joseph River to and including Benton Harbor Canal. Controlling Depth: 24 feet at entrance; 21 feet between entrance piers and in the river to the mouth of the Paw Paw River; with miscellaneous of shoaling along the channel limits; 17 feet in the Turning Basin; and 16 feet at Benton Harbor Canal. Project Depths: 24 feet at entrance, and 21 feet in channel and river to the mouth of the Paw Paw River; 18 feet in turn ing basins and the Benton Harbor Canal. Navigation season: March 7 to December 31. Foreign
Sheet253 Stoneport, MI- All Traffic Types (Domestic & Foreign)
Sheet254 Stoneport, MI- Domestic
Sheet255 Stoneport, MI- Foreign
Sheet256 Sturgeon Bay, WI- Section Included: Entire canal and connecting waters between Lake Michigan and Green Bay, through the city of Sturgeon Bay, Wis. controlling and project depths: 23 feet in Lake Michigan entrance to canal, 22 feet in revetted canal and in channel through Sturgeon Bay and 20 feet in Turning Basin. All Traffic Types (Domestic & Foreign)
Sheet257 Sturgeon Bay, WI- Section Included: Entire canal and connecting waters between Lake Michigan and Green Bay, through the city of Sturgeon Bay, Wis. controlling and project depths: 23 feet in Lake Michigan entrance to canal, 22 feet in revetted canal and in channel through Sturgeon Bay and 20 feet in Turning Basin. Domestic
Sheet258 Sturgeon Bay, WI- Section Included: Entire canal and connecting waters between Lake Michigan and Green Bay, through the city of Sturgeon Bay, Wis. controlling and project depths: 23 feet in Lake Michigan entrance to canal, 22 feet in revetted canal and in channel through Sturgeon Bay and 20 feet in Turning Basin. Foreign
Sheet259 Taconite, MN- All Traffic Types (Domestic & Foreign)
Sheet260 Taconite, MN- Domestic
Sheet261 Taconite, MN- Foreign
Sheet262 Toledo, OH- Section Included: Channel in Lake Erie and 7 miles in lower Maumee River. Controlling Depths: 28 feet in the Bay Channel; 27 feet in The River Channel to the turning basin opposite the Mid-States Terminals, Inc. dock; thence 14 feet to the turning basin at the upper project limits with 13 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in the turning basin at mile 6.5, project depths: 28 feet in bay and 27 feet in the river channel to the turning b asin opposite the Mid-States Terminals, Inc. dock; thence 25 feet to the turning basin at upstream limits of the project with 18 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in turning basin at mile 6.5. Navigation season: Approximately March 1 to December 31. All Traffic Types (Domestic & Foreign) Trips (#)
Sheet263 Toledo, OH- Section Included: Channel in Lake Erie and 7 miles in lower Maumee River. Controlling Depths: 28 feet in the Bay Channel; 27 feet in The River Channel to the turning basin opposite the Mid-States Terminals, Inc. dock; thence 14 feet to the turning basin at the upper project limits with 13 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in the turning basin at mile 6.5, project depths: 28 feet in bay and 27 feet in the river channel to the turning b asin opposite the Mid-States Terminals, Inc. dock; thence 25 feet to the turning basin at upstream limits of the project with 18 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in turning basin at mile 6.5. Navigation season: Approximately March 1 to December 31. Domestic Trips (#)
Sheet264 Toledo, OH- Section Included: Channel in Lake Erie and 7 miles in lower Maumee River. Controlling Depths: 28 feet in the Bay Channel; 27 feet in The River Channel to the turning basin opposite the Mid-States Terminals, Inc. dock; thence 14 feet to the turning basin at the upper project limits with 13 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in the turning basin at mile 6.5, project depths: 28 feet in bay and 27 feet in the river channel to the turning b asin opposite the Mid-States Terminals, Inc. dock; thence 25 feet to the turning basin at upstream limits of the project with 18 feet in the turning basin; 20 feet in the turning basin at mile 3 and 27 feet in turning basin at mile 6.5. Navigation season: Approximately March 1 to December 31. Foreign Trips (#)
Sheet265 Traverse City, MI- Section Included: City of Traverse City and the Bay Shore to and including the existing federal project located at Greilickville Hbr., Michigan, about 1.25 miles north of the city limits. Controlling Depth: 14 and 10 feet at the existing project. Project Depth: 14 feet in basin area and 10 feet in mooring area at the existing project. Navigation season: March 4 to December 31. All Traffic Types (Domestic & Foreign)
Sheet266 Traverse City, MI- Section Included: City of Traverse City and the Bay Shore to and including the existing federal project located at Greilickville Hbr., Michigan, about 1.25 miles north of the city limits. Controlling Depth: 14 and 10 feet at the existing project. Project Depth: 14 feet in basin area and 10 feet in mooring area at the existing project. Navigation season: March 4 to December 31. Domestic
Sheet267 Traverse City, MI- Section Included: City of Traverse City and the Bay Shore to and including the existing federal project located at Greilickville Hbr., Michigan, about 1.25 miles north of the city limits. Controlling Depth: 14 and 10 feet at the existing project. Project Depth: 14 feet in basin area and 10 feet in mooring area at the existing project. Navigation season: March 4 to December 31. Foreign
Sheet268 Trenton, MI- Section Included: U.S. shore of Detroit River from foot of Sibley Road to foot of Parkway Drive. Controlling and Project Depths: 28 feet. All Traffic Types (Domestic & Foreign)
Sheet269 Trenton, MI- Section Included: U.S. shore of Detroit River from foot of Sibley Road to foot of Parkway Drive. Controlling and Project Depths: 28 feet. Domestic
Sheet270 Trenton, MI- Section Included: U.S. shore of Detroit River from foot of Sibley Road to foot of Parkway Drive. Controlling and Project Depths: 28 feet. Foreign
Sheet271 Two Harbors, MN- Section Included: Entire harbor. Controlling Depth: 28 feet except for a 26 foot area along the east project line. Project Depth: 28 feet in inner basin and 30 feet near entrance. All Traffic Types (Domestic & Foreign)
Sheet272 Two Harbors, MN- Section Included: Entire harbor. Controlling Depth: 28 feet except for a 26 foot area along the east project line. Project Depth: 28 feet in inner basin and 30 feet near entrance. Domestic
Sheet273 Two Harbors, MN- Section Included: Entire harbor. Controlling Depth: 28 feet except for a 26 foot area along the east project line. Project Depth: 28 feet in inner basin and 30 feet near entrance. Foreign
Sheet274 Waukegan, IL- Section Included: Artificial harbor basin of about 13.5 acres and entrance channel from Lake Michigan approximately 2,200 feet in length. Project Depth: 22 feet in entrance channel; 18 feet between piers and inner basin; 8 feet in anchorage area of approximately 6 acres. All Traffic Types (Domestic & Foreign)
Sheet275 Waukegan, IL- Section Included: Artificial harbor basin of about 13.5 acres and entrance channel from Lake Michigan approximately 2,200 feet in length. Project Depth: 22 feet in entrance channel; 18 feet between piers and inner basin; 8 feet in anchorage area of approximately 6 acres. Domestic
Sheet276 Waukegan, IL- Section Included: Artificial harbor basin of about 13.5 acres and entrance channel from Lake Michigan approximately 2,200 feet in length. Project Depth: 22 feet in entrance channel; 18 feet between piers and inner basin; 8 feet in anchorage area of approximately 6 acres. Foreign
Sheet277 Wyandotte, MI- Section Included: U.S. shore of Detroit River from Ecorse River to and including the Pennsalt Chemical Corp's property. Controlling Depth: 27 feet. Project Depth: Rock area 28 feet, earth area 27 feet. All Traffic Types (Domestic & Foreign)
Sheet278 Wyandotte, MI- Section Included: U.S. shore of Detroit River from Ecorse River to and including the Pennsalt Chemical Corp's property. Controlling Depth: 27 feet. Project Depth: Rock area 28 feet, earth area 27 feet. Domestic
Sheet279 Wyandotte, MI- Section Included: U.S. shore of Detroit River from Ecorse River to and including the Pennsalt Chemical Corp's property. Controlling Depth: 27 feet. Project Depth: Rock area 28 feet, earth area 27 feet. Foreign