Back to Part-1 Next
Table of Contents
Name & Description Traffic Type
Sheet1 ANACOSTIA RIVER, DC (INCLUDED IN WASHINGTON HARBOR DC)- Section Included: Mouth to Magruder Bridge, 6.6 miles. Controlling Depth: 14.4 feet to 11th Street Bridge, 2.1 miles upstream of mouth; balance of waterway ranges from 6 to 20 feet. Project Depth: 24 feet to Foot of 15th Street S. E. All Traffic Types (Domestic & Foreign)
Sheet2 ANACOSTIA RIVER, DC (INCLUDED IN WASHINGTON HARBOR DC)- Section Included: Mouth to Magruder Bridge, 6.6 miles. Controlling Depth: 14.4 feet to 11th Street Bridge, 2.1 miles upstream of mouth; balance of waterway ranges from 6 to 20 feet. Project Depth: 24 feet to Foot of 15th Street S. E. Domestic
Sheet3 ANACOSTIA RIVER, DC (INCLUDED IN WASHINGTON HARBOR DC)- Section Included: Mouth to Magruder Bridge, 6.6 miles. Controlling Depth: 14.4 feet to 11th Street Bridge, 2.1 miles upstream of mouth; balance of waterway ranges from 6 to 20 feet. Project Depth: 24 feet to Foot of 15th Street S. E. Foreign
Sheet4 ANNAPOLIS HARBOR, MD- All Traffic Types (Domestic & Foreign)
Sheet5 ANNAPOLIS HARBOR, MD- Domestic
Sheet6 ANNAPOLIS HARBOR, MD- Foreign
Sheet7 BALTIMORE HARBOR AND CHANNELS, MD- Section Included: Mouth of Chesapeake Bay to Baltimore, MD. Controlling Depth: Cape Henry to Craighill Entrance 50.0 feet. Craighill Entrance to Ft. McHenry, 45.0 feet; southern approach channels to Chesapeake and Delaware Canal, 35 feet. Branch channel range from 15 to 40.8 feet; anchorages; 2 at 35.0 feet and 1 at 30.2 feet. Project Depth: Cape Henry to Fort McHenry, Baltimore,MD, 42 feet (under construction to 50.0 feet); southern approach channels to Chesapeake and Delaware Canal, 35 feet. Branch Channels range from 15 to 42 feet (under construction to 50.0 feet); anchorages 30 feet and 35 feet. All Traffic Types (Domestic & Foreign)
Sheet8 BALTIMORE HARBOR AND CHANNELS, MD- Section Included: Mouth of Chesapeake Bay to Baltimore, MD. Controlling Depth: Cape Henry to Craighill Entrance 50.0 feet. Craighill Entrance to Ft. McHenry, 45.0 feet; southern approach channels to Chesapeake and Delaware Canal, 35 feet. Branch channel range from 15 to 40.8 feet; anchorages; 2 at 35.0 feet and 1 at 30.2 feet. Project Depth: Cape Henry to Fort McHenry, Baltimore,MD, 42 feet (under construction to 50.0 feet); southern approach channels to Chesapeake and Delaware Canal, 35 feet. Branch Channels range from 15 to 42 feet (under construction to 50.0 feet); anchorages 30 feet and 35 feet. Domestic
Sheet9 BALTIMORE HARBOR AND CHANNELS, MD- Section Included: Mouth of Chesapeake Bay to Baltimore, MD. Controlling Depth: Cape Henry to Craighill Entrance 50.0 feet. Craighill Entrance to Ft. McHenry, 45.0 feet; southern approach channels to Chesapeake and Delaware Canal, 35 feet. Branch channel range from 15 to 40.8 feet; anchorages; 2 at 35.0 feet and 1 at 30.2 feet. Project Depth: Cape Henry to Fort McHenry, Baltimore,MD, 42 feet (under construction to 50.0 feet); southern approach channels to Chesapeake and Delaware Canal, 35 feet. Branch Channels range from 15 to 42 feet (under construction to 50.0 feet); anchorages 30 feet and 35 feet. Foreign
Sheet10 BAR HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet11 BAR HARBOR, ME- Domestic
Sheet12 BAR HARBOR, ME- Foreign
Sheet13 BASS HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet14 BASS HARBOR, ME- Domestic
Sheet15 BASS HARBOR, ME- Foreign
Sheet16 BAY RIDGE AND RED HOOK CHANNELS, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Narrows to Buttermilk Channel. Controlling Depth: 40 feet from Narrows to 69th Street Pier, Brooklyn; balance of waterway ranges from 38 to 37 feet. Project Depth: 40 feet. All at mean low water. Project Lenght: 4 miles. All Traffic Types (Domestic & Foreign)
Sheet17 BAY RIDGE AND RED HOOK CHANNELS, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Narrows to Buttermilk Channel. Controlling Depth: 40 feet from Narrows to 69th Street Pier, Brooklyn; balance of waterway ranges from 38 to 37 feet. Project Depth: 40 feet. All at mean low water. Project Lenght: 4 miles. Domestic
Sheet18 BAY RIDGE AND RED HOOK CHANNELS, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Narrows to Buttermilk Channel. Controlling Depth: 40 feet from Narrows to 69th Street Pier, Brooklyn; balance of waterway ranges from 38 to 37 feet. Project Depth: 40 feet. All at mean low water. Project Lenght: 4 miles. Foreign
Sheet19 BEAUFORT HARBOR, NC- All Traffic Types (Domestic & Foreign)
Sheet20 BEAUFORT HARBOR, NC- Domestic
Sheet21 BEAUFORT HARBOR, NC- Foreign
Sheet22 BELFAST HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet23 BELFAST HARBOR, ME- Domestic
Sheet24 BELFAST HARBOR, ME- Foreign
Sheet25 BELHAVEN HARBOR, NC- All Traffic Types (Domestic & Foreign)
Sheet26 BELHAVEN HARBOR, NC- Domestic
Sheet27 BELHAVEN HARBOR, NC- Foreign
Sheet28 BOOTHBAY HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet29 BOOTHBAY HARBOR, ME- Domestic
Sheet30 BOOTHBAY HARBOR, ME- Foreign
Sheet31 BRANFORD HARBOR, CT- All Traffic Types (Domestic & Foreign)
Sheet32 BRANFORD HARBOR, CT- Domestic
Sheet33 BRANFORD HARBOR, CT- Foreign
Sheet34 BRIDGEPORT HARBOR, CT- Section Included: Main Harbor: From deep water to 800 feet downstream of the Stratford Avenue Bridge. Pequonnock River: From Stratford Avenue Bridge to head of navigation, about 1 mile. Yellow Mill Channel: From a point about 1,800 feet below Stratford Avenue Bridge to the head of navigation, 1 mile. Johnsons River: From Pleasure Beach Bridge to head of navigation, about 1,600 feet. Black Rock Harbor: From about 2000 feet downstream of a Fayerweather Island to t he head of navigation, about 2.5 miles. Maintained Depth: 34 feet to Bridgeport Light, thence 29.8 feet to upstream limit of the 35-foot Main Channel; 11 feet in the Pequonnock River Channel; 11.6 feet in Johnsons River to upstream end of channel; 12.9 feet in Yellow Mill Channel to about 2,000 feet upstream of Stratford Avenue Bridge, thence 5.9 feet to upstream limit. Branch channels range from 3 to 15 feet,15 feet in Black Rock Harbor entrance channel; 15 feet in East Branch; 17 feet in  West Branch. Tidal range to 7 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet35 BRIDGEPORT HARBOR, CT- Section Included: Main Harbor: From deep water to 800 feet downstream of the Stratford Avenue Bridge. Pequonnock River: From Stratford Avenue Bridge to head of navigation, about 1 mile. Yellow Mill Channel: From a point about 1,800 feet below Stratford Avenue Bridge to the head of navigation, 1 mile. Johnsons River: From Pleasure Beach Bridge to head of navigation, about 1,600 feet. Black Rock Harbor: From about 2000 feet downstream of a Fayerweather Island to t he head of navigation, about 2.5 miles. Maintained Depth: 34 feet to Bridgeport Light, thence 29.8 feet to upstream limit of the 35-foot Main Channel; 11 feet in the Pequonnock River Channel; 11.6 feet in Johnsons River to upstream end of channel; 12.9 feet in Yellow Mill Channel to about 2,000 feet upstream of Stratford Avenue Bridge, thence 5.9 feet to upstream limit. Branch channels range from 3 to 15 feet,15 feet in Black Rock Harbor entrance channel; 15 feet in East Branch; 17 feet in  West Branch. Tidal range to 7 feet mean higher high water. Domestic
Sheet36 BRIDGEPORT HARBOR, CT- Section Included: Main Harbor: From deep water to 800 feet downstream of the Stratford Avenue Bridge. Pequonnock River: From Stratford Avenue Bridge to head of navigation, about 1 mile. Yellow Mill Channel: From a point about 1,800 feet below Stratford Avenue Bridge to the head of navigation, 1 mile. Johnsons River: From Pleasure Beach Bridge to head of navigation, about 1,600 feet. Black Rock Harbor: From about 2000 feet downstream of a Fayerweather Island to t he head of navigation, about 2.5 miles. Maintained Depth: 34 feet to Bridgeport Light, thence 29.8 feet to upstream limit of the 35-foot Main Channel; 11 feet in the Pequonnock River Channel; 11.6 feet in Johnsons River to upstream end of channel; 12.9 feet in Yellow Mill Channel to about 2,000 feet upstream of Stratford Avenue Bridge, thence 5.9 feet to upstream limit. Branch channels range from 3 to 15 feet,15 feet in Black Rock Harbor entrance channel; 15 feet in East Branch; 17 feet in  West Branch. Tidal range to 7 feet mean higher high water. Foreign
Sheet37 BRISTOL HARBOR, RI- All Traffic Types (Domestic & Foreign)
Sheet38 BRISTOL HARBOR, RI- Domestic
Sheet39 BRISTOL HARBOR, RI- Foreign
Sheet40 BRONX RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to East 172nd Street. Controlling Depth: 10 feet from East River to Bruckner Boulevard Bridge: Balance of waterway ranges 1.3 to 7.5 feet. Project Depth: 10 feet: All at mean low water: Project Length: 2.6 miles. All Traffic Types (Domestic & Foreign)
Sheet41 BRONX RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to East 172nd Street. Controlling Depth: 10 feet from East River to Bruckner Boulevard Bridge: Balance of waterway ranges 1.3 to 7.5 feet. Project Depth: 10 feet: All at mean low water: Project Length: 2.6 miles. Domestic
Sheet42 BRONX RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to East 172nd Street. Controlling Depth: 10 feet from East River to Bruckner Boulevard Bridge: Balance of waterway ranges 1.3 to 7.5 feet. Project Depth: 10 feet: All at mean low water: Project Length: 2.6 miles. Foreign
Sheet43 BRUNSWICK HARBOR, GA- Section Included: From 32-foot contour in the ocean across the Barthrough St. Simon Sound, Brunswick River, and Turtle River to the upper end of the Allied Chemical Company's Wharf, formerly Atlantic Refining Company Wharf, 20.4 miles; from Brunswick River through East River, to the upper end of the project in Academy Creek, 2.7 miles; from St. Simon Sound through Back River to Mill Creek, the upper end of Back River improvement, 2.9 miles; from Back River through Terry  Creek to the Glynn Canning Company's Wharf, 1.8 miles; a total distance of 27.8 miles. Project Depth: 32 feet over the bar; 30 feet in Brunswick, Turtle, and East Rivers to the Foot of Second Avenue; and 27 feet from Second Avenue to Academy Creek; 24 feet in Academy Creek; 20 feet in Back River, and 10 feet in Terry Creek. Navigation Season: Entire Year. All Traffic Types (Domestic & Foreign)
Sheet44 BRUNSWICK HARBOR, GA- Section Included: From 32-foot contour in the ocean across the Barthrough St. Simon Sound, Brunswick River, and Turtle River to the upper end of the Allied Chemical Company's Wharf, formerly Atlantic Refining Company Wharf, 20.4 miles; from Brunswick River through East River, to the upper end of the project in Academy Creek, 2.7 miles; from St. Simon Sound through Back River to Mill Creek, the upper end of Back River improvement, 2.9 miles; from Back River through Terry  Creek to the Glynn Canning Company's Wharf, 1.8 miles; a total distance of 27.8 miles. Project Depth: 32 feet over the bar; 30 feet in Brunswick, Turtle, and East Rivers to the Foot of Second Avenue; and 27 feet from Second Avenue to Academy Creek; 24 feet in Academy Creek; 20 feet in Back River, and 10 feet in Terry Creek. Navigation Season: Entire Year. Domestic
Sheet45 BRUNSWICK HARBOR, GA- Section Included: From 32-foot contour in the ocean across the Barthrough St. Simon Sound, Brunswick River, and Turtle River to the upper end of the Allied Chemical Company's Wharf, formerly Atlantic Refining Company Wharf, 20.4 miles; from Brunswick River through East River, to the upper end of the project in Academy Creek, 2.7 miles; from St. Simon Sound through Back River to Mill Creek, the upper end of Back River improvement, 2.9 miles; from Back River through Terry  Creek to the Glynn Canning Company's Wharf, 1.8 miles; a total distance of 27.8 miles. Project Depth: 32 feet over the bar; 30 feet in Brunswick, Turtle, and East Rivers to the Foot of Second Avenue; and 27 feet from Second Avenue to Academy Creek; 24 feet in Academy Creek; 20 feet in Back River, and 10 feet in Terry Creek. Navigation Season: Entire Year. Foreign
Sheet46 BUCKSPORT HARBOR, ME (INCLUDED IN PENOBSCOT RIVER, ME)- Section Included: Harbor proper, including western end of the Eastern Channel, opposite the northern end of Verona Island. Controlling Depth: 4.8 feet. Project Depth: 16 feet in middle ground of mean low water. All Traffic Types (Domestic & Foreign)
Sheet47 BUCKSPORT HARBOR, ME (INCLUDED IN PENOBSCOT RIVER, ME)- Section Included: Harbor proper, including western end of the Eastern Channel, opposite the northern end of Verona Island. Controlling Depth: 4.8 feet. Project Depth: 16 feet in middle ground of mean low water. Domestic
Sheet48 BUCKSPORT HARBOR, ME (INCLUDED IN PENOBSCOT RIVER, ME)- Section Included: Harbor proper, including western end of the Eastern Channel, opposite the northern end of Verona Island. Controlling Depth: 4.8 feet. Project Depth: 16 feet in middle ground of mean low water. Foreign
Sheet49 BULLOCKS POINT COVE, RI- All Traffic Types (Domestic & Foreign)
Sheet50 BULLOCKS POINT COVE, RI- Domestic
Sheet51 BULLOCKS POINT COVE, RI- Foreign
Sheet52 BURLINGTON HARBOR, VT- Section Included: Channel to Ferry Pier. Controlling Depth: 10-11 feet low lake level in channel to Ferry Pier. (U. S. Lake Chart 172). Project Depth: No dredging project. Navigation Season: About 7 months of the year. All Traffic Types (Domestic & Foreign)
Sheet53 BURLINGTON HARBOR, VT- Section Included: Channel to Ferry Pier. Controlling Depth: 10-11 feet low lake level in channel to Ferry Pier. (U. S. Lake Chart 172). Project Depth: No dredging project. Navigation Season: About 7 months of the year. Domestic
Sheet54 BURLINGTON HARBOR, VT- Section Included: Channel to Ferry Pier. Controlling Depth: 10-11 feet low lake level in channel to Ferry Pier. (U. S. Lake Chart 172). Project Depth: No dredging project. Navigation Season: About 7 months of the year. Foreign
Sheet55 BUTTERMILK CHANNEL, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Anchorage Channel. Controlling Depth: 35-foot project westerly half of channel, depth at 35 feet; 40-foot project easterly half of channel, depth at 40 feet. Project Depth: 35 feet and 40 feet. All at mean low water. Project Length: 2.3 miles. All Traffic Types (Domestic & Foreign)
Sheet56 BUTTERMILK CHANNEL, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Anchorage Channel. Controlling Depth: 35-foot project westerly half of channel, depth at 35 feet; 40-foot project easterly half of channel, depth at 40 feet. Project Depth: 35 feet and 40 feet. All at mean low water. Project Length: 2.3 miles. Domestic
Sheet57 BUTTERMILK CHANNEL, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Anchorage Channel. Controlling Depth: 35-foot project westerly half of channel, depth at 35 feet; 40-foot project easterly half of channel, depth at 40 feet. Project Depth: 35 feet and 40 feet. All at mean low water. Project Length: 2.3 miles. Foreign
Sheet58 CAMBRIDGE HARBOR, MD- All Traffic Types (Domestic & Foreign)
Sheet59 CAMBRIDGE HARBOR, MD- Domestic
Sheet60 CAMBRIDGE HARBOR, MD- Foreign
Sheet61 CANAVERAL HARBOR, FL- Section Included: Entrance Channel (Atlantic Ocean) to Barrier Beach inner channel and Turning Basins, thence a Barge canal through a lock in the perimeter dike and continuing to the Intracoastal Waterway, Jacksonville to Miami. Controlling Depth: 43 feet in entrance channel cut-1a and cut-1, thence 37 feet in inner channel cut-2 to Barrier Beach, thence 36 feet in inner channel to Civil Turning Basin of 35 feet, continuing along barge canal of 12 feet. Project Depths : 44 feet in the U. S. Navy entrance channel (Atlantic Ocean) to Barrier Beach inner channel intersection Navy's Trident Access channel, thence 43 feet for 0.13 mile, thence 36 feet to Civil Turning Basin of 35 feet and continuing along Barge Canal of 12 feet. Length of Project is about 15.4 miles. The Civil Project depth of entrance channel to Barrier Beach inner channel is 37 feet. All Traffic Types (Domestic & Foreign)
Sheet62 CANAVERAL HARBOR, FL- Section Included: Entrance Channel (Atlantic Ocean) to Barrier Beach inner channel and Turning Basins, thence a Barge canal through a lock in the perimeter dike and continuing to the Intracoastal Waterway, Jacksonville to Miami. Controlling Depth: 43 feet in entrance channel cut-1a and cut-1, thence 37 feet in inner channel cut-2 to Barrier Beach, thence 36 feet in inner channel to Civil Turning Basin of 35 feet, continuing along barge canal of 12 feet. Project Depths : 44 feet in the U. S. Navy entrance channel (Atlantic Ocean) to Barrier Beach inner channel intersection Navy's Trident Access channel, thence 43 feet for 0.13 mile, thence 36 feet to Civil Turning Basin of 35 feet and continuing along Barge Canal of 12 feet. Length of Project is about 15.4 miles. The Civil Project depth of entrance channel to Barrier Beach inner channel is 37 feet. Domestic
Sheet63 CANAVERAL HARBOR, FL- Section Included: Entrance Channel (Atlantic Ocean) to Barrier Beach inner channel and Turning Basins, thence a Barge canal through a lock in the perimeter dike and continuing to the Intracoastal Waterway, Jacksonville to Miami. Controlling Depth: 43 feet in entrance channel cut-1a and cut-1, thence 37 feet in inner channel cut-2 to Barrier Beach, thence 36 feet in inner channel to Civil Turning Basin of 35 feet, continuing along barge canal of 12 feet. Project Depths : 44 feet in the U. S. Navy entrance channel (Atlantic Ocean) to Barrier Beach inner channel intersection Navy's Trident Access channel, thence 43 feet for 0.13 mile, thence 36 feet to Civil Turning Basin of 35 feet and continuing along Barge Canal of 12 feet. Length of Project is about 15.4 miles. The Civil Project depth of entrance channel to Barrier Beach inner channel is 37 feet. Foreign
Sheet64 CAPE CHARLES CITY HARBOR, VA- All Traffic Types (Domestic & Foreign)
Sheet65 CAPE CHARLES CITY HARBOR, VA- Domestic
Sheet66 CAPE CHARLES CITY HARBOR, VA- Foreign
Sheet67 CARVERS HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet68 CARVERS HARBOR, ME- Domestic
Sheet69 CARVERS HARBOR, ME- Foreign
Sheet70 CHARLESTON HARBOR, SC (INCLUDING ASHLEY RIVER, COOPER RIVER, SHEM CREEK AND SHIPYARD RIVER, SC)- Section Included: Ocean to Goose Creek via Cooper River and Town Creek; to the Standard Wharf on Ashley River; to the Mount Pleasant Memorial Highway Bridge on Shem Creek; to the Airco Alloys Wharf on Shipyard River; Wando River to Cainhoy. Controlling Depth: 40 feet for 800 feet width across the entrance channel; thence 26.7 feet for project widths to head of project (15.7 miles): Shipyard Ri ver 28.4 feet to head of project (1.2 miles), Wando River controlling depth 41.6 feet for 400 foot widths to head of project. Project Depth: Charleston Harbor 45 feet; Shem Creek 10 feet; Ashley River 30 feet; Shipyard River 36 feet; Wando River 40 feet. All Traffic Types (Domestic & Foreign)
Sheet71 CHARLESTON HARBOR, SC (INCLUDING ASHLEY RIVER, COOPER RIVER, SHEM CREEK AND SHIPYARD RIVER, SC)- Section Included: Ocean to Goose Creek via Cooper River and Town Creek; to the Standard Wharf on Ashley River; to the Mount Pleasant Memorial Highway Bridge on Shem Creek; to the Airco Alloys Wharf on Shipyard River; Wando River to Cainhoy. Controlling Depth: 40 feet for 800 feet width across the entrance channel; thence 26.7 feet for project widths to head of project (15.7 miles): Shipyard Ri ver 28.4 feet to head of project (1.2 miles), Wando River controlling depth 41.6 feet for 400 foot widths to head of project. Project Depth: Charleston Harbor 45 feet; Shem Creek 10 feet; Ashley River 30 feet; Shipyard River 36 feet; Wando River 40 feet. Domestic
Sheet72 CHARLESTON HARBOR, SC (INCLUDING ASHLEY RIVER, COOPER RIVER, SHEM CREEK AND SHIPYARD RIVER, SC)- Section Included: Ocean to Goose Creek via Cooper River and Town Creek; to the Standard Wharf on Ashley River; to the Mount Pleasant Memorial Highway Bridge on Shem Creek; to the Airco Alloys Wharf on Shipyard River; Wando River to Cainhoy. Controlling Depth: 40 feet for 800 feet width across the entrance channel; thence 26.7 feet for project widths to head of project (15.7 miles): Shipyard Ri ver 28.4 feet to head of project (1.2 miles), Wando River controlling depth 41.6 feet for 400 foot widths to head of project. Project Depth: Charleston Harbor 45 feet; Shem Creek 10 feet; Ashley River 30 feet; Shipyard River 36 feet; Wando River 40 feet. Foreign
Sheet73 CHELSEA RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth to about 1.6 miles upstream. Maintained Depth at Mid-Channel: From McArdle Bridge to Chelsea Street Bridge 29.6 feet; from Chelsea Street Bridge to turning basin 33.6 feet. Tidal range to 10 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet74 CHELSEA RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth to about 1.6 miles upstream. Maintained Depth at Mid-Channel: From McArdle Bridge to Chelsea Street Bridge 29.6 feet; from Chelsea Street Bridge to turning basin 33.6 feet. Tidal range to 10 feet mean higher high water. Domestic
Sheet75 CHELSEA RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth to about 1.6 miles upstream. Maintained Depth at Mid-Channel: From McArdle Bridge to Chelsea Street Bridge 29.6 feet; from Chelsea Street Bridge to turning basin 33.6 feet. Tidal range to 10 feet mean higher high water. Foreign
Sheet76 CLAIBORNE HARBOR, MD- All Traffic Types (Domestic & Foreign)
Sheet77 CLAIBORNE HARBOR, MD- Domestic
Sheet78 CLAIBORNE HARBOR, MD- Foreign
Sheet79 CONEY ISLAND CREEK, NY (INCLUDED IN PORT OF NEW YORK)- All Traffic Types (Domestic & Foreign)
Sheet80 CONEY ISLAND CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Domestic
Sheet81 CONEY ISLAND CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Foreign
Sheet82 CRISFIELD HARBOR, MD- All Traffic Types (Domestic & Foreign)
Sheet83 CRISFIELD HARBOR, MD- Domestic
Sheet84 CRISFIELD HARBOR, MD- Foreign
Sheet85 CUTTYHUNK HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet86 CUTTYHUNK HARBOR, MA- Domestic
Sheet87 CUTTYHUNK HARBOR, MA- Foreign
Sheet88 DARIEN HARBOR, GA- All Traffic Types (Domestic & Foreign)
Sheet89 DARIEN HARBOR, GA- Domestic
Sheet90 DARIEN HARBOR, GA- Foreign
Sheet91 DELAWARE RIVER AT CAMDEN, NJ (INCLUDED IN DELAWARE RIVER, PHILADELPHIA, PA TO THE SEA)- Section Included: Newton Creek, NJ to Cooper Point, NJ, 4 miles. Controlling Depth: May 1989, 30 feet from Newton Creek to Berkely St. and thence in May 1989, 17.4 feet to Cooper Point. Project Depth: 18 feet, 30 feet and 37 feet at mean low water (37 feet deferred for restudy). All Traffic Types (Domestic & Foreign)
Sheet92 DELAWARE RIVER AT CAMDEN, NJ (INCLUDED IN DELAWARE RIVER, PHILADELPHIA, PA TO THE SEA)- Section Included: Newton Creek, NJ to Cooper Point, NJ, 4 miles. Controlling Depth: May 1989, 30 feet from Newton Creek to Berkely St. and thence in May 1989, 17.4 feet to Cooper Point. Project Depth: 18 feet, 30 feet and 37 feet at mean low water (37 feet deferred for restudy). Domestic
Sheet93 DELAWARE RIVER AT CAMDEN, NJ (INCLUDED IN DELAWARE RIVER, PHILADELPHIA, PA TO THE SEA)- Section Included: Newton Creek, NJ to Cooper Point, NJ, 4 miles. Controlling Depth: May 1989, 30 feet from Newton Creek to Berkely St. and thence in May 1989, 17.4 feet to Cooper Point. Project Depth: 18 feet, 30 feet and 37 feet at mean low water (37 feet deferred for restudy). Foreign
Sheet94 EAST BOOTHBAY HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet95 EAST BOOTHBAY HARBOR, ME- Domestic
Sheet96 EAST BOOTHBAY HARBOR, ME- Foreign
Sheet97 EAST CHESTER CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Long Island Sound to Canal Street. Controlling Depth: 8 feet from Long Island Sound to a point opposite Turtle Cove; balance of waterway ranges from 0.7 to 8 feet. Project Depth: Maintained to 8 feet. All mean low water. Project Length: 5 miles. All Traffic Types (Domestic & Foreign)
Sheet98 EAST CHESTER CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Long Island Sound to Canal Street. Controlling Depth: 8 feet from Long Island Sound to a point opposite Turtle Cove; balance of waterway ranges from 0.7 to 8 feet. Project Depth: Maintained to 8 feet. All mean low water. Project Length: 5 miles. Domestic
Sheet99 EAST CHESTER CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Long Island Sound to Canal Street. Controlling Depth: 8 feet from Long Island Sound to a point opposite Turtle Cove; balance of waterway ranges from 0.7 to 8 feet. Project Depth: Maintained to 8 feet. All mean low water. Project Length: 5 miles. Foreign
Sheet100 EAST RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Upper New York Bay to Throgs Neck. Controlling Depth: 40 feet from Upper Bay to Wallabout Channel; balance of waterway ranges from 20 to 35 feet. Project Depth: 40 feet to former Brooklyn Navy Yard; 35 feet above the former Brooklyn Navy Yard. All at mean low water. Project Length: About 16 miles. All Traffic Types (Domestic & Foreign)
Sheet101 EAST RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Upper New York Bay to Throgs Neck. Controlling Depth: 40 feet from Upper Bay to Wallabout Channel; balance of waterway ranges from 20 to 35 feet. Project Depth: 40 feet to former Brooklyn Navy Yard; 35 feet above the former Brooklyn Navy Yard. All at mean low water. Project Length: About 16 miles. Domestic
Sheet102 EAST RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Upper New York Bay to Throgs Neck. Controlling Depth: 40 feet from Upper Bay to Wallabout Channel; balance of waterway ranges from 20 to 35 feet. Project Depth: 40 feet to former Brooklyn Navy Yard; 35 feet above the former Brooklyn Navy Yard. All at mean low water. Project Length: About 16 miles. Foreign
Sheet103 EASTPORT HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet104 EASTPORT HARBOR, ME- Domestic
Sheet105 EASTPORT HARBOR, ME- Foreign
Sheet106 EDENTON HARBOR, NC- All Traffic Types (Domestic & Foreign)
Sheet107 EDENTON HARBOR, NC- Domestic
Sheet108 EDENTON HARBOR, NC- Foreign
Sheet109 EDGARTOWN HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet110 EDGARTOWN HARBOR, MA- Domestic
Sheet111 EDGARTOWN HARBOR, MA- Foreign
Sheet112 FALL RIVER HARBOR, MA- Section Included: From the Railroad Bridge between Aquidneck Island and Tiverton in a northerly direction to Trestle Pier Light in the Taunton River. Controlling Depth: 33 feet with shoaling on limits in the 35-foot channel. 400 feet wide through Mount Hope Bay to the Braga Bridge; thence 25.2 feet in the 35-foot channel to the wharves above the bridge; 31.8 feet in the 35-foot turning basin. Project Depth: 40 feet in channel and turning basin; 40 feet on lower end  of Hog Island shoal; dredged to 35 feet; 40 foot project inactive. All Traffic Types (Domestic & Foreign)
Sheet113 FALL RIVER HARBOR, MA- Section Included: From the Railroad Bridge between Aquidneck Island and Tiverton in a northerly direction to Trestle Pier Light in the Taunton River. Controlling Depth: 33 feet with shoaling on limits in the 35-foot channel. 400 feet wide through Mount Hope Bay to the Braga Bridge; thence 25.2 feet in the 35-foot channel to the wharves above the bridge; 31.8 feet in the 35-foot turning basin. Project Depth: 40 feet in channel and turning basin; 40 feet on lower end  of Hog Island shoal; dredged to 35 feet; 40 foot project inactive. Domestic
Sheet114 FALL RIVER HARBOR, MA- Section Included: From the Railroad Bridge between Aquidneck Island and Tiverton in a northerly direction to Trestle Pier Light in the Taunton River. Controlling Depth: 33 feet with shoaling on limits in the 35-foot channel. 400 feet wide through Mount Hope Bay to the Braga Bridge; thence 25.2 feet in the 35-foot channel to the wharves above the bridge; 31.8 feet in the 35-foot turning basin. Project Depth: 40 feet in channel and turning basin; 40 feet on lower end  of Hog Island shoal; dredged to 35 feet; 40 foot project inactive. Foreign
Sheet115 FALMOUTH HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet116 FALMOUTH HARBOR, MA- Domestic
Sheet117 FALMOUTH HARBOR, MA- Foreign
Sheet118 FERNANDINA HARBOR, FL- Section Included: From the bar to the junction of Lanceford Creek with Amelia River. Controlling Depth: 46 feet in the entrance channel thence 32 feet in the inner channel to the Nassav Terminals. Constructed Project Depths: The entrance channel was deepened to 46 feet in connection with the construction of the F.B.M. Submarine Support Base At King's Bay, St. Mary's, Georgia. The Inner Harbor Channel authorized to the 32 foot project. Length of project is about 1 3 miles. All Traffic Types (Domestic & Foreign)
Sheet119 FERNANDINA HARBOR, FL- Section Included: From the bar to the junction of Lanceford Creek with Amelia River. Controlling Depth: 46 feet in the entrance channel thence 32 feet in the inner channel to the Nassav Terminals. Constructed Project Depths: The entrance channel was deepened to 46 feet in connection with the construction of the F.B.M. Submarine Support Base At King's Bay, St. Mary's, Georgia. The Inner Harbor Channel authorized to the 32 foot project. Length of project is about 1 3 miles. Domestic
Sheet120 FERNANDINA HARBOR, FL- Section Included: From the bar to the junction of Lanceford Creek with Amelia River. Controlling Depth: 46 feet in the entrance channel thence 32 feet in the inner channel to the Nassav Terminals. Constructed Project Depths: The entrance channel was deepened to 46 feet in connection with the construction of the F.B.M. Submarine Support Base At King's Bay, St. Mary's, Georgia. The Inner Harbor Channel authorized to the 32 foot project. Length of project is about 1 3 miles. Foreign
Sheet121 FLUSHING BAY AND CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in East River to Roosevelt Avenue Bridge. Controlling Depth: 15 feet from East River to junction with Branch Channel; balance of waterway ranges from 2 to 14 feet. Project Depth: 15 feet in Bay, Branch and Creek Channels, and maneuvering area, and 6 feet in anchorage area. All at mean low water. Project Length: 2.9 miles. All Traffic Types (Domestic & Foreign)
Sheet122 FLUSHING BAY AND CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in East River to Roosevelt Avenue Bridge. Controlling Depth: 15 feet from East River to junction with Branch Channel; balance of waterway ranges from 2 to 14 feet. Project Depth: 15 feet in Bay, Branch and Creek Channels, and maneuvering area, and 6 feet in anchorage area. All at mean low water. Project Length: 2.9 miles. Domestic
Sheet123 FLUSHING BAY AND CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in East River to Roosevelt Avenue Bridge. Controlling Depth: 15 feet from East River to junction with Branch Channel; balance of waterway ranges from 2 to 14 feet. Project Depth: 15 feet in Bay, Branch and Creek Channels, and maneuvering area, and 6 feet in anchorage area. All at mean low water. Project Length: 2.9 miles. Foreign
Sheet124 FORT PIERCE HARBOR, FL- Section Included: Atlantic Ocean to and including Turning Basin at Fort Pierce, 3.5 miles; Intracoastal Waterway along Fort Pierce waterfront between the north bridge at Fort Pierce and Georgia Avenue extended, 2.5 miles. Maintained Depth: 26 feet in bar cut: 24 feet in inner channel, 12 feet in section of Intracoastal Waterway through harbor, 25 feet in Turning Basin. Tidal range to 3 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet125 FORT PIERCE HARBOR, FL- Section Included: Atlantic Ocean to and including Turning Basin at Fort Pierce, 3.5 miles; Intracoastal Waterway along Fort Pierce waterfront between the north bridge at Fort Pierce and Georgia Avenue extended, 2.5 miles. Maintained Depth: 26 feet in bar cut: 24 feet in inner channel, 12 feet in section of Intracoastal Waterway through harbor, 25 feet in Turning Basin. Tidal range to 3 feet mean higher high water. Domestic
Sheet126 FORT PIERCE HARBOR, FL- Section Included: Atlantic Ocean to and including Turning Basin at Fort Pierce, 3.5 miles; Intracoastal Waterway along Fort Pierce waterfront between the north bridge at Fort Pierce and Georgia Avenue extended, 2.5 miles. Maintained Depth: 26 feet in bar cut: 24 feet in inner channel, 12 feet in section of Intracoastal Waterway through harbor, 25 feet in Turning Basin. Tidal range to 3 feet mean higher high water. Foreign
Sheet127 GLEN COVE HARBOR, NY- All Traffic Types (Domestic & Foreign)
Sheet128 GLEN COVE HARBOR, NY- Domestic
Sheet129 GLEN COVE HARBOR, NY- Foreign
Sheet130 GLOUCESTER HARBOR, MA- Section Included: The harbor proper, including Annisquam River lies wholly within the city of Gloucester. Controlling Depth: 19.5 feet in inner harbor; 19.7 feet in outer harbor; 18.0 feet in Harbor Cove and 18.9 feet along waterfront. Generally 6.7 feet in Annisquam River Channel with 6.2 feet over bar in Ipswich Bay: Local knowledge required. Project Depth: Entrance channel, 20 feet; Acess Channels and North and South Branch Channels, 16-20 feet; Annisquam River Channel, 8 feet. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet131 GLOUCESTER HARBOR, MA- Section Included: The harbor proper, including Annisquam River lies wholly within the city of Gloucester. Controlling Depth: 19.5 feet in inner harbor; 19.7 feet in outer harbor; 18.0 feet in Harbor Cove and 18.9 feet along waterfront. Generally 6.7 feet in Annisquam River Channel with 6.2 feet over bar in Ipswich Bay: Local knowledge required. Project Depth: Entrance channel, 20 feet; Acess Channels and North and South Branch Channels, 16-20 feet; Annisquam River Channel, 8 feet. All at mean low water. Domestic
Sheet132 GLOUCESTER HARBOR, MA- Section Included: The harbor proper, including Annisquam River lies wholly within the city of Gloucester. Controlling Depth: 19.5 feet in inner harbor; 19.7 feet in outer harbor; 18.0 feet in Harbor Cove and 18.9 feet along waterfront. Generally 6.7 feet in Annisquam River Channel with 6.2 feet over bar in Ipswich Bay: Local knowledge required. Project Depth: Entrance channel, 20 feet; Acess Channels and North and South Branch Channels, 16-20 feet; Annisquam River Channel, 8 feet. All at mean low water. Foreign
Sheet133 GOWANUS CREEK CHANNEL, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From 28th street to Hamilton Avenue Bridge. Controlling Depth: 28.2 feet from entrance to Percival Street, thence 23 feet to Sigourney Street; thence 10 feet to Hamilton Ave.; 27 feet in Branch Channel in Henry St. Basin. Project Depth: 30 feet and 18 feet, all at mean low water. Project Length: 0.8 miles. All Traffic Types (Domestic & Foreign)
Sheet134 GOWANUS CREEK CHANNEL, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From 28th street to Hamilton Avenue Bridge. Controlling Depth: 28.2 feet from entrance to Percival Street, thence 23 feet to Sigourney Street; thence 10 feet to Hamilton Ave.; 27 feet in Branch Channel in Henry St. Basin. Project Depth: 30 feet and 18 feet, all at mean low water. Project Length: 0.8 miles. Domestic
Sheet135 GOWANUS CREEK CHANNEL, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From 28th street to Hamilton Avenue Bridge. Controlling Depth: 28.2 feet from entrance to Percival Street, thence 23 feet to Sigourney Street; thence 10 feet to Hamilton Ave.; 27 feet in Branch Channel in Henry St. Basin. Project Depth: 30 feet and 18 feet, all at mean low water. Project Length: 0.8 miles. Foreign
Sheet136 GREAT KILLS HARBOR, STATEN ISLAND, NY (INCLUDED IN PORT OF NEW YORK)- All Traffic Types (Domestic & Foreign)
Sheet137 GREAT KILLS HARBOR, STATEN ISLAND, NY (INCLUDED IN PORT OF NEW YORK)- Domestic
Sheet138 GREAT KILLS HARBOR, STATEN ISLAND, NY (INCLUDED IN PORT OF NEW YORK)- Foreign
Sheet139 GREAT SALT POND, BLOCK ISLAND, RI- All Traffic Types (Domestic & Foreign)
Sheet140 GREAT SALT POND, BLOCK ISLAND, RI- Domestic
Sheet141 GREAT SALT POND, BLOCK ISLAND, RI- Foreign
Sheet142 GREENPORT HARBOR, NY- All Traffic Types (Domestic & Foreign)
Sheet143 GREENPORT HARBOR, NY- Domestic
Sheet144 GREENPORT HARBOR, NY- Foreign
Sheet145 GREENWICH HARBOR, CT- All Traffic Types (Domestic & Foreign)
Sheet146 GREENWICH HARBOR, CT- Domestic
Sheet147 GREENWICH HARBOR, CT- Foreign
Sheet148 HACKENSACK RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From mouth upstream to New York, Susquehanna & Western R. R. Bridge at Hackensack. Maintained Depth: 30 feet from the junction of Hackensack and Passaic Rivers to 300 feet south of Central Railroad of New Jersey Bridge; balance of waterway ranges from 10 to 30 feet. Project Length: 16.5 miles. Tidal range to 6 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet149 HACKENSACK RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From mouth upstream to New York, Susquehanna & Western R. R. Bridge at Hackensack. Maintained Depth: 30 feet from the junction of Hackensack and Passaic Rivers to 300 feet south of Central Railroad of New Jersey Bridge; balance of waterway ranges from 10 to 30 feet. Project Length: 16.5 miles. Tidal range to 6 feet mean higher high water. Domestic
Sheet150 HACKENSACK RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From mouth upstream to New York, Susquehanna & Western R. R. Bridge at Hackensack. Maintained Depth: 30 feet from the junction of Hackensack and Passaic Rivers to 300 feet south of Central Railroad of New Jersey Bridge; balance of waterway ranges from 10 to 30 feet. Project Length: 16.5 miles. Tidal range to 6 feet mean higher high water. Foreign
Sheet151 HAMPTON ROADS, VA- Section Included: Norfolk Harbor, Port of Newport News (including Newport News Creek), Hampton Creek, and channel from Phoebus to Deepwater in Hampton Roads, VA. All Traffic Types (Domestic & Foreign)
Sheet152 HAMPTON ROADS, VA- Section Included: Norfolk Harbor, Port of Newport News (including Newport News Creek), Hampton Creek, and channel from Phoebus to Deepwater in Hampton Roads, VA. Domestic
Sheet153 HAMPTON ROADS, VA- Section Included: Norfolk Harbor, Port of Newport News (including Newport News Creek), Hampton Creek, and channel from Phoebus to Deepwater in Hampton Roads, VA. Foreign
Sheet154 HARBOR OF REFUGE, BLOCK ISLAND, RI- All Traffic Types (Domestic & Foreign)
Sheet155 HARBOR OF REFUGE, BLOCK ISLAND, RI- Domestic
Sheet156 HARBOR OF REFUGE, BLOCK ISLAND, RI- Foreign
Sheet157 HARBOR OF REFUGE, CAPE LOOKOUT, NC- All Traffic Types (Domestic & Foreign)
Sheet158 HARBOR OF REFUGE, CAPE LOOKOUT, NC- Domestic
Sheet159 HARBOR OF REFUGE, CAPE LOOKOUT, NC- Foreign
Sheet160 HARBOR OF REFUGE, DELAWARE BAY, DE- All Traffic Types (Domestic & Foreign)
Sheet161 HARBOR OF REFUGE, DELAWARE BAY, DE- Domestic
Sheet162 HARBOR OF REFUGE, DELAWARE BAY, DE- Foreign
Sheet163 HARBOR OF REFUGE, NANTUCKET, MA- All Traffic Types (Domestic & Foreign)
Sheet164 HARBOR OF REFUGE, NANTUCKET, MA- Domestic
Sheet165 HARBOR OF REFUGE, NANTUCKET, MA- Foreign
Sheet166 HARBOR OF REFUGE, POINT JUDITH AND POINT JUDITH POND, RI- All Traffic Types (Domestic & Foreign)
Sheet167 HARBOR OF REFUGE, POINT JUDITH AND POINT JUDITH POND, RI- Domestic
Sheet168 HARBOR OF REFUGE, POINT JUDITH AND POINT JUDITH POND, RI- Foreign
Sheet169 HARLEM RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Hudson River. Maintained Depth: 15 feet from East River to Spuyten Duyvil R. R. Bridge: balance of waterway ranges from 14 to 15 feet. Project Length: 7.6 miles. Tidal range to 5 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet170 HARLEM RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Hudson River. Maintained Depth: 15 feet from East River to Spuyten Duyvil R. R. Bridge: balance of waterway ranges from 14 to 15 feet. Project Length: 7.6 miles. Tidal range to 5 feet mean higher high water. Domestic
Sheet171 HARLEM RIVER, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Hudson River. Maintained Depth: 15 feet from East River to Spuyten Duyvil R. R. Bridge: balance of waterway ranges from 14 to 15 feet. Project Length: 7.6 miles. Tidal range to 5 feet mean higher high water. Foreign
Sheet172 HAY (WEST) HARBOR, NY- All Traffic Types (Domestic & Foreign)
Sheet173 HAY (WEST) HARBOR, NY- Domestic
Sheet174 HAY (WEST) HARBOR, NY- Foreign
Sheet175 HEMPSTEAD HARBOR, NY- Section Included: From Long Island Sound to Roslyn Town Wharf. Controlling Depth: 6 feet from entrance of bar beach to 2,750 feet above entrance, thence 6 feet to 0.0 feet to head of project. Project Depth: 13 feet and 6 feet. All at mean low water. Project Length: 2.3 miles. All Traffic Types (Domestic & Foreign)
Sheet176 HEMPSTEAD HARBOR, NY- Section Included: From Long Island Sound to Roslyn Town Wharf. Controlling Depth: 6 feet from entrance of bar beach to 2,750 feet above entrance, thence 6 feet to 0.0 feet to head of project. Project Depth: 13 feet and 6 feet. All at mean low water. Project Length: 2.3 miles. Domestic
Sheet177 HEMPSTEAD HARBOR, NY- Section Included: From Long Island Sound to Roslyn Town Wharf. Controlling Depth: 6 feet from entrance of bar beach to 2,750 feet above entrance, thence 6 feet to 0.0 feet to head of project. Project Depth: 13 feet and 6 feet. All at mean low water. Project Length: 2.3 miles. Foreign
Sheet178 HORN HARBOR, VA- All Traffic Types (Domestic & Foreign)
Sheet179 HORN HARBOR, VA- Domestic
Sheet180 HORN HARBOR, VA- Foreign
Sheet181 HUDSON RIVER CHANNEL, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Upper Bay to a point opposite West 156th Street, Manhattan. Controlling Depth: 39 to 43 feet, 2,000 to 3,600 feet wide from deep water in the Upper Bay to West 40th Street; balance of waterway ranges from 38 to 48 feet. 21 to 30 feet in Weehawken-Edgewater Channel. Project Depth and length: 40 feet, 45 feet and 48 feet from Upper Bay to opposite West 59th Street; 6 miles. 30 feet in Weeha wken-Edgewater Channel; 5 miles. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet182 HUDSON RIVER CHANNEL, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Upper Bay to a point opposite West 156th Street, Manhattan. Controlling Depth: 39 to 43 feet, 2,000 to 3,600 feet wide from deep water in the Upper Bay to West 40th Street; balance of waterway ranges from 38 to 48 feet. 21 to 30 feet in Weehawken-Edgewater Channel. Project Depth and length: 40 feet, 45 feet and 48 feet from Upper Bay to opposite West 59th Street; 6 miles. 30 feet in Weeha wken-Edgewater Channel; 5 miles. All at mean low water. Domestic
Sheet183 HUDSON RIVER CHANNEL, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Upper Bay to a point opposite West 156th Street, Manhattan. Controlling Depth: 39 to 43 feet, 2,000 to 3,600 feet wide from deep water in the Upper Bay to West 40th Street; balance of waterway ranges from 38 to 48 feet. 21 to 30 feet in Weehawken-Edgewater Channel. Project Depth and length: 40 feet, 45 feet and 48 feet from Upper Bay to opposite West 59th Street; 6 miles. 30 feet in Weeha wken-Edgewater Channel; 5 miles. All at mean low water. Foreign
Sheet184 HUDSON RIVER, NY (LOWER SECTION) (INCLUDED IN PORT OF NEW YORK, ALSO INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: From Upper New York City limits to Tarrytown; not including the latter. Controlling Depth: 32 feet mean low water. Project Depth: 34 feet in rock and 32 feet in soft material. Project Length: 13.3 miles. All Traffic Types (Domestic & Foreign)
Sheet185 HUDSON RIVER, NY (LOWER SECTION) (INCLUDED IN PORT OF NEW YORK, ALSO INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: From Upper New York City limits to Tarrytown; not including the latter. Controlling Depth: 32 feet mean low water. Project Depth: 34 feet in rock and 32 feet in soft material. Project Length: 13.3 miles. Domestic
Sheet186 HUDSON RIVER, NY (LOWER SECTION) (INCLUDED IN PORT OF NEW YORK, ALSO INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: From Upper New York City limits to Tarrytown; not including the latter. Controlling Depth: 32 feet mean low water. Project Depth: 34 feet in rock and 32 feet in soft material. Project Length: 13.3 miles. Foreign
Sheet187 HYANNIS HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet188 HYANNIS HARBOR, MA- Domestic
Sheet189 HYANNIS HARBOR, MA- Foreign
Sheet190 ISLAND END RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: Entrance channel in the Island End River 6 feet deep shy 100 feet wide from deep water in the vicinity of the Mystic River Channel upstream for a distance of approximately 2,500 feet. Controlling depth 5 feet in the west half of the channel with shoaling to less than 1 foot in the east half, depths of 5 feet in the basin. Tidal Range 10 feet mean low water. All Traffic Types (Domestic & Foreign)
Sheet191 ISLAND END RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: Entrance channel in the Island End River 6 feet deep shy 100 feet wide from deep water in the vicinity of the Mystic River Channel upstream for a distance of approximately 2,500 feet. Controlling depth 5 feet in the west half of the channel with shoaling to less than 1 foot in the east half, depths of 5 feet in the basin. Tidal Range 10 feet mean low water. Domestic
Sheet192 ISLAND END RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: Entrance channel in the Island End River 6 feet deep shy 100 feet wide from deep water in the vicinity of the Mystic River Channel upstream for a distance of approximately 2,500 feet. Controlling depth 5 feet in the west half of the channel with shoaling to less than 1 foot in the east half, depths of 5 feet in the basin. Tidal Range 10 feet mean low water. Foreign
Sheet193 ISLE OF SHOALS HARBOR, ME AND NH- All Traffic Types (Domestic & Foreign)
Sheet194 ISLE OF SHOALS HARBOR, ME AND NH- Domestic
Sheet195 ISLE OF SHOALS HARBOR, ME AND NH- Foreign
Sheet196 JACKSONVILLE HARBOR, FL- Section Included: Atlantic Ocean to the Florida East Coast Railway Bridge at Jacksonville, 26.8 miles. Maintained Depth: 36 feet, Atlantic Ocean to Terminal Channel, mile 20, except for shoals in the outside quarter; thence 34 feet thru Terminal Channel, mile 20 to Commodore Point (Hart Bridge), except for shoals in the outside quarter. Length of Project is 27 miles. Tidal range to 5 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet197 JACKSONVILLE HARBOR, FL- Section Included: Atlantic Ocean to the Florida East Coast Railway Bridge at Jacksonville, 26.8 miles. Maintained Depth: 36 feet, Atlantic Ocean to Terminal Channel, mile 20, except for shoals in the outside quarter; thence 34 feet thru Terminal Channel, mile 20 to Commodore Point (Hart Bridge), except for shoals in the outside quarter. Length of Project is 27 miles. Tidal range to 5 feet mean higher high water. Domestic
Sheet198 JACKSONVILLE HARBOR, FL- Section Included: Atlantic Ocean to the Florida East Coast Railway Bridge at Jacksonville, 26.8 miles. Maintained Depth: 36 feet, Atlantic Ocean to Terminal Channel, mile 20, except for shoals in the outside quarter; thence 34 feet thru Terminal Channel, mile 20 to Commodore Point (Hart Bridge), except for shoals in the outside quarter. Length of Project is 27 miles. Tidal range to 5 feet mean higher high water. Foreign
Sheet199 JAMAICA BAY, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: Entire Bay. Controlling Depth: Entrance Channel 20 feet from Atlantic Ocean to Rockaway Point, thence 18 feet to Barren Island. Branch Channels range from 12 to 18 feet. Project Depth: 23, 20 and 12 feet. All at mean low water. Project Length: 19.5 miles. All Traffic Types (Domestic & Foreign)
Sheet200 JAMAICA BAY, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: Entire Bay. Controlling Depth: Entrance Channel 20 feet from Atlantic Ocean to Rockaway Point, thence 18 feet to Barren Island. Branch Channels range from 12 to 18 feet. Project Depth: 23, 20 and 12 feet. All at mean low water. Project Length: 19.5 miles. Domestic
Sheet201 JAMAICA BAY, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: Entire Bay. Controlling Depth: Entrance Channel 20 feet from Atlantic Ocean to Rockaway Point, thence 18 feet to Barren Island. Branch Channels range from 12 to 18 feet. Project Depth: 23, 20 and 12 feet. All at mean low water. Project Length: 19.5 miles. Foreign
Sheet202 KEY WEST HARBOR, FL- All Traffic Types (Domestic & Foreign)
Sheet203 KEY WEST HARBOR, FL- Domestic
Sheet204 KEY WEST HARBOR, FL- Foreign
Sheet205 LAGOON POND, MARTHA'S VINEYARD, MA- All Traffic Types (Domestic & Foreign)
Sheet206 LAGOON POND, MARTHA'S VINEYARD, MA- Domestic
Sheet207 LAGOON POND, MARTHA'S VINEYARD, MA- Foreign
Sheet208 LAKE MONTAUK HARBOR, NY- All Traffic Types (Domestic & Foreign)
Sheet209 LAKE MONTAUK HARBOR, NY- Domestic
Sheet210 LAKE MONTAUK HARBOR, NY- Foreign
Sheet211 LYNN HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet212 LYNN HARBOR, MA- Domestic
Sheet213 LYNN HARBOR, MA- Foreign
Sheet214 MAIN WATERFRONT (INCLUDED IN PORT OF BOSTON)- Section Included: From a point in President Roads between Deer Island and Long Island to the mouths of Ft. Point Channel, Charles River, Mystic River, and Chelsea River. Maintained Depth: 38 feet in 40-foot channel to opposite pier no. 49; 34 feet in the 35-foot area and 34 feet in the President Roads Anchorage; 34 feet in the 35-foot channel and 33 feet in waterfront channel. Tidal range 10 feet at mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet215 MAIN WATERFRONT (INCLUDED IN PORT OF BOSTON)- Section Included: From a point in President Roads between Deer Island and Long Island to the mouths of Ft. Point Channel, Charles River, Mystic River, and Chelsea River. Maintained Depth: 38 feet in 40-foot channel to opposite pier no. 49; 34 feet in the 35-foot area and 34 feet in the President Roads Anchorage; 34 feet in the 35-foot channel and 33 feet in waterfront channel. Tidal range 10 feet at mean higher high water. Domestic
Sheet216 MAIN WATERFRONT (INCLUDED IN PORT OF BOSTON)- Section Included: From a point in President Roads between Deer Island and Long Island to the mouths of Ft. Point Channel, Charles River, Mystic River, and Chelsea River. Maintained Depth: 38 feet in 40-foot channel to opposite pier no. 49; 34 feet in the 35-foot area and 34 feet in the President Roads Anchorage; 34 feet in the 35-foot channel and 33 feet in waterfront channel. Tidal range 10 feet at mean higher high water. Foreign
Sheet217 MANHASSET BAY, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Manhasset Bay tO Crampton Bros. Wharf at Great Neck. Controlling Depth: 6 feet from deep water to 3,000 feet upstream; branch channels range from 4 to 0 feet. Project Depth: 8 feet in channel and turning basin. All at mean low water. Project Length: 1.4 miles. All Traffic Types (Domestic & Foreign)
Sheet218 MANHASSET BAY, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Manhasset Bay tO Crampton Bros. Wharf at Great Neck. Controlling Depth: 6 feet from deep water to 3,000 feet upstream; branch channels range from 4 to 0 feet. Project Depth: 8 feet in channel and turning basin. All at mean low water. Project Length: 1.4 miles. Domestic
Sheet219 MANHASSET BAY, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Manhasset Bay tO Crampton Bros. Wharf at Great Neck. Controlling Depth: 6 feet from deep water to 3,000 feet upstream; branch channels range from 4 to 0 feet. Project Depth: 8 feet in channel and turning basin. All at mean low water. Project Length: 1.4 miles. Foreign
Sheet220 MANNS HARBOR, NC- All Traffic Types (Domestic & Foreign)
Sheet221 MANNS HARBOR, NC- Domestic
Sheet222 MANNS HARBOR, NC- Foreign
Sheet223 MATINICUS HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet224 MATINICUS HARBOR, ME- Domestic
Sheet225 MATINICUS HARBOR, ME- Foreign
Sheet226 MATTITUCK HARBOR, NY- All Traffic Types (Domestic & Foreign)
Sheet227 MATTITUCK HARBOR, NY- Domestic
Sheet228 MATTITUCK HARBOR, NY- Foreign
Sheet229 MELBOURNE HARBOR, FL- All Traffic Types (Domestic & Foreign)
Sheet230 MELBOURNE HARBOR, FL- Domestic
Sheet231 MELBOURNE HARBOR, FL- Foreign
Sheet232 MIAMI HARBOR, FL- Section Included: An outer bar cut 44 feet deep from ocean to the beach line; a government cut 42 feet depth from beach line to Fisher Island Basin; a Main Shipping Channel 36 feet depth; a channel 15 deep in Miami River. Maintained Depth: 43 feet in middle half of outer bar cut; 42 feet from beach line to Fisher Island turning basin; 33 feet at Main Shipping Channel. Tidal range to 3 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet233 MIAMI HARBOR, FL- Section Included: An outer bar cut 44 feet deep from ocean to the beach line; a government cut 42 feet depth from beach line to Fisher Island Basin; a Main Shipping Channel 36 feet depth; a channel 15 deep in Miami River. Maintained Depth: 43 feet in middle half of outer bar cut; 42 feet from beach line to Fisher Island turning basin; 33 feet at Main Shipping Channel. Tidal range to 3 feet mean higher high water. Domestic
Sheet234 MIAMI HARBOR, FL- Section Included: An outer bar cut 44 feet deep from ocean to the beach line; a government cut 42 feet depth from beach line to Fisher Island Basin; a Main Shipping Channel 36 feet depth; a channel 15 deep in Miami River. Maintained Depth: 43 feet in middle half of outer bar cut; 42 feet from beach line to Fisher Island turning basin; 33 feet at Main Shipping Channel. Tidal range to 3 feet mean higher high water. Foreign
Sheet235 MIAMI RIVER, FL (INCLUDED IN TRAFFIC OF MIAMI HARBOR, FL)- Section Included: Mouth to N. W. 36th Street Bridge, 5.5 miles. Controlling Depth: 14 feet at mean low water from mouth to Miami Canal, and thence to 9 feet to N. W. 36th Street Bridge, 1.5 miles. Project Depth: 15 feet under flood conditions from mouth to a point 5.5 miles upstream. All Traffic Types (Domestic & Foreign)
Sheet236 MIAMI RIVER, FL (INCLUDED IN TRAFFIC OF MIAMI HARBOR, FL)- Section Included: Mouth to N. W. 36th Street Bridge, 5.5 miles. Controlling Depth: 14 feet at mean low water from mouth to Miami Canal, and thence to 9 feet to N. W. 36th Street Bridge, 1.5 miles. Project Depth: 15 feet under flood conditions from mouth to a point 5.5 miles upstream. Domestic
Sheet237 MIAMI RIVER, FL (INCLUDED IN TRAFFIC OF MIAMI HARBOR, FL)- Section Included: Mouth to N. W. 36th Street Bridge, 5.5 miles. Controlling Depth: 14 feet at mean low water from mouth to Miami Canal, and thence to 9 feet to N. W. 36th Street Bridge, 1.5 miles. Project Depth: 15 feet under flood conditions from mouth to a point 5.5 miles upstream. Foreign
Sheet238 MOREHEAD CITY HARBOR, NC- Section Included: Morehead City Harbor, NC. Controlling Depth: 40 feet from the ocean to the Marine Terminals; other channels range from 6.5 to 12.0 feet. Project Depth: 42 feet deep 450 feet wide across bar channel; a Cutoff Channel, 40 feet deep and 600 feet wide, an Inner Harbor Channel 40 feet deep and 400 feet wide; and a depth of 40 feet in the east leg of the turning basin, including a 1,200-foot diameter turning area; 35 feet in the west leg of the turnin g basin and 12 feet from the turning basin to 10th Street, Morehead City, and 6 feet to Bogue Sound. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet239 MOREHEAD CITY HARBOR, NC- Section Included: Morehead City Harbor, NC. Controlling Depth: 40 feet from the ocean to the Marine Terminals; other channels range from 6.5 to 12.0 feet. Project Depth: 42 feet deep 450 feet wide across bar channel; a Cutoff Channel, 40 feet deep and 600 feet wide, an Inner Harbor Channel 40 feet deep and 400 feet wide; and a depth of 40 feet in the east leg of the turning basin, including a 1,200-foot diameter turning area; 35 feet in the west leg of the turnin g basin and 12 feet from the turning basin to 10th Street, Morehead City, and 6 feet to Bogue Sound. All at mean low water. Domestic
Sheet240 MOREHEAD CITY HARBOR, NC- Section Included: Morehead City Harbor, NC. Controlling Depth: 40 feet from the ocean to the Marine Terminals; other channels range from 6.5 to 12.0 feet. Project Depth: 42 feet deep 450 feet wide across bar channel; a Cutoff Channel, 40 feet deep and 600 feet wide, an Inner Harbor Channel 40 feet deep and 400 feet wide; and a depth of 40 feet in the east leg of the turning basin, including a 1,200-foot diameter turning area; 35 feet in the west leg of the turnin g basin and 12 feet from the turning basin to 10th Street, Morehead City, and 6 feet to Bogue Sound. All at mean low water. Foreign
Sheet241 MYSTIC RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth of river to Boston Edison Facility, thence upstream about 800 feet. Controlling Depth: From Mystic Bridge to upstream end of Revere Sugar Refinery Dock 34.0 feet; from Revere Sugar Refinery Dock to upstream limit of 35 foot channel, 33.7 feet in maintained portion: 13 feet in 20-foot channel. Project Depth: Channel 35 feet deep extending from the upper limit in 35-foot channel of Boston Harbor to 300 feet downstr eam of Malden Bridge; thence 20 feet. All Traffic Types (Domestic & Foreign)
Sheet242 MYSTIC RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth of river to Boston Edison Facility, thence upstream about 800 feet. Controlling Depth: From Mystic Bridge to upstream end of Revere Sugar Refinery Dock 34.0 feet; from Revere Sugar Refinery Dock to upstream limit of 35 foot channel, 33.7 feet in maintained portion: 13 feet in 20-foot channel. Project Depth: Channel 35 feet deep extending from the upper limit in 35-foot channel of Boston Harbor to 300 feet downstr eam of Malden Bridge; thence 20 feet. Domestic
Sheet243 MYSTIC RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth of river to Boston Edison Facility, thence upstream about 800 feet. Controlling Depth: From Mystic Bridge to upstream end of Revere Sugar Refinery Dock 34.0 feet; from Revere Sugar Refinery Dock to upstream limit of 35 foot channel, 33.7 feet in maintained portion: 13 feet in 20-foot channel. Project Depth: Channel 35 feet deep extending from the upper limit in 35-foot channel of Boston Harbor to 300 feet downstr eam of Malden Bridge; thence 20 feet. Foreign
Sheet244 NEW BEDFORD AND FAIRHAVEN HARBOR, MA- Section Included: From deepwater in Buzzards Bay through the Route 6 Bridge. Controlling Depth: 27.4 feet; branch channels range from 9 to 25 feet. Project Depth: 30 feet in entrance channel, maneuving area northwest of Palmers Island and Turning Basin above Fish Island. Branch channels range from 10 to 25 feet. All Traffic Types (Domestic & Foreign)
Sheet245 NEW BEDFORD AND FAIRHAVEN HARBOR, MA- Section Included: From deepwater in Buzzards Bay through the Route 6 Bridge. Controlling Depth: 27.4 feet; branch channels range from 9 to 25 feet. Project Depth: 30 feet in entrance channel, maneuving area northwest of Palmers Island and Turning Basin above Fish Island. Branch channels range from 10 to 25 feet. Domestic
Sheet246 NEW BEDFORD AND FAIRHAVEN HARBOR, MA- Section Included: From deepwater in Buzzards Bay through the Route 6 Bridge. Controlling Depth: 27.4 feet; branch channels range from 9 to 25 feet. Project Depth: 30 feet in entrance channel, maneuving area northwest of Palmers Island and Turning Basin above Fish Island. Branch channels range from 10 to 25 feet. Foreign
Sheet247 NEW HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet248 NEW HARBOR, ME- Domestic
Sheet249 NEW HARBOR, ME- Foreign
Sheet250 NEW HAVEN HARBOR, CT- Section Included: Main Harbor Channel: From deep water in Long Island Sound to the head of the main harbor near I-95 Bridge. The upper 1.5 miles of the harbor, Quinnipiac River: From Tomlinson Bridge to Grand Avenue Bridge 1.25 miles. West River: From the mouth to a point about 500 feet above the upstream side of the Kimberly Avenue Bridge about 1 mile. Mill River: From the mouth to Grand Avenue Bridge about 1,600 feet. Controlling Depth: Main Channel, 29.8 feet in left outside quarter, 30.5 feet in center, 31.5 feet in right outside quarter, 14 feet in the Quinnipiac River Channel to Ferry Street Draw Bridge, thence upstream 11.3 feet. Other channels range from 3 to 30 feet. Project Depth: Main Channel, 35 feet from Long Island Sound to head of harbor. Branch Channels range from 12 to 18 feet. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet251 NEW HAVEN HARBOR, CT- Section Included: Main Harbor Channel: From deep water in Long Island Sound to the head of the main harbor near I-95 Bridge. The upper 1.5 miles of the harbor, Quinnipiac River: From Tomlinson Bridge to Grand Avenue Bridge 1.25 miles. West River: From the mouth to a point about 500 feet above the upstream side of the Kimberly Avenue Bridge about 1 mile. Mill River: From the mouth to Grand Avenue Bridge about 1,600 feet. Controlling Depth: Main Channel, 29.8 feet in left outside quarter, 30.5 feet in center, 31.5 feet in right outside quarter, 14 feet in the Quinnipiac River Channel to Ferry Street Draw Bridge, thence upstream 11.3 feet. Other channels range from 3 to 30 feet. Project Depth: Main Channel, 35 feet from Long Island Sound to head of harbor. Branch Channels range from 12 to 18 feet. All at mean low water. Domestic
Sheet252 NEW HAVEN HARBOR, CT- Section Included: Main Harbor Channel: From deep water in Long Island Sound to the head of the main harbor near I-95 Bridge. The upper 1.5 miles of the harbor, Quinnipiac River: From Tomlinson Bridge to Grand Avenue Bridge 1.25 miles. West River: From the mouth to a point about 500 feet above the upstream side of the Kimberly Avenue Bridge about 1 mile. Mill River: From the mouth to Grand Avenue Bridge about 1,600 feet. Controlling Depth: Main Channel, 29.8 feet in left outside quarter, 30.5 feet in center, 31.5 feet in right outside quarter, 14 feet in the Quinnipiac River Channel to Ferry Street Draw Bridge, thence upstream 11.3 feet. Other channels range from 3 to 30 feet. Project Depth: Main Channel, 35 feet from Long Island Sound to head of harbor. Branch Channels range from 12 to 18 feet. All at mean low water. Foreign
Sheet253 NEW LONDON HARBOR, CT- Section Included: From deepwater, upstream about 3.8 miles to opposite the State Pier, including Shaws Cove and Winthrop Cove. Controlling Depth: 38.5 feet in Main Channel with shoaling near limits; 20.1 feet in Waterfront Channel. Branch Channels range from 13 to 20 feet. Project Depth: 40 feet in Main Channel (deepened by U. S. Navy). 23 feet in channel along New London waterfront, 15 feet in Shaws Cove. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet254 NEW LONDON HARBOR, CT- Section Included: From deepwater, upstream about 3.8 miles to opposite the State Pier, including Shaws Cove and Winthrop Cove. Controlling Depth: 38.5 feet in Main Channel with shoaling near limits; 20.1 feet in Waterfront Channel. Branch Channels range from 13 to 20 feet. Project Depth: 40 feet in Main Channel (deepened by U. S. Navy). 23 feet in channel along New London waterfront, 15 feet in Shaws Cove. All at mean low water. Domestic
Sheet255 NEW LONDON HARBOR, CT- Section Included: From deepwater, upstream about 3.8 miles to opposite the State Pier, including Shaws Cove and Winthrop Cove. Controlling Depth: 38.5 feet in Main Channel with shoaling near limits; 20.1 feet in Waterfront Channel. Branch Channels range from 13 to 20 feet. Project Depth: 40 feet in Main Channel (deepened by U. S. Navy). 23 feet in channel along New London waterfront, 15 feet in Shaws Cove. All at mean low water. Foreign
Sheet256 NEW RIVER, FL (INCLUDED IN TRAFFIC OF PORT EVERGLADES HARBOR, FL)- All Traffic Types (Domestic & Foreign)
Sheet257 NEW RIVER, FL (INCLUDED IN TRAFFIC OF PORT EVERGLADES HARBOR, FL)- Domestic
Sheet258 NEW RIVER, FL (INCLUDED IN TRAFFIC OF PORT EVERGLADES HARBOR, FL)- Foreign
Sheet259 NEW ROCHELLE HARBOR, NY (INCLUDED IN PORT OF NEW YORK)- All Traffic Types (Domestic & Foreign)
Sheet260 NEW ROCHELLE HARBOR, NY (INCLUDED IN PORT OF NEW YORK)- Domestic
Sheet261 NEW ROCHELLE HARBOR, NY (INCLUDED IN PORT OF NEW YORK)- Foreign
Sheet262 NEW YORK AND NEW JERSEY CHANNELS, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From Main Ship Channel northwest of Sandy Hook through Lower New York Bay, Raritan Bay, Perth Amboy Anchorage, Arthur Kill and Kill Van Kull to upper New York Bay. Maintained Depth: 35 feet from a junction with Main Ship Channel to vicinity of Tottenville; 37 feet in Perth Amboy Anchorage; balance of waterway ranges from 20 to 35 feet. Project Length: 33 miles. Tidal range to 6 feet mean higher h igh water. All Traffic Types (Domestic & Foreign)
Sheet263 NEW YORK AND NEW JERSEY CHANNELS, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From Main Ship Channel northwest of Sandy Hook through Lower New York Bay, Raritan Bay, Perth Amboy Anchorage, Arthur Kill and Kill Van Kull to upper New York Bay. Maintained Depth: 35 feet from a junction with Main Ship Channel to vicinity of Tottenville; 37 feet in Perth Amboy Anchorage; balance of waterway ranges from 20 to 35 feet. Project Length: 33 miles. Tidal range to 6 feet mean higher h igh water. Domestic
Sheet264 NEW YORK AND NEW JERSEY CHANNELS, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From Main Ship Channel northwest of Sandy Hook through Lower New York Bay, Raritan Bay, Perth Amboy Anchorage, Arthur Kill and Kill Van Kull to upper New York Bay. Maintained Depth: 35 feet from a junction with Main Ship Channel to vicinity of Tottenville; 37 feet in Perth Amboy Anchorage; balance of waterway ranges from 20 to 35 feet. Project Length: 33 miles. Tidal range to 6 feet mean higher h igh water. Foreign
Sheet265 NEWARK BAY, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: Entire Bay. Maintained Depth: 35 feet in Newark Bay, including Branch Channels at Port Newark and Port Elizabeth to a point 1,200 feet south of Central Railroad of NJ Bridge; balance of waterway ranges from 32 To 35 feet. Project Length: About 4.7 miles. Tidal range to 6 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet266 NEWARK BAY, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: Entire Bay. Maintained Depth: 35 feet in Newark Bay, including Branch Channels at Port Newark and Port Elizabeth to a point 1,200 feet south of Central Railroad of NJ Bridge; balance of waterway ranges from 32 To 35 feet. Project Length: About 4.7 miles. Tidal range to 6 feet mean higher high water. Domestic
Sheet267 NEWARK BAY, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: Entire Bay. Maintained Depth: 35 feet in Newark Bay, including Branch Channels at Port Newark and Port Elizabeth to a point 1,200 feet south of Central Railroad of NJ Bridge; balance of waterway ranges from 32 To 35 feet. Project Length: About 4.7 miles. Tidal range to 6 feet mean higher high water. Foreign
Sheet268 NEWBURYPORT HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet269 NEWBURYPORT HARBOR, MA- Domestic
Sheet270 NEWBURYPORT HARBOR, MA- Foreign
Sheet271 NEWPORT HARBOR, RI- Section Included: Harbor is on the east side of the main entrance to Narragansett Bay between Goat Island and the western shore of Newport. Channel is 21 feet deep and 300 feet wide, along the east side of Goat Island; maintenance of those portions of a channel, 18 feet deep and 750 feet wide, along the south and east sides of Goat Island lying outside the 21-foot channel; two 5-acre and 7-acre anchorages, 13 and 18 feet deep, respectively, along the main waterfront; and the removal of Nourmahal Rock in Brenton Cove to a depth of 18 feet. Tide range is 4 feet mean low water to 6 mean high water. All Traffic Types (Domestic & Foreign)
Sheet272 NEWPORT HARBOR, RI- Section Included: Harbor is on the east side of the main entrance to Narragansett Bay between Goat Island and the western shore of Newport. Channel is 21 feet deep and 300 feet wide, along the east side of Goat Island; maintenance of those portions of a channel, 18 feet deep and 750 feet wide, along the south and east sides of Goat Island lying outside the 21-foot channel; two 5-acre and 7-acre anchorages, 13 and 18 feet deep, respectively, along the main waterfront; and the removal of Nourmahal Rock in Brenton Cove to a depth of 18 feet. Tide range is 4 feet mean low water to 6 mean high water. Domestic
Sheet273 NEWPORT HARBOR, RI- Section Included: Harbor is on the east side of the main entrance to Narragansett Bay between Goat Island and the western shore of Newport. Channel is 21 feet deep and 300 feet wide, along the east side of Goat Island; maintenance of those portions of a channel, 18 feet deep and 750 feet wide, along the south and east sides of Goat Island lying outside the 21-foot channel; two 5-acre and 7-acre anchorages, 13 and 18 feet deep, respectively, along the main waterfront; and the removal of Nourmahal Rock in Brenton Cove to a depth of 18 feet. Tide range is 4 feet mean low water to 6 mean high water. Foreign
Sheet274 NEWTOWN CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Johnson Avenue. Controlling Depth: Main Channel, 20 feet to 12 feet from East River to south end of Turning Basin; balance of waterway ranges between 12 and 16 feet. Project Depth: 23, 20, and 12 feet. All at mean low water. Project Length: 5.2 miles. All Traffic Types (Domestic & Foreign)
Sheet275 NEWTOWN CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Johnson Avenue. Controlling Depth: Main Channel, 20 feet to 12 feet from East River to south end of Turning Basin; balance of waterway ranges between 12 and 16 feet. Project Depth: 23, 20, and 12 feet. All at mean low water. Project Length: 5.2 miles. Domestic
Sheet276 NEWTOWN CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to Johnson Avenue. Controlling Depth: Main Channel, 20 feet to 12 feet from East River to south end of Turning Basin; balance of waterway ranges between 12 and 16 feet. Project Depth: 23, 20, and 12 feet. All at mean low water. Project Length: 5.2 miles. Foreign
Sheet277 NIANTIC BAY AND HARBOR, CT- All Traffic Types (Domestic & Foreign)
Sheet278 NIANTIC BAY AND HARBOR, CT- Domestic
Sheet279 NIANTIC BAY AND HARBOR, CT- Foreign
Sheet280 NORFOLK HARBOR, VA- Section Included: From 55-foot contour in Hampton Roads to Norfolk & Western Railway Bridge Crossing Southern Branch of Elizabeth River, 14.78 miles; thence upstream in Southern Branch, 4.61 miles. In Eastern Branch, 2.54 miles upstream from the mouth of that branch; in Western Branch, 1.78 miles upstream from the mouth of that branch; and 0.73 miles in Scotts Creek. Maintained Depth: From the 55 foot contour in Hampton Roads to Lambert Point, outbound half 50 feet, inbo und half, 45 feet; Lambert Point to Norfolk & Western Railway Bridge Crossing Southern Branch, 39.3 feet; branch channels range from 5 to 35 feet. Two anchorages opposite Sewells Point, 45 feet deep over a swinging radius of 1,200 feet, the west anchorage maintained to 40 feet deep. Anchorage area on the west side of the 45-foot channel opposite Lamberts Point totalling 173 acres consisting of 1-1500 s.f. area 38 ft. deep; 1-1500 s.f. area 35 ft. deep; 1-3000 ft. by 1000 ft. area 20 ft., and a 45 acre area 12 ft. deep at Pinners Point. Tidal range to 3 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet281 NORFOLK HARBOR, VA- Section Included: From 55-foot contour in Hampton Roads to Norfolk & Western Railway Bridge Crossing Southern Branch of Elizabeth River, 14.78 miles; thence upstream in Southern Branch, 4.61 miles. In Eastern Branch, 2.54 miles upstream from the mouth of that branch; in Western Branch, 1.78 miles upstream from the mouth of that branch; and 0.73 miles in Scotts Creek. Maintained Depth: From the 55 foot contour in Hampton Roads to Lambert Point, outbound half 50 feet, inbo und half, 45 feet; Lambert Point to Norfolk & Western Railway Bridge Crossing Southern Branch, 39.3 feet; branch channels range from 5 to 35 feet. Two anchorages opposite Sewells Point, 45 feet deep over a swinging radius of 1,200 feet, the west anchorage maintained to 40 feet deep. Anchorage area on the west side of the 45-foot channel opposite Lamberts Point totalling 173 acres consisting of 1-1500 s.f. area 38 ft. deep; 1-1500 s.f. area 35 ft. deep; 1-3000 ft. by 1000 ft. area 20 ft., and a 45 acre area 12 ft. deep at Pinners Point. Tidal range to 3 feet mean higher high water. Domestic
Sheet282 NORFOLK HARBOR, VA- Section Included: From 55-foot contour in Hampton Roads to Norfolk & Western Railway Bridge Crossing Southern Branch of Elizabeth River, 14.78 miles; thence upstream in Southern Branch, 4.61 miles. In Eastern Branch, 2.54 miles upstream from the mouth of that branch; in Western Branch, 1.78 miles upstream from the mouth of that branch; and 0.73 miles in Scotts Creek. Maintained Depth: From the 55 foot contour in Hampton Roads to Lambert Point, outbound half 50 feet, inbo und half, 45 feet; Lambert Point to Norfolk & Western Railway Bridge Crossing Southern Branch, 39.3 feet; branch channels range from 5 to 35 feet. Two anchorages opposite Sewells Point, 45 feet deep over a swinging radius of 1,200 feet, the west anchorage maintained to 40 feet deep. Anchorage area on the west side of the 45-foot channel opposite Lamberts Point totalling 173 acres consisting of 1-1500 s.f. area 38 ft. deep; 1-1500 s.f. area 35 ft. deep; 1-3000 ft. by 1000 ft. area 20 ft., and a 45 acre area 12 ft. deep at Pinners Point. Tidal range to 3 feet mean higher high water. Foreign
Sheet283 NORTHEAST HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet284 NORTHEAST HARBOR, ME- Domestic
Sheet285 NORTHEAST HARBOR, ME- Foreign
Sheet286 NORTHPORT HARBOR, NY- Section Included: From Bluff Point to head of navigation. Controlling Depth: (1956) 8 feet, 6 feet in anchorage. Project Depth: 8 and 6 feet. All at mean low water. Project Length: 0.4 mile. All Traffic Types (Domestic & Foreign)
Sheet287 NORTHPORT HARBOR, NY- Section Included: From Bluff Point to head of navigation. Controlling Depth: (1956) 8 feet, 6 feet in anchorage. Project Depth: 8 and 6 feet. All at mean low water. Project Length: 0.4 mile. Domestic
Sheet288 NORTHPORT HARBOR, NY- Section Included: From Bluff Point to head of navigation. Controlling Depth: (1956) 8 feet, 6 feet in anchorage. Project Depth: 8 and 6 feet. All at mean low water. Project Length: 0.4 mile. Foreign
Sheet289 NORWALK HARBOR, CT- Section Included: From a point 4.5 mile below Washington Street Bridge to head of navigation at East Norwalk and Norwalk. Controlling Depth: 8.5 feet in the 12-foot channel from Long Island Sound to opposite downstream end of 10 foot anchorage, thence 7.9 feet to the Washington Bridge; 7.0 feet in the 10-foot channel to I-95 bridge; thence 5.4 feet; 5.8 feet in 10 foot basin; and 3 to 6 feet in 10 foot anchorage. Project Depth: 12 feet in channel from outer harbor to  Washington Street Bridge, South Norwalk, thence 10 feet deep to the basin at Norwalk. Anchorage adjacent to 12 foot channel at Fitchpoint Light, 10 feet. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet290 NORWALK HARBOR, CT- Section Included: From a point 4.5 mile below Washington Street Bridge to head of navigation at East Norwalk and Norwalk. Controlling Depth: 8.5 feet in the 12-foot channel from Long Island Sound to opposite downstream end of 10 foot anchorage, thence 7.9 feet to the Washington Bridge; 7.0 feet in the 10-foot channel to I-95 bridge; thence 5.4 feet; 5.8 feet in 10 foot basin; and 3 to 6 feet in 10 foot anchorage. Project Depth: 12 feet in channel from outer harbor to  Washington Street Bridge, South Norwalk, thence 10 feet deep to the basin at Norwalk. Anchorage adjacent to 12 foot channel at Fitchpoint Light, 10 feet. All at mean low water. Domestic
Sheet291 NORWALK HARBOR, CT- Section Included: From a point 4.5 mile below Washington Street Bridge to head of navigation at East Norwalk and Norwalk. Controlling Depth: 8.5 feet in the 12-foot channel from Long Island Sound to opposite downstream end of 10 foot anchorage, thence 7.9 feet to the Washington Bridge; 7.0 feet in the 10-foot channel to I-95 bridge; thence 5.4 feet; 5.8 feet in 10 foot basin; and 3 to 6 feet in 10 foot anchorage. Project Depth: 12 feet in channel from outer harbor to  Washington Street Bridge, South Norwalk, thence 10 feet deep to the basin at Norwalk. Anchorage adjacent to 12 foot channel at Fitchpoint Light, 10 feet. All at mean low water. Foreign
Sheet292 OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD- All Traffic Types (Domestic & Foreign)
Sheet293 OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD- Domestic
Sheet294 OCEAN CITY HARBOR AND INLET AND SINEPUXENT BAY, MD- Foreign
Sheet295 PALM BEACH HARBOR, FL- Section Included: Atlantic Ocean to Port of Palm Beach Terminals, 1.7 miles; Lake Worth from Riviera Bridge to Southern Boulevard Bridge at West Palm Beach, 7.5 miles; and "Palm Beach, FL side channel and basin." Controlling Depth: 34 feet, ocean to turning basin at port of Palm Beach Terminals, and 33 feet in turning basin; except for shoals in the outside quarters; 12 feet in channel. All Traffic Types (Domestic & Foreign)
Sheet296 PALM BEACH HARBOR, FL- Section Included: Atlantic Ocean to Port of Palm Beach Terminals, 1.7 miles; Lake Worth from Riviera Bridge to Southern Boulevard Bridge at West Palm Beach, 7.5 miles; and "Palm Beach, FL side channel and basin." Controlling Depth: 34 feet, ocean to turning basin at port of Palm Beach Terminals, and 33 feet in turning basin; except for shoals in the outside quarters; 12 feet in channel. Domestic
Sheet297 PALM BEACH HARBOR, FL- Section Included: Atlantic Ocean to Port of Palm Beach Terminals, 1.7 miles; Lake Worth from Riviera Bridge to Southern Boulevard Bridge at West Palm Beach, 7.5 miles; and "Palm Beach, FL side channel and basin." Controlling Depth: 34 feet, ocean to turning basin at port of Palm Beach Terminals, and 33 feet in turning basin; except for shoals in the outside quarters; 12 feet in channel. Foreign
Sheet298 PASSAIC RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From mouth upstream to Gregory Avenue, Passaic. Controlling Depth: 15 feet from the junction of Hackensack and Passaic Rivers to C. R. R. of NJ Bridge; balance of waterway ranges, between 6 and 14 feet. Project Depth: 30, 20, 16 and 10 feet. All at mean low water. Project Length: About 15.4 miles. All Traffic Types (Domestic & Foreign)
Sheet299 PASSAIC RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From mouth upstream to Gregory Avenue, Passaic. Controlling Depth: 15 feet from the junction of Hackensack and Passaic Rivers to C. R. R. of NJ Bridge; balance of waterway ranges, between 6 and 14 feet. Project Depth: 30, 20, 16 and 10 feet. All at mean low water. Project Length: About 15.4 miles. Domestic
Sheet300 PASSAIC RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From mouth upstream to Gregory Avenue, Passaic. Controlling Depth: 15 feet from the junction of Hackensack and Passaic Rivers to C. R. R. of NJ Bridge; balance of waterway ranges, between 6 and 14 feet. Project Depth: 30, 20, 16 and 10 feet. All at mean low water. Project Length: About 15.4 miles. Foreign
Sheet301 PHILADELPHIA HARBOR, PA (INCLUDED IN DELAWARE RIVER BETWEEN PHILADELPHIA, PA AND TRENTON, NJ; DELAWARE RIVER, PHILADELPHIA, PA TO THE SEA AND SCHUYLKILL RIVER, PA)- Section Included: Delaware River from the lower dock at Hog Island, below the mouth of Schuylkill River, to the mouth of Poquessing Creek, the upper limit of the city, 23 miles and Schuylkill River from its mouth to Fairmount Dam, 8.4 miles. For maintained depth see tables of individual referenced projects. All Traffic Types (Domestic & Foreign)
Sheet302 PHILADELPHIA HARBOR, PA (INCLUDED IN DELAWARE RIVER BETWEEN PHILADELPHIA, PA AND TRENTON, NJ; DELAWARE RIVER, PHILADELPHIA, PA TO THE SEA AND SCHUYLKILL RIVER, PA)- Section Included: Delaware River from the lower dock at Hog Island, below the mouth of Schuylkill River, to the mouth of Poquessing Creek, the upper limit of the city, 23 miles and Schuylkill River from its mouth to Fairmount Dam, 8.4 miles. For maintained depth see tables of individual referenced projects. Domestic
Sheet303 PHILADELPHIA HARBOR, PA (INCLUDED IN DELAWARE RIVER BETWEEN PHILADELPHIA, PA AND TRENTON, NJ; DELAWARE RIVER, PHILADELPHIA, PA TO THE SEA AND SCHUYLKILL RIVER, PA)- Section Included: Delaware River from the lower dock at Hog Island, below the mouth of Schuylkill River, to the mouth of Poquessing Creek, the upper limit of the city, 23 miles and Schuylkill River from its mouth to Fairmount Dam, 8.4 miles. For maintained depth see tables of individual referenced projects. Foreign
Sheet304 PLYMOUTH HARBOR, MA (INCLUDING NORTH PLYMOUTH)- Section Included: Within a line running from the northerly tip of Long Beach northwest across to the northerly end of the Plymouth Cordage Company Wharf in North Plymouth; thence southwesterly and southeasterly along the shore of Plymouth to the shore junction of Long Beach; thence northwesterly along Long Beach to its northerly tip. Maintained Depths: 10.5 feet to State Pier; thence 10 feet to Town Wharf. Tidal range to 11 feet mean higher hi gh water. All Traffic Types (Domestic & Foreign)
Sheet305 PLYMOUTH HARBOR, MA (INCLUDING NORTH PLYMOUTH)- Section Included: Within a line running from the northerly tip of Long Beach northwest across to the northerly end of the Plymouth Cordage Company Wharf in North Plymouth; thence southwesterly and southeasterly along the shore of Plymouth to the shore junction of Long Beach; thence northwesterly along Long Beach to its northerly tip. Maintained Depths: 10.5 feet to State Pier; thence 10 feet to Town Wharf. Tidal range to 11 feet mean higher hi gh water. Domestic
Sheet306 PLYMOUTH HARBOR, MA (INCLUDING NORTH PLYMOUTH)- Section Included: Within a line running from the northerly tip of Long Beach northwest across to the northerly end of the Plymouth Cordage Company Wharf in North Plymouth; thence southwesterly and southeasterly along the shore of Plymouth to the shore junction of Long Beach; thence northwesterly along Long Beach to its northerly tip. Maintained Depths: 10.5 feet to State Pier; thence 10 feet to Town Wharf. Tidal range to 11 feet mean higher hi gh water. Foreign
Sheet307 PORT CHESTER HARBOR, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Long Island Sound to a point 100 feet below Mill Street Bridge. Controlling Depth: 10 feet from Long Island Sound to upper limit of 12-foot project; balance of waterway ranges from 1 to 10 feet; 6 feet in anchorage area. Project Depth: 12, 10 and 3 feet; 12 feet in anchorage area. All at mean low water. Project Length: 1.7 miles. All Traffic Types (Domestic & Foreign)
Sheet308 PORT CHESTER HARBOR, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Long Island Sound to a point 100 feet below Mill Street Bridge. Controlling Depth: 10 feet from Long Island Sound to upper limit of 12-foot project; balance of waterway ranges from 1 to 10 feet; 6 feet in anchorage area. Project Depth: 12, 10 and 3 feet; 12 feet in anchorage area. All at mean low water. Project Length: 1.7 miles. Domestic
Sheet309 PORT CHESTER HARBOR, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From Long Island Sound to a point 100 feet below Mill Street Bridge. Controlling Depth: 10 feet from Long Island Sound to upper limit of 12-foot project; balance of waterway ranges from 1 to 10 feet; 6 feet in anchorage area. Project Depth: 12, 10 and 3 feet; 12 feet in anchorage area. All at mean low water. Project Length: 1.7 miles. Foreign
Sheet310 PORT EVERGLADES HARBOR, FL- Section Included: Atlantic Ocean to terminals at Port Everglades, 1.7 miles; section of Intracoastal Waterway, Los Olas Boulevard Bridge, Fort Lauderdale, FL, to Washington Street, Hollywood, FL, 8.7 miles; Dania Cut-Off Canal, 6 miles; and "New River, FL" project, 7.9 miles. Controlling Depth: 45 feet in entrance channel; 42 feet through turning basin to main slip at Port Everglades; 10 feet in Intracoastal Waterway section; 8 feet in New River in 1956, and 6.5  in Dania Cut-Off Canal. Project Depth: 45 feet, Atlantic Ocean to south jetty converging to 42 feet at station 51, thence 42 to 31 feet to and including portions of turning basin at Port Everglades Terminal, and 8 feet in New River. All Traffic Types (Domestic & Foreign)
Sheet311 PORT EVERGLADES HARBOR, FL- Section Included: Atlantic Ocean to terminals at Port Everglades, 1.7 miles; section of Intracoastal Waterway, Los Olas Boulevard Bridge, Fort Lauderdale, FL, to Washington Street, Hollywood, FL, 8.7 miles; Dania Cut-Off Canal, 6 miles; and "New River, FL" project, 7.9 miles. Controlling Depth: 45 feet in entrance channel; 42 feet through turning basin to main slip at Port Everglades; 10 feet in Intracoastal Waterway section; 8 feet in New River in 1956, and 6.5  in Dania Cut-Off Canal. Project Depth: 45 feet, Atlantic Ocean to south jetty converging to 42 feet at station 51, thence 42 to 31 feet to and including portions of turning basin at Port Everglades Terminal, and 8 feet in New River. Domestic
Sheet312 PORT EVERGLADES HARBOR, FL- Section Included: Atlantic Ocean to terminals at Port Everglades, 1.7 miles; section of Intracoastal Waterway, Los Olas Boulevard Bridge, Fort Lauderdale, FL, to Washington Street, Hollywood, FL, 8.7 miles; Dania Cut-Off Canal, 6 miles; and "New River, FL" project, 7.9 miles. Controlling Depth: 45 feet in entrance channel; 42 feet through turning basin to main slip at Port Everglades; 10 feet in Intracoastal Waterway section; 8 feet in New River in 1956, and 6.5  in Dania Cut-Off Canal. Project Depth: 45 feet, Atlantic Ocean to south jetty converging to 42 feet at station 51, thence 42 to 31 feet to and including portions of turning basin at Port Everglades Terminal, and 8 feet in New River. Foreign
Sheet313 PORT JEFFERSON HARBOR, NY- Section Included: From deep water in Long Island Sound to Port Jefferson Harbor, thence to village of Port Jefferson. Controlling Depth: 27 feet, turning basin 11 feet. Project Depth: 40 feet in entrance channel, 30 feet in turning basin, all at mean low water. Project Length: 2.3 miles. All Traffic Types (Domestic & Foreign)
Sheet314 PORT JEFFERSON HARBOR, NY- Section Included: From deep water in Long Island Sound to Port Jefferson Harbor, thence to village of Port Jefferson. Controlling Depth: 27 feet, turning basin 11 feet. Project Depth: 40 feet in entrance channel, 30 feet in turning basin, all at mean low water. Project Length: 2.3 miles. Domestic
Sheet315 PORT JEFFERSON HARBOR, NY- Section Included: From deep water in Long Island Sound to Port Jefferson Harbor, thence to village of Port Jefferson. Controlling Depth: 27 feet, turning basin 11 feet. Project Depth: 40 feet in entrance channel, 30 feet in turning basin, all at mean low water. Project Length: 2.3 miles. Foreign
Sheet316 PORT OF ALBANY, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: From the southerly end of Cabbage Island or Island Creek to the northerly limits of the cities of Rensselaer and Albany. Controlling Depth: 32 feet mean low water from the southerly end of Cabbage Island to 4,500 feet south of north limit of 32-foot project; thence 27 feet to north limit of 32-foot project; thence 14 feet to Waterford. Project Depth: 34 feet in rock and 32 feet in soft material to a point abou t 2,200 feet south of Dunn Memorial Bridge; thence 27 feet deep and 400 feet wide to 900 feet south of the Mall Dunn Bridge; thence 14 feet to Waterford. All at mean low water except from Albany to Troy Lock and Dam which is at lowest low water. Navigation Season: For barges, 8 months; for oceangoing vessels, 12 months. All Traffic Types (Domestic & Foreign)
Sheet317 PORT OF ALBANY, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: From the southerly end of Cabbage Island or Island Creek to the northerly limits of the cities of Rensselaer and Albany. Controlling Depth: 32 feet mean low water from the southerly end of Cabbage Island to 4,500 feet south of north limit of 32-foot project; thence 27 feet to north limit of 32-foot project; thence 14 feet to Waterford. Project Depth: 34 feet in rock and 32 feet in soft material to a point abou t 2,200 feet south of Dunn Memorial Bridge; thence 27 feet deep and 400 feet wide to 900 feet south of the Mall Dunn Bridge; thence 14 feet to Waterford. All at mean low water except from Albany to Troy Lock and Dam which is at lowest low water. Navigation Season: For barges, 8 months; for oceangoing vessels, 12 months. Domestic
Sheet318 PORT OF ALBANY, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: From the southerly end of Cabbage Island or Island Creek to the northerly limits of the cities of Rensselaer and Albany. Controlling Depth: 32 feet mean low water from the southerly end of Cabbage Island to 4,500 feet south of north limit of 32-foot project; thence 27 feet to north limit of 32-foot project; thence 14 feet to Waterford. Project Depth: 34 feet in rock and 32 feet in soft material to a point abou t 2,200 feet south of Dunn Memorial Bridge; thence 27 feet deep and 400 feet wide to 900 feet south of the Mall Dunn Bridge; thence 14 feet to Waterford. All at mean low water except from Albany to Troy Lock and Dam which is at lowest low water. Navigation Season: For barges, 8 months; for oceangoing vessels, 12 months. Foreign
Sheet319 PORT OF BOSTON, MA- Section Included: Boston Harbor, including all the tidewater lying within a line from Point Allerton to Point Shirley, and extending westward to the mainland, comprising an area of approximately 47 square miles. Controlling Depth: Main Ship Channel to opposite Pier 49, 36.1 feet. Other channels range from 15 to 40 feet. President Roads Anchorage, 38.1 feet. Project Depth: A channel 40 feet deep in general, but 45 feet through rock 900 feet wide, widening at the outer  end to 1,100 feet from the sea to President Roads, through Broad Sound. Other channels range from 12 to 40 feet. All Traffic Types (Domestic & Foreign)
Sheet320 PORT OF BOSTON, MA- Section Included: Boston Harbor, including all the tidewater lying within a line from Point Allerton to Point Shirley, and extending westward to the mainland, comprising an area of approximately 47 square miles. Controlling Depth: Main Ship Channel to opposite Pier 49, 36.1 feet. Other channels range from 15 to 40 feet. President Roads Anchorage, 38.1 feet. Project Depth: A channel 40 feet deep in general, but 45 feet through rock 900 feet wide, widening at the outer  end to 1,100 feet from the sea to President Roads, through Broad Sound. Other channels range from 12 to 40 feet. Domestic
Sheet321 PORT OF BOSTON, MA- Section Included: Boston Harbor, including all the tidewater lying within a line from Point Allerton to Point Shirley, and extending westward to the mainland, comprising an area of approximately 47 square miles. Controlling Depth: Main Ship Channel to opposite Pier 49, 36.1 feet. Other channels range from 15 to 40 feet. President Roads Anchorage, 38.1 feet. Project Depth: A channel 40 feet deep in general, but 45 feet through rock 900 feet wide, widening at the outer  end to 1,100 feet from the sea to President Roads, through Broad Sound. Other channels range from 12 to 40 feet. Foreign
Sheet322 PORT OF HOPEWELL, VA (INCLUDED IN JAMES RIVER VA CONSOLIDATED REPORT)- Section Included: South side of James River, from City Point, at mouth of Appomattox River, 2 miles downstream to the mouth of Baileys Creek. Maintained Depth: 25 feet at mean low water. Tidal range to 3 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet323 PORT OF HOPEWELL, VA (INCLUDED IN JAMES RIVER VA CONSOLIDATED REPORT)- Section Included: South side of James River, from City Point, at mouth of Appomattox River, 2 miles downstream to the mouth of Baileys Creek. Maintained Depth: 25 feet at mean low water. Tidal range to 3 feet mean higher high water. Domestic
Sheet324 PORT OF HOPEWELL, VA (INCLUDED IN JAMES RIVER VA CONSOLIDATED REPORT)- Section Included: South side of James River, from City Point, at mouth of Appomattox River, 2 miles downstream to the mouth of Baileys Creek. Maintained Depth: 25 feet at mean low water. Tidal range to 3 feet mean higher high water. Foreign
Sheet325 PORT OF NEWPORT NEWS, VA (INCLUDING NEWPORT NEWS CREEK, VA)- Section Included: Lower east shore of James River from mouth to 1.8 miles, and portion of north shore of Hampton Roads covering approximately 15,000 linear feet of waterfront at Newport News; and Newport News Creek. Tidal range to 3 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet326 PORT OF NEWPORT NEWS, VA (INCLUDING NEWPORT NEWS CREEK, VA)- Section Included: Lower east shore of James River from mouth to 1.8 miles, and portion of north shore of Hampton Roads covering approximately 15,000 linear feet of waterfront at Newport News; and Newport News Creek. Tidal range to 3 feet mean higher high water. Domestic
Sheet327 PORT OF NEWPORT NEWS, VA (INCLUDING NEWPORT NEWS CREEK, VA)- Section Included: Lower east shore of James River from mouth to 1.8 miles, and portion of north shore of Hampton Roads covering approximately 15,000 linear feet of waterfront at Newport News; and Newport News Creek. Tidal range to 3 feet mean higher high water. Foreign
Sheet328 PORT OF RICHMOND, VA (INCLUDED IN JAMES RIVER, VA CONSOLIDATED REPORT)- All Traffic Types (Domestic & Foreign)
Sheet329 PORT OF RICHMOND, VA (INCLUDED IN JAMES RIVER, VA CONSOLIDATED REPORT)- Domestic
Sheet330 PORT OF RICHMOND, VA (INCLUDED IN JAMES RIVER, VA CONSOLIDATED REPORT)- Foreign
Sheet331 PORT OF WILMINGTON, NC (INCLUDED IN WILMINGTON HARBOR, NC)- Section Included: Both banks of the Cape Fear River extending from a point about 18 miles below the foot of Castle St. in Wilmington to a point about 2 miles above the Railroad Bridge at Navassa, and both banks of Northeast (Cape Fear) River from its mouth to a point about 1.67 miles above the Hilton Railroad Bridge. All Traffic Types (Domestic & Foreign)
Sheet332 PORT OF WILMINGTON, NC (INCLUDED IN WILMINGTON HARBOR, NC)- Section Included: Both banks of the Cape Fear River extending from a point about 18 miles below the foot of Castle St. in Wilmington to a point about 2 miles above the Railroad Bridge at Navassa, and both banks of Northeast (Cape Fear) River from its mouth to a point about 1.67 miles above the Hilton Railroad Bridge. Domestic
Sheet333 PORT OF WILMINGTON, NC (INCLUDED IN WILMINGTON HARBOR, NC)- Section Included: Both banks of the Cape Fear River extending from a point about 18 miles below the foot of Castle St. in Wilmington to a point about 2 miles above the Railroad Bridge at Navassa, and both banks of Northeast (Cape Fear) River from its mouth to a point about 1.67 miles above the Hilton Railroad Bridge. Foreign
Sheet334 PORT ROYAL HARBOR, SC- All Traffic Types (Domestic & Foreign)
Sheet335 PORT ROYAL HARBOR, SC- Domestic
Sheet336 PORT ROYAL HARBOR, SC- Foreign
Sheet337 PORTLAND HARBOR, ME- Section Included: Northern limit from the mouth of the Presumpscot River on the west to the northern extremity of Great Diamond Island on the east; and the southern limit from Portland Head Light to the southern extremity of Cushing Island across the Main Ship Channel.Included within this area are the waterfronts of Portland, South Portland and Back Cove. Controlling Depth: 45 feet from the sea to the limit of the 45-foot channel; 44.8 feet in Main Ship Channel; 44.0 fe et in 45-foot House Island anchorage; 33.5 feet in middle half of channel to Portland Bridge, thence 33.8 feet to upstream limit in the 35-foot Fore River Channel; 27 feet in 30 foot anchorage with shoaling to 24.2 feet in northeastern portion. Project Depth: 45 feet from open ocean to Portland Pipeline Corp. Terminal; 45 foot anchorage northwest of House Island; 30 foot anchorage off Fish Point, 35 feet in Fore River Channel; all at mean low water. All Traffic Types (Domestic & Foreign)
Sheet338 PORTLAND HARBOR, ME- Section Included: Northern limit from the mouth of the Presumpscot River on the west to the northern extremity of Great Diamond Island on the east; and the southern limit from Portland Head Light to the southern extremity of Cushing Island across the Main Ship Channel.Included within this area are the waterfronts of Portland, South Portland and Back Cove. Controlling Depth: 45 feet from the sea to the limit of the 45-foot channel; 44.8 feet in Main Ship Channel; 44.0 fe et in 45-foot House Island anchorage; 33.5 feet in middle half of channel to Portland Bridge, thence 33.8 feet to upstream limit in the 35-foot Fore River Channel; 27 feet in 30 foot anchorage with shoaling to 24.2 feet in northeastern portion. Project Depth: 45 feet from open ocean to Portland Pipeline Corp. Terminal; 45 foot anchorage northwest of House Island; 30 foot anchorage off Fish Point, 35 feet in Fore River Channel; all at mean low water. Domestic
Sheet339 PORTLAND HARBOR, ME- Section Included: Northern limit from the mouth of the Presumpscot River on the west to the northern extremity of Great Diamond Island on the east; and the southern limit from Portland Head Light to the southern extremity of Cushing Island across the Main Ship Channel.Included within this area are the waterfronts of Portland, South Portland and Back Cove. Controlling Depth: 45 feet from the sea to the limit of the 45-foot channel; 44.8 feet in Main Ship Channel; 44.0 fe et in 45-foot House Island anchorage; 33.5 feet in middle half of channel to Portland Bridge, thence 33.8 feet to upstream limit in the 35-foot Fore River Channel; 27 feet in 30 foot anchorage with shoaling to 24.2 feet in northeastern portion. Project Depth: 45 feet from open ocean to Portland Pipeline Corp. Terminal; 45 foot anchorage northwest of House Island; 30 foot anchorage off Fish Point, 35 feet in Fore River Channel; all at mean low water. Foreign
Sheet340 PORTSMOUTH HARBOR, NH- Section Included: From Mouth to Newington, NH, on the west bank of the Piscataqua River. Controlling Depth: Middle half of channel 33.2 feet to upstream limit. Project Depth: 35 feet at mean low water over ledges. All Traffic Types (Domestic & Foreign)
Sheet341 PORTSMOUTH HARBOR, NH- Section Included: From Mouth to Newington, NH, on the west bank of the Piscataqua River. Controlling Depth: Middle half of channel 33.2 feet to upstream limit. Project Depth: 35 feet at mean low water over ledges. Domestic
Sheet342 PORTSMOUTH HARBOR, NH- Section Included: From Mouth to Newington, NH, on the west bank of the Piscataqua River. Controlling Depth: Middle half of channel 33.2 feet to upstream limit. Project Depth: 35 feet at mean low water over ledges. Foreign
Sheet343 POTOMAC RIVER AT ALEXANDRIA, VA- Section Included: The project provides for a depth of 24 feet in front of Alexandria, between the through channel and a line drawn 20 feet channelward of the established pierhead line, (averages 300 feet wide). The project length is 6,700 feet. Controlling Depth: 17.6 feet. All Traffic Types (Domestic & Foreign)
Sheet344 POTOMAC RIVER AT ALEXANDRIA, VA- Section Included: The project provides for a depth of 24 feet in front of Alexandria, between the through channel and a line drawn 20 feet channelward of the established pierhead line, (averages 300 feet wide). The project length is 6,700 feet. Controlling Depth: 17.6 feet. Domestic
Sheet345 POTOMAC RIVER AT ALEXANDRIA, VA- Section Included: The project provides for a depth of 24 feet in front of Alexandria, between the through channel and a line drawn 20 feet channelward of the established pierhead line, (averages 300 feet wide). The project length is 6,700 feet. Controlling Depth: 17.6 feet. Foreign
Sheet346 POTOMAC RIVER, VIRGINIA CHANNEL, DC (INCLUDED IN WASHINGTON HARBOR, DC)- Section Included: Giesboro Point to Key Bridge, 4.7 miles. Controlling Depth: 11.4 feet to Key Bridge. Project Depth: 24 feet. All Traffic Types (Domestic & Foreign)
Sheet347 POTOMAC RIVER, VIRGINIA CHANNEL, DC (INCLUDED IN WASHINGTON HARBOR, DC)- Section Included: Giesboro Point to Key Bridge, 4.7 miles. Controlling Depth: 11.4 feet to Key Bridge. Project Depth: 24 feet. Domestic
Sheet348 POTOMAC RIVER, VIRGINIA CHANNEL, DC (INCLUDED IN WASHINGTON HARBOR, DC)- Section Included: Giesboro Point to Key Bridge, 4.7 miles. Controlling Depth: 11.4 feet to Key Bridge. Project Depth: 24 feet. Foreign
Sheet349 POTOMAC RIVER, WASHINGTON CHANNEL, DC (INCLUDED IN REPORT FOR WASHINGTON HARBOR, DC)- All Traffic Types (Domestic & Foreign)
Sheet350 POTOMAC RIVER, WASHINGTON CHANNEL, DC (INCLUDED IN REPORT FOR WASHINGTON HARBOR, DC)- Domestic
Sheet351 POTOMAC RIVER, WASHINGTON CHANNEL, DC (INCLUDED IN REPORT FOR WASHINGTON HARBOR, DC)- Foreign
Sheet352 PROVIDENCE RIVER AND HARBOR, RI- Section Included: South of Prudence Light to Fox Point. Controlling Depth: 35.4 feet in the 40-foot channel from abreast North Point to Sabin Point Light; thence 30.3 feet from Sabin Point to head of harbor. Project Depth: At mean low water, 40 feet to Fox Point. All Traffic Types (Domestic & Foreign)
Sheet353 PROVIDENCE RIVER AND HARBOR, RI- Section Included: South of Prudence Light to Fox Point. Controlling Depth: 35.4 feet in the 40-foot channel from abreast North Point to Sabin Point Light; thence 30.3 feet from Sabin Point to head of harbor. Project Depth: At mean low water, 40 feet to Fox Point. Domestic
Sheet354 PROVIDENCE RIVER AND HARBOR, RI- Section Included: South of Prudence Light to Fox Point. Controlling Depth: 35.4 feet in the 40-foot channel from abreast North Point to Sabin Point Light; thence 30.3 feet from Sabin Point to head of harbor. Project Depth: At mean low water, 40 feet to Fox Point. Foreign
Sheet355 PROVINCETOWN HARBOR, MA- All Traffic Types (Domestic & Foreign)
Sheet356 PROVINCETOWN HARBOR, MA- Domestic
Sheet357 PROVINCETOWN HARBOR, MA- Foreign
Sheet358 RARITAN RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Raritan Bay to New Brunswick. Maintained Depth: Main Channel, 18 to 21 feet from NY and NJ Channels to junction of South Channel; balance of waterway ranges from 1 to 25 feet. Project Length: 13.8 miles. Tidal range to 6 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet359 RARITAN RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Raritan Bay to New Brunswick. Maintained Depth: Main Channel, 18 to 21 feet from NY and NJ Channels to junction of South Channel; balance of waterway ranges from 1 to 25 feet. Project Length: 13.8 miles. Tidal range to 6 feet mean higher high water. Domestic
Sheet360 RARITAN RIVER, NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From deep water in Raritan Bay to New Brunswick. Maintained Depth: Main Channel, 18 to 21 feet from NY and NJ Channels to junction of South Channel; balance of waterway ranges from 1 to 25 feet. Project Length: 13.8 miles. Tidal range to 6 feet mean higher high water. Foreign
Sheet361 ROCKLAND HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet362 ROCKLAND HARBOR, ME- Domestic
Sheet363 ROCKLAND HARBOR, ME- Foreign
Sheet364 RONDOUT HARBOR, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: Hudson River to West End of Island Dock. Controlling Depth: 14 feet from deep water in Hudson River to Highway Bridge, thence 10 feet to west end of Island Dock. Project Depth: 14 and 12 feet. All at mean low water. Project Length: 1.8 miles. Navigation Season: 9 months of the year. All Traffic Types (Domestic & Foreign)
Sheet365 RONDOUT HARBOR, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: Hudson River to West End of Island Dock. Controlling Depth: 14 feet from deep water in Hudson River to Highway Bridge, thence 10 feet to west end of Island Dock. Project Depth: 14 and 12 feet. All at mean low water. Project Length: 1.8 miles. Navigation Season: 9 months of the year. Domestic
Sheet366 RONDOUT HARBOR, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: Hudson River to West End of Island Dock. Controlling Depth: 14 feet from deep water in Hudson River to Highway Bridge, thence 10 feet to west end of Island Dock. Project Depth: 14 and 12 feet. All at mean low water. Project Length: 1.8 miles. Navigation Season: 9 months of the year. Foreign
Sheet367 SAG HARBOR, NY- All Traffic Types (Domestic & Foreign)
Sheet368 SAG HARBOR, NY- Domestic
Sheet369 SAG HARBOR, NY- Foreign
Sheet370 SALEM HARBOR, MA- Section Included: Westerly shore of harbor. Controlling Depth: 30 feet at mean low water in the 32-foot channel. Project Depth: Main channel 32 feet at mean low water. All Traffic Types (Domestic & Foreign)
Sheet371 SALEM HARBOR, MA- Section Included: Westerly shore of harbor. Controlling Depth: 30 feet at mean low water in the 32-foot channel. Project Depth: Main channel 32 feet at mean low water. Domestic
Sheet372 SALEM HARBOR, MA- Section Included: Westerly shore of harbor. Controlling Depth: 30 feet at mean low water in the 32-foot channel. Project Depth: Main channel 32 feet at mean low water. Foreign
Sheet373 SANDY HOOK BAY AT LEONARDO, NJ (INCLUDED IN PORT OF NEW YORK)- All Traffic Types (Domestic & Foreign)
Sheet374 SANDY HOOK BAY AT LEONARDO, NJ (INCLUDED IN PORT OF NEW YORK)- Domestic
Sheet375 SANDY HOOK BAY AT LEONARDO, NJ (INCLUDED IN PORT OF NEW YORK)- Foreign
Sheet376 SANDY HOOK BAY, NJ (INCLUDED IN PORT OF NEW YORK)- All Traffic Types (Domestic & Foreign)
Sheet377 SANDY HOOK BAY, NJ (INCLUDED IN PORT OF NEW YORK)- Domestic
Sheet378 SANDY HOOK BAY, NJ (INCLUDED IN PORT OF NEW YORK)- Foreign
Sheet379 SANDY HOOK BAY, NJ- All Traffic Types (Domestic & Foreign)
Sheet380 SANDY HOOK BAY, NJ- Domestic
Sheet381 SANDY HOOK BAY, NJ- Foreign
Sheet382 SAVANNAH HARBOR, GA- Section Included: Entrance channel 44 feet deep across ocean bar to the Port Wentworth Channel, length of project 31.1 miles. Maintained Depth: For mid-channel, half project width, 44 feet over the Bar Channel; thence 44 feet to the Georgia Ports City Terminal; thence 36 feet to the Savannah Sugar Refinery terminal; and to a point below the Atlantic Coastal Highway Houlihan Bridge. Tidal range to 8 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet383 SAVANNAH HARBOR, GA- Section Included: Entrance channel 44 feet deep across ocean bar to the Port Wentworth Channel, length of project 31.1 miles. Maintained Depth: For mid-channel, half project width, 44 feet over the Bar Channel; thence 44 feet to the Georgia Ports City Terminal; thence 36 feet to the Savannah Sugar Refinery terminal; and to a point below the Atlantic Coastal Highway Houlihan Bridge. Tidal range to 8 feet mean higher high water. Domestic
Sheet384 SAVANNAH HARBOR, GA- Section Included: Entrance channel 44 feet deep across ocean bar to the Port Wentworth Channel, length of project 31.1 miles. Maintained Depth: For mid-channel, half project width, 44 feet over the Bar Channel; thence 44 feet to the Georgia Ports City Terminal; thence 36 feet to the Savannah Sugar Refinery terminal; and to a point below the Atlantic Coastal Highway Houlihan Bridge. Tidal range to 8 feet mean higher high water. Foreign
Sheet385 SCHUYLKILL RIVER, PA (INCLUDED IN PHILADELPHIA HARBOR,PA)- Section Included: Delaware River to University Avenue Bridge, Philadelphia, 6.5 miles. Controlling Depth: In middle half of channel Nov. 1989, 23.1 feet to upper end of Berth #1, Arco Ballast Wharf, Nov. 1989, 16.3 feet to Passyunk Avenue Bridge, (minimun depth in right outside quarter 30.8 feet), 4 miles; thence in Oct. 1989, 14.9 feet to Gibson Point, 1 mile; thence in Oct. 1989, 9.2 feet to University Avenue Bridge; 1.5 miles. Pr oject Depth: 33 feet to Passyunk Avenue Bridge; thence 26 feet to Gibson Point; and thence 22 feet to University Avenue Bridge. All Traffic Types (Domestic & Foreign)
Sheet386 SCHUYLKILL RIVER, PA (INCLUDED IN PHILADELPHIA HARBOR,PA)- Section Included: Delaware River to University Avenue Bridge, Philadelphia, 6.5 miles. Controlling Depth: In middle half of channel Nov. 1989, 23.1 feet to upper end of Berth #1, Arco Ballast Wharf, Nov. 1989, 16.3 feet to Passyunk Avenue Bridge, (minimun depth in right outside quarter 30.8 feet), 4 miles; thence in Oct. 1989, 14.9 feet to Gibson Point, 1 mile; thence in Oct. 1989, 9.2 feet to University Avenue Bridge; 1.5 miles. Pr oject Depth: 33 feet to Passyunk Avenue Bridge; thence 26 feet to Gibson Point; and thence 22 feet to University Avenue Bridge. Domestic
Sheet387 SCHUYLKILL RIVER, PA (INCLUDED IN PHILADELPHIA HARBOR,PA)- Section Included: Delaware River to University Avenue Bridge, Philadelphia, 6.5 miles. Controlling Depth: In middle half of channel Nov. 1989, 23.1 feet to upper end of Berth #1, Arco Ballast Wharf, Nov. 1989, 16.3 feet to Passyunk Avenue Bridge, (minimun depth in right outside quarter 30.8 feet), 4 miles; thence in Oct. 1989, 14.9 feet to Gibson Point, 1 mile; thence in Oct. 1989, 9.2 feet to University Avenue Bridge; 1.5 miles. Pr oject Depth: 33 feet to Passyunk Avenue Bridge; thence 26 feet to Gibson Point; and thence 22 feet to University Avenue Bridge. Foreign
Sheet388 SEARSPORT HARBOR, ME- Section Included: Access Channel leading to turning basin and turning basin off piers at Mack Point. Controlling Depth: 34 feet in 35 foot Access Channel; 35 feet in 35 foot turning basin. Project Depth: 35 feet, all at mean low water. All Traffic Types (Domestic & Foreign)
Sheet389 SEARSPORT HARBOR, ME- Section Included: Access Channel leading to turning basin and turning basin off piers at Mack Point. Controlling Depth: 34 feet in 35 foot Access Channel; 35 feet in 35 foot turning basin. Project Depth: 35 feet, all at mean low water. Domestic
Sheet390 SEARSPORT HARBOR, ME- Section Included: Access Channel leading to turning basin and turning basin off piers at Mack Point. Controlling Depth: 34 feet in 35 foot Access Channel; 35 feet in 35 foot turning basin. Project Depth: 35 feet, all at mean low water. Foreign
Sheet391 SHIPYARD RIVER, SC (INCLUDED IN CHARLESTON HARBOR, SC)- All Traffic Types (Domestic & Foreign)
Sheet392 SHIPYARD RIVER, SC (INCLUDED IN CHARLESTON HARBOR, SC)- Domestic
Sheet393 SHIPYARD RIVER, SC (INCLUDED IN CHARLESTON HARBOR, SC)- Foreign
Sheet394 SHOAL HARBOR AND COMPTON CREEK, NJ (INCLUDED IN PORT OF NEW YORK)- All Traffic Types (Domestic & Foreign)
Sheet395 SHOAL HARBOR AND COMPTON CREEK, NJ (INCLUDED IN PORT OF NEW YORK)- Domestic
Sheet396 SHOAL HARBOR AND COMPTON CREEK, NJ (INCLUDED IN PORT OF NEW YORK)- Foreign
Sheet397 SOUTHWEST HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet398 SOUTHWEST HARBOR, ME- Domestic
Sheet399 SOUTHWEST HARBOR, ME- Foreign
Sheet400 ST. AUGUSTINE HARBOR, FL- All Traffic Types (Domestic & Foreign)
Sheet401 ST. AUGUSTINE HARBOR, FL- Domestic
Sheet402 ST. AUGUSTINE HARBOR, FL- Foreign
Sheet403 STAMFORD HARBOR, CT- Section Included: From about 600 feet below outer breakwaters to the head of navigation in the East and West Branches. Controlling Depth: 17 feet in the 18-foot entrance channel; 14.8 feet in the center half of the 15-foot entrance channel; 10 feet in the 12-foot East Branch Channel to 2,000 feet downstream of the head of navigation, and 12.8 feet in center half of West Branch Channel. Project Depth: 18.0 feet in entrance channel to north end of 18-foot anchorage; the nce 15 feet in remainder of entrance channel,West Branch Channel and basin, 12 feet in East Branch Channel, at mean low water. All Traffic Types (Domestic & Foreign)
Sheet404 STAMFORD HARBOR, CT- Section Included: From about 600 feet below outer breakwaters to the head of navigation in the East and West Branches. Controlling Depth: 17 feet in the 18-foot entrance channel; 14.8 feet in the center half of the 15-foot entrance channel; 10 feet in the 12-foot East Branch Channel to 2,000 feet downstream of the head of navigation, and 12.8 feet in center half of West Branch Channel. Project Depth: 18.0 feet in entrance channel to north end of 18-foot anchorage; the nce 15 feet in remainder of entrance channel,West Branch Channel and basin, 12 feet in East Branch Channel, at mean low water. Domestic
Sheet405 STAMFORD HARBOR, CT- Section Included: From about 600 feet below outer breakwaters to the head of navigation in the East and West Branches. Controlling Depth: 17 feet in the 18-foot entrance channel; 14.8 feet in the center half of the 15-foot entrance channel; 10 feet in the 12-foot East Branch Channel to 2,000 feet downstream of the head of navigation, and 12.8 feet in center half of West Branch Channel. Project Depth: 18.0 feet in entrance channel to north end of 18-foot anchorage; the nce 15 feet in remainder of entrance channel,West Branch Channel and basin, 12 feet in East Branch Channel, at mean low water. Foreign
Sheet406 STONINGTON HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet407 STONINGTON HARBOR, ME- Domestic
Sheet408 STONINGTON HARBOR, ME- Foreign
Sheet409 TARRYTOWN HARBOR, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: A channel along the wharf front; and northerly and southerly connecting channels to deep water in the Hudson River. Controlling Depth: 9 feet in north branch and 8 feet along wharf front and 7 feet in south branch. Project Depth: 12 feet. All at mean low water. Project Length: 1 mile. Navigation Season: 10 months of the year. All Traffic Types (Domestic & Foreign)
Sheet410 TARRYTOWN HARBOR, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: A channel along the wharf front; and northerly and southerly connecting channels to deep water in the Hudson River. Controlling Depth: 9 feet in north branch and 8 feet along wharf front and 7 feet in south branch. Project Depth: 12 feet. All at mean low water. Project Length: 1 mile. Navigation Season: 10 months of the year. Domestic
Sheet411 TARRYTOWN HARBOR, NY (INCLUDED IN STATISTICS FOR HUDSON RIVER)- Section Included: A channel along the wharf front; and northerly and southerly connecting channels to deep water in the Hudson River. Controlling Depth: 9 feet in north branch and 8 feet along wharf front and 7 feet in south branch. Project Depth: 12 feet. All at mean low water. Project Length: 1 mile. Navigation Season: 10 months of the year. Foreign
Sheet412 TENANTS HARBOR, ME- All Traffic Types (Domestic & Foreign)
Sheet413 TENANTS HARBOR, ME- Domestic
Sheet414 TENANTS HARBOR, ME- Foreign
Sheet415 TOWN RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From confluence with Weymouth Fore River, for about 1.5 miles to head of navigation. Controlling Depth: 32 feet in the 35 foot channel: 34.2 feet in the 35 foot turning basin; and 7.6 feet above turning basin. Project Depth: 35 feet at mean low water from Weymouth Fore River to Quincy Oil Company Terminal, with a turning basin of 35 feet depth; thence 15 feet to just below Quincy Light & Power Company Plant. All Traffic Types (Domestic & Foreign)
Sheet416 TOWN RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From confluence with Weymouth Fore River, for about 1.5 miles to head of navigation. Controlling Depth: 32 feet in the 35 foot channel: 34.2 feet in the 35 foot turning basin; and 7.6 feet above turning basin. Project Depth: 35 feet at mean low water from Weymouth Fore River to Quincy Oil Company Terminal, with a turning basin of 35 feet depth; thence 15 feet to just below Quincy Light & Power Company Plant. Domestic
Sheet417 TOWN RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From confluence with Weymouth Fore River, for about 1.5 miles to head of navigation. Controlling Depth: 32 feet in the 35 foot channel: 34.2 feet in the 35 foot turning basin; and 7.6 feet above turning basin. Project Depth: 35 feet at mean low water from Weymouth Fore River to Quincy Oil Company Terminal, with a turning basin of 35 feet depth; thence 15 feet to just below Quincy Light & Power Company Plant. Foreign
Sheet418 TRENTON HARBOR, NJ (INCLUDED IN DELAWARE RIVER BETWEEN PHILADELPHIA,PA AND TRENTON,NJ)- Section Included: Oil terminals at Duck Island to Ferry Street, Trenton, NJ, 3.4 miles. Controlling Depth: In middle half of channel: Duck Island to Trenton Marine Terminal, in July 1988, 11.4 feet, and thence to Pennsylvania R. R. Bridge at Trenton in July 1988, 10.7 feet. Project Depth: Duck Island to Trenton Marine Terminal 25 feet authorized but deferred; thence to Pennsylvania R.R. bridge, 12 fee t. All Traffic Types (Domestic & Foreign)
Sheet419 TRENTON HARBOR, NJ (INCLUDED IN DELAWARE RIVER BETWEEN PHILADELPHIA,PA AND TRENTON,NJ)- Section Included: Oil terminals at Duck Island to Ferry Street, Trenton, NJ, 3.4 miles. Controlling Depth: In middle half of channel: Duck Island to Trenton Marine Terminal, in July 1988, 11.4 feet, and thence to Pennsylvania R. R. Bridge at Trenton in July 1988, 10.7 feet. Project Depth: Duck Island to Trenton Marine Terminal 25 feet authorized but deferred; thence to Pennsylvania R.R. bridge, 12 fee t. Domestic
Sheet420 TRENTON HARBOR, NJ (INCLUDED IN DELAWARE RIVER BETWEEN PHILADELPHIA,PA AND TRENTON,NJ)- Section Included: Oil terminals at Duck Island to Ferry Street, Trenton, NJ, 3.4 miles. Controlling Depth: In middle half of channel: Duck Island to Trenton Marine Terminal, in July 1988, 11.4 feet, and thence to Pennsylvania R. R. Bridge at Trenton in July 1988, 10.7 feet. Project Depth: Duck Island to Trenton Marine Terminal 25 feet authorized but deferred; thence to Pennsylvania R.R. bridge, 12 fee t. Foreign
Sheet421 UPPER BAY, NEW YORK HARBOR, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From the Narrows to junction of Hudson and East River. Maintained Depth: Anchorage Channel 45 feet; channel along NJ. Pierhead line 19.5 feet; Red Hook Flats Anchorage, 35 feet and 45 feet; Liberty Island Anchorage 20 feet: Project Length: 5.7 miles; channel along New Jersey Pierhead line, 3 miles. Tidal range to 5 feet mean higher high water. All Traffic Types (Domestic & Foreign)
Sheet422 UPPER BAY, NEW YORK HARBOR, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From the Narrows to junction of Hudson and East River. Maintained Depth: Anchorage Channel 45 feet; channel along NJ. Pierhead line 19.5 feet; Red Hook Flats Anchorage, 35 feet and 45 feet; Liberty Island Anchorage 20 feet: Project Length: 5.7 miles; channel along New Jersey Pierhead line, 3 miles. Tidal range to 5 feet mean higher high water. Domestic
Sheet423 UPPER BAY, NEW YORK HARBOR, NY AND NJ (INCLUDED IN PORT OF NEW YORK)- Section Included: From the Narrows to junction of Hudson and East River. Maintained Depth: Anchorage Channel 45 feet; channel along NJ. Pierhead line 19.5 feet; Red Hook Flats Anchorage, 35 feet and 45 feet; Liberty Island Anchorage 20 feet: Project Length: 5.7 miles; channel along New Jersey Pierhead line, 3 miles. Tidal range to 5 feet mean higher high water. Foreign
Sheet424 VINEYARD HAVEN HARBOR, MA- Section Included: Harbor area inside of the breakwater. Controlling Depth: All 17 feet in Fairway, 11.4 in Anchorage. Project Depth: 17 feet in Fairway and 12 feet in Anchorage. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet425 VINEYARD HAVEN HARBOR, MA- Section Included: Harbor area inside of the breakwater. Controlling Depth: All 17 feet in Fairway, 11.4 in Anchorage. Project Depth: 17 feet in Fairway and 12 feet in Anchorage. All at mean low water. Domestic
Sheet426 VINEYARD HAVEN HARBOR, MA- Section Included: Harbor area inside of the breakwater. Controlling Depth: All 17 feet in Fairway, 11.4 in Anchorage. Project Depth: 17 feet in Fairway and 12 feet in Anchorage. All at mean low water. Foreign
Sheet427 WANCHESE HARBOR, NC (INCLUDED IN MANTEO) (SHALLOWBAG BAY, NC)- All Traffic Types (Domestic & Foreign)
Sheet428 WANCHESE HARBOR, NC (INCLUDED IN MANTEO) (SHALLOWBAG BAY, NC)- Domestic
Sheet429 WANCHESE HARBOR, NC (INCLUDED IN MANTEO) (SHALLOWBAG BAY, NC)- Foreign
Sheet430 WARWICK COVE, WARWICK, RI- All Traffic Types (Domestic & Foreign)
Sheet431 WARWICK COVE, WARWICK, RI- Domestic
Sheet432 WARWICK COVE, WARWICK, RI- Foreign
Sheet433 WASHINGTON HARBOR, DC- Section Included: Anacostia River, Washington Channel and Virginia Channel. Controlling Depth: 17 feet at Haines Point, Anacostia River, 14.4 feet from mouth to 11th Street, balance of river ranges from 6 to 20 feet; Washington Channel, 17 feet from Haines Point to 7th Street, 17 feet to 12th Street; Virginia, 11.4 feet from Giesboro Point to Key Bridge. Project Depth: 24 feet. All Traffic Types (Domestic & Foreign)
Sheet434 WASHINGTON HARBOR, DC- Section Included: Anacostia River, Washington Channel and Virginia Channel. Controlling Depth: 17 feet at Haines Point, Anacostia River, 14.4 feet from mouth to 11th Street, balance of river ranges from 6 to 20 feet; Washington Channel, 17 feet from Haines Point to 7th Street, 17 feet to 12th Street; Virginia, 11.4 feet from Giesboro Point to Key Bridge. Project Depth: 24 feet. Domestic
Sheet435 WASHINGTON HARBOR, DC- Section Included: Anacostia River, Washington Channel and Virginia Channel. Controlling Depth: 17 feet at Haines Point, Anacostia River, 14.4 feet from mouth to 11th Street, balance of river ranges from 6 to 20 feet; Washington Channel, 17 feet from Haines Point to 7th Street, 17 feet to 12th Street; Virginia, 11.4 feet from Giesboro Point to Key Bridge. Project Depth: 24 feet. Foreign
Sheet436 WESTCHESTER CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to East Tremont Avenue Bridge. Controlling Depth: 12 feet from East River to upstream limit project. Project Depth: 12 feet in channel and turning basin. All at mean low water. Project Length: 2.6 miles. All Traffic Types (Domestic & Foreign)
Sheet437 WESTCHESTER CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to East Tremont Avenue Bridge. Controlling Depth: 12 feet from East River to upstream limit project. Project Depth: 12 feet in channel and turning basin. All at mean low water. Project Length: 2.6 miles. Domestic
Sheet438 WESTCHESTER CREEK, NY (INCLUDED IN PORT OF NEW YORK)- Section Included: From East River to East Tremont Avenue Bridge. Controlling Depth: 12 feet from East River to upstream limit project. Project Depth: 12 feet in channel and turning basin. All at mean low water. Project Length: 2.6 miles. Foreign
Sheet439 WESTPORT HARBOR AND SAUGATUCK RIVER, CT- All Traffic Types (Domestic & Foreign)
Sheet440 WESTPORT HARBOR AND SAUGATUCK RIVER, CT- Domestic
Sheet441 WESTPORT HARBOR AND SAUGATUCK RIVER, CT- Foreign
Sheet442 WEYMOUTH BACK RIVER, MA (INCLUDED IN PORT OF BOSTON)- All Traffic Types (Domestic & Foreign)
Sheet443 WEYMOUTH BACK RIVER, MA (INCLUDED IN PORT OF BOSTON)- Domestic
Sheet444 WEYMOUTH BACK RIVER, MA (INCLUDED IN PORT OF BOSTON)- Foreign
Sheet445 WEYMOUTH FORE RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth to head of navigation. Controlling Depth: 34 feet in the 35-foot channel except 32.3 feet at siphon opposite King Cove, original siphon has been replaced. New siphon is below project depth. Project Depth: 35 feet from deep water in Boston Harbor via Nantucket Gut and Hingham Bay to a point about 2,500 feet above Fore River Bridge: 27 feet in channel between Nut and Peddocks Islands. All Traffic Types (Domestic & Foreign)
Sheet446 WEYMOUTH FORE RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth to head of navigation. Controlling Depth: 34 feet in the 35-foot channel except 32.3 feet at siphon opposite King Cove, original siphon has been replaced. New siphon is below project depth. Project Depth: 35 feet from deep water in Boston Harbor via Nantucket Gut and Hingham Bay to a point about 2,500 feet above Fore River Bridge: 27 feet in channel between Nut and Peddocks Islands. Domestic
Sheet447 WEYMOUTH FORE RIVER, MA (INCLUDED IN PORT OF BOSTON)- Section Included: From mouth to head of navigation. Controlling Depth: 34 feet in the 35-foot channel except 32.3 feet at siphon opposite King Cove, original siphon has been replaced. New siphon is below project depth. Project Depth: 35 feet from deep water in Boston Harbor via Nantucket Gut and Hingham Bay to a point about 2,500 feet above Fore River Bridge: 27 feet in channel between Nut and Peddocks Islands. Foreign
Sheet448 WICKFORD HARBOR, RI- All Traffic Types (Domestic & Foreign)
Sheet449 WICKFORD HARBOR, RI- Domestic
Sheet450 WICKFORD HARBOR, RI- Foreign
Sheet451 WILMINGTON HARBOR, DE- Section Included: West Shore of Delaware River from and including Pigeon Point, DE, to and including Edgemoor, DE, 4.4 miles; and May 1984, 40.1 feet. In the Christina River in October 1989, 33.5 feet to the upper end of Berth No. 3; thence in October 1989, 18.6 feet to Lobdell Canal, 1.2 miles; thence in May 1984, 11.3 feet to Market Street Bridge at Wilmington, 2.1 miles; thence January 1960, 13.2 feet to the former pulp works, 1.2 miles; thence January 1960, 5.8 fee t to Pennsylvania R R Bridge No. 4, 0.3 miles; thence 6.1 feet to Newport, 5 miles. Project Depth: In Delaware River, 40 feet, in Christina River, 35 feet to Lobdell Canal, thence 21 feet to the former pulp works; thence 10 feet to Pennsylvania R.R. Bridge No. 4, and thence 7 feet to Newport. All at mean low water. All Traffic Types (Domestic & Foreign)
Sheet452 WILMINGTON HARBOR, DE- Section Included: West Shore of Delaware River from and including Pigeon Point, DE, to and including Edgemoor, DE, 4.4 miles; and May 1984, 40.1 feet. In the Christina River in October 1989, 33.5 feet to the upper end of Berth No. 3; thence in October 1989, 18.6 feet to Lobdell Canal, 1.2 miles; thence in May 1984, 11.3 feet to Market Street Bridge at Wilmington, 2.1 miles; thence January 1960, 13.2 feet to the former pulp works, 1.2 miles; thence January 1960, 5.8 fee t to Pennsylvania R R Bridge No. 4, 0.3 miles; thence 6.1 feet to Newport, 5 miles. Project Depth: In Delaware River, 40 feet, in Christina River, 35 feet to Lobdell Canal, thence 21 feet to the former pulp works; thence 10 feet to Pennsylvania R.R. Bridge No. 4, and thence 7 feet to Newport. All at mean low water. Domestic
Sheet453 WILMINGTON HARBOR, DE- Section Included: West Shore of Delaware River from and including Pigeon Point, DE, to and including Edgemoor, DE, 4.4 miles; and May 1984, 40.1 feet. In the Christina River in October 1989, 33.5 feet to the upper end of Berth No. 3; thence in October 1989, 18.6 feet to Lobdell Canal, 1.2 miles; thence in May 1984, 11.3 feet to Market Street Bridge at Wilmington, 2.1 miles; thence January 1960, 13.2 feet to the former pulp works, 1.2 miles; thence January 1960, 5.8 fee t to Pennsylvania R R Bridge No. 4, 0.3 miles; thence 6.1 feet to Newport, 5 miles. Project Depth: In Delaware River, 40 feet, in Christina River, 35 feet to Lobdell Canal, thence 21 feet to the former pulp works; thence 10 feet to Pennsylvania R.R. Bridge No. 4, and thence 7 feet to Newport. All at mean low water. Foreign